Post Job Free

Resume

Sign in

Thermal power plant mechanical lead.

Location:
Bhopal, MP, India
Salary:
neogotiable
Posted:
January 29, 2018

Contact this candidate

Resume:

SANJEET KUMAR GHOSH

Contact: 91+999*******; 91+989******* E-Mail: ac38m8@r.postjobfree.com

Seeking a challenging and rewarding opportunity in the field of Thermal Power Station(Project management,Erection, Commissioning,Operation& Maintenance) of overall unit(BTG & BOP).

CAREER CONSPECTUS

Nearly 17 years of rich experience in Project Management, Plant Maintenance, Strategic Planning, Resource Management, Inventory Management and Team Management.

Associated with TRN energy pvt ltd 2X300MW.(prithivi infratech pvt ltd.) as aoperation of BTG and BOP Head /Site Manager from 2/01/2017 to till continue.

Associated with R.K.M. Power Gen Pvt LTD. Kharsia,4*360MW As Sr. Coordinator (BTG)Turbine& Boiler(BOP some part) commissioning from 23Rd April 2014 to 27th December 2016.

Associated with Monnet Ispat & Energy Ltd.(C.G.) as a Asst. Manager Mechanical maintenance (2X90MW) BTG & BOP from 22nd June 2013 to 22nd April 2014.

Associated with Punj Lloyd Ltd., Gudgaon, HARAYANA as a Sr.Engineer-600 MW (300*2) Power Plant (Erection & Commissioning)Site at chandrapur(M.H.)2x300MW Thermal power plant

Expertise in managing maintenance operations for reducing breakdown / downtime & enhancing operational effectiveness of equipment.

Adroit in planning, executing and spearheading projects involving method engineering, development, contract administration, resource planning with a flair for adopting modern construction methodologies in compliance to quality standards.

Skilled in swiftly ramping up projects with competent skills and ensuring on time deliverables.

Excellent communication & interpersonal skills with strong analytical, team building, problem solving and organizational abilities.

Adept at carrying out various tests & inspection for various processes and checking the quality.

A strategic planner with competency in devising significant solutions, and implementing health safety management systems for maintaining sound environmental and safety conditions.

An effective communicator with excellent relationship management skills and strong analytical, leadership, decision making, problem solving & organizational abilities.

AREAS OF EXPERTISE

Project Management ~ Maintenance Management ~ Power Plant Management ~ Shutdown/ Start up Operations ~Boiler, Turbine & auxiliaries(BTG), (BOP)Coal handling, ash handling plant, Dm& PT plant, Raw water pump house,CW,ACW pump house, Cooling tower, compressor, LDO,HFO pump house ETC. management ~ Safety Management ~ Erection/Commissioning ~ Testing / Installation ~ Planning & Scheduling ~ Energy Conservation ~ Troubleshooting ~ Cross Functional Coordination ~ Crisis Management ~ People Management

CORE COMPETENCIES

Project Management

Spearheading project activities involving working out various requirements & monitoring overall project operations for ensuring timely completion of Commissioning activities.

Overseeing all technical & managerial aspects, developing various reports on performance analysis and handling planning for better productivity.

Plant Maintenance

Planning & implementing preventive, predictive & breakdown maintenance schedules for improving the overall reliability and safety of plant equipments& machinery.

Implementing and maintaining all the activities in area of production, maintenance, new facility planning and training as per set standards.

Preparing annual maintenance schedule calendar & annual action plan for critical breakdown.

Reviewing history records of key machines for repeated breakdowns to analysis and carrying out necessary corrective actions.

Erection & Commissioning

Anchoring erection & commissioning of machines &equipments and ensuring completion of project in minimum turnaround time effective resource utilisation to maximise the output.

Overseeing installation & commissioning as well as conducting tests & inspections to ensure operational effectiveness of utilities; planning & effectuating maintenance plans for machines and equipments.

Team Management

Leading, mentoring & monitoring the performance of team members to ensure efficiency in process operations and meeting of production targets.

Reviewing employee performance and preparing annual training plan for maintenance department.

Creating and sustaining a dynamic environment that fosters development opportunities and motivates high performance amongst team members.

EMPLOYEMENT RECITAL

Organisation : PUNJ LLOYDS LTDFrom 15/03/2010 to 20/03/2014

Designation : Sr.Engineer (Power Project)

Duration : Since March'2010

Current CTC : Rs.6.5 L .p.a.

About the Company:Punj Lloyd provides integrated design, engineering, procurement, construction and project management services in the energy and infrastructure sectors. With operations spread across the Middle East, Africa, the Caspian, Asia Pacific and South Asia, Punj Lloyd provides EPC services in Oil & Gas, Process, Civil Infrastructure, and Thermal Power. Further, Punj Lloyd is today a diversified conglomerate, owing to its successful foray into aviation, defence and upstream, through its subsidiaries and joint ventures. The expanding list of satisfied clients reflects our ability to execute challenging projects, despite all odds. Difficult weather or terrain has been no deterrent to our team which has delivered consistently and brought accolades to the company. The high percentage of repeat orders stand testimony to this. We have achieved many milestones and broken many records. As a reflection of our international quality standards, construction and project management techniques, Punj Lloyd holds ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007 certification.

Roles & