Post Job Free

Resume

Sign in

Mechanical Engineer Project

Location:
Brampton, ON, Canada
Posted:
November 14, 2017

Contact this candidate

Resume:

WORK SUMMARY

Front End Engineering (FEED), Detailed Engineering, PMC role, prepared Technical Specifications and Mechanical Datasheets (MDS) for Rotating, Static and Packaged Equipment e.g. Pumps, Air Compressors, Air Blowers, Atmospheric Tanks, Pressure Vessels, Scraper Launchers, Sludge Catchers, Plant & Instrument Air Dryers, Fired unfired Heat transfer equipment, Boilers, Demineralization Plant, Sewage Lift Stations, Foam injection and Chemical Injection Skids, S&T/Plate & Frame type Heat Exchangers, API Separators, Pet Coke and Sulfur Conveyor Belts, Portal Reclaimer & Ship loaders, Marine Loading Arms and vapor recovery unit (VRU).

Bid Evaluated, Technically reviewed Vendor’s Drawings, Coordinated with Vendor for clarification, video and teleconference with different resources centers.

Headed a group of 17 engineers, conducted various aspects of management performance such as performance appraisal, counselling of employees with behavior/technical problem and assisted upper management in interviewing, hiring engineers and job assignments.

EMPLOYMENT HISTORY

KBR-AMCDE, KSA as a “Senior Technical Professional Leader” i.e. Department Manager (Mech. Equipment).

(05 April 2013- Oct.8, 2014)

Provided Design Consulting Services to KBR-AMCDE for all type of (Rotating, Static and Packaged equipment), FEED and Detailed design package mechanical documents’ review services for LPG and NGL (Commercial, Residential & Industrial) Projects.

KBR-AMCDE, Saudi Arabia as a “Chief Technology Engineer.”

(Sept. 2012- 04 April.2013)

SP7 NGL Offshore YANBU Refinery and Terminal Detailed Engineering Project, KSA.

(Mechanical Detailed Design package documents reviewed for Diesel, Gasoline, Benzene Pumps, Air Compressors, Ship Slop Tanks, Tower Cranes, Vapor Recovery Unit, Air Blower, Plant & Instrument Air Receivers, Dryers and Marine Loading Arms etc).

KBR-AMCDE, Saudi Arabia as a Lead Mechanical Engineer.

(April 2011-Sept. 2012)

Saudi Aramco Jazan Refinery and Marine Terminal (FEED) Project (Completed)

Prepared, assisted and reviewed Technical Specifications and mechanical datasheets for the all types of Rotating and static equipment such as Pumps, Atmospheric Tanks, Pressure Vessels, Spheres for JAZAN Refinery and Marine Terminals, Conducted video conference and Teleconference with different resource centers (London, Melbourne & Houston), Vendor Coordination, consultation and collaboration with other departments.

Worley parson, Saudi Arabia as a “Lead Mechanical Engineer.”

(March 2008-April 2011)

FEED PROJECTS

Saudi Aramco “Ras Tanura Refinery Expansion (FEED) Project.”(Completed)

Saudi Aramco “Sulfur expansion (FEED) Project.” (Completed)

DETAILED ENGINEERING

National Chevron Phillips (NCP)-Metering Skids Project (Sales Gas, Ethane and Propane), Jubail, Saudi Arabia- (Completed).

Saudi Aramco Total Refinery (SATORP) JER Project, Jubail, KSA -Conveyor Belt, Ship Loader, Portal Reclaimer, Pumps and Atmospheric Tanks etc. - (Completed).

Marafiq Project- Pumps, Compressors & sewage lift station. Saudi Arabia - (Completed).

SipChem Project Saudi Arabia-Heat Transfer Start up Heaters, Carbonate and inhibitor filters, ( (Completed)

Saudi Aramco (Abqaiq) General Engineering Services (GES) Project-Oily Water filtration system, ( (Completed)

Qatif KSA, Project Saudi Aramco-Scraper/Launcher - (Completed)

Worley Parsons, Toronto, Canada as a Senior Mechanical Engineer.

(July 2007Feb.2008)

FEED PROJECT

Titanium Detailed Engineering Project (USA) -Extension of Las Vegas Titanium Plant (completed)

Fluor Canada Limited, Calgary, Alberta as a Senior Mechanical Engineer.

(April 2006 –June 2007)

DETAILED ENGINEERING PROJECT

Saudi Aramco Petrochemical Project (VAM, AA & Utilities Projects) - Completed.

WORK DETAILS ON THE ABOVE PROJECTS

oPrepared Equipment Mechanical Data sheets and Technical Specifications.

oPrepared documents, Requisition for Quote (RFQ), Requisition for Purchase (RFP), Engineering Notes, Electronic Data Lists (EDL), Suppliers Drawing and Data Requirements (SDDR).

oCritical Rating Factors (CRF), Procurement Action Reports (PAR), Technical reports, Work Schedule, Weekly Progress Report.

oReviewed PFDs, P&IDs and approved Vendor’s Technical Drawings.

oTechnical Bid Evaluation.

oConducted Teleconference, Video Conference and attended Clients Meetings

oVendor Coordination for Technical Queries

oSupervise and prepared Technical Specifications and Equipment Data Sheets of the followings.

-Heat Transfer Start-Up Heaters - Carbonate and Inhibitor Filters

-Demineralized Water Plant -R.O. Plant,

-Steam Ejectors -Asphalt Plant

-Boilers Deaerator -Air Compressors

-Heat Exchangers -Storage Tanks

-Pressure Vessels -Vapour recovery Units

-Nitrogen Package -Instrument Air Package, Foam injection skids

oReviewed design for technical completeness and conformance in accordance with relevant codes, ASME, TEMA, API, ANSI, NFPA standards, and rectified complex engineering design problems.

oFully conversant with Saudi Aramco Standards (SAEP, SAES, SAMSS & SABP) and SATORP Standards.

GlaxoSmithKline, Canada as a Technical Team Member.

(Oct. 2001-March 2006)

Provided technical support, production change out set-up support, prepared First of Reports and Production Reports.

Assisted to prepare production and line clearance documentations.

Monitored packaging on production line for quality control purposes.

Developed packaging system for fast production.

International Engineering Consultant through KW&SB Project Management Team as

Senior Project Manager

(Jan 1989-Sept 2001)

Managed KW&SB Pumping Station’s development projects, planned and controlled budgets.

Controlled 5 Divisions and their pumping development works by coordinating and solving engineering issues in timely manner to avoid delay in completion of the projects.

Coordinated all relevant project activities by approving technical drawings, monitoring project progress, issuing technical directives, and implementing site safety rules

Ensured project’s overall objectives, standards, quality and user needs were met by identifying and mitigating project risks and issues.

Reviewed and developed technical designs and drawings for its implementation at site.

Coordinated with other disciplines for construction support and issued directives to the Assistant Project Engineers for its implementation.

Lead and monitored for renovation of old pumping stations and development of the new pumping station projects.

Ensured compliance with procedures and drawings by supervising and solving site construction and installation problems

Tested, commissioned and handed over the projects to the operation and maintenance departments.

Completed more than 75 Municipal Boosting/Pumping Stations and installed more than 400 Centrifugal and multistage deep well turbine pumps, electric motors and electrical panels.

King Saud University Project Riyadh with Saudi Services and Operating Company, KSA. as a Maintenance Manager / Planning Engineer.

(Nov. 1985 - Dec.1988)

Maintained preventive, corrective and periodic maintenance of the following plants:

Boilers (Babcock and Wilcox) 185kg/hr saturated steam (6 Units)

Chillers (Career) 5000 refrigeration ton/hr. from 14.5 C to 4 C

Gas Turbines (John Brown) 16.2 Mw each (4 nos.)

Water Plant (Capacity 10 mgd)

Sewage Plants (Capacity 10 mgd)

And Electric fired Incinerators. (5 Units)

Karachi Water & Sewerage Board (KW&SB), Karachi, Pakistan as a Project Engineer.

(July1980–Oct. 1985)

Prepared Tender documents (RFQ), Engineering Notes, SDDR, CRF, PAR, Technical Data Sheets, Technically Bid Evaluated, Prepared technical reports, approved vendor’s technical drawings and recommended to award contracts to the successful bidders

Completed $11M USD World Bank Project no.1374 PAK and procured Coles Crane from U.K, Sewage Pumps from Poland, Flygt Submersible Pumps from Sweden, Sluice V/V, from India, Gate V/V from China, Compressor for USA, KSB Multistage Turbine Pumps, Siemens Squirrel Cage Induction motor and Electric Panel from Germany.

Supervised and provided support to the installation and construction at site and ensured timely completion of the project.

Coordinated with Project Manager for advice to follow drawings and DCNs in construction and installation of pumping units.

Special Steels of Pakistan Limited as a Trainee Engineer.

( Dec.1978-June 1979)

Obtained training in different departments like Ingot shop, Billet Shop, Pellet Shop, Rolling mills, Planning and Production etc.

EDUCATION

B.E. (Mechanical) from N.E.D. University of Engineering & Technology, Karachi.

Engineering Management Course from Chalmers University, Sweden

Diploma in AutoCAD 2002, Master Cam (V9) and Quality Control from North Town Technical Institute Toronto, Canada

LICENSE AND PROFESSIONAL AFFILIATION

Ontario Association of Certified Engineering Technology & Technologists (OACETT), License holder and Member.

Member of Pakistan Engineering Council (P.E.C)

Member of Institute of Engineers (A.M.I.E.)

Member of Saudi Council of Engineers (SCE)

NOTE: - I possess experience as a “Technical Professional Leader” with three world class EPC companies and possess Western and Eastern working environment exposure.

a)FLOUR- CANADA

b)WOORLEYPARSONS- CANADA & KHOBAR (KSA)

c)KBR- KHOBAR.

XXX



Contact this candidate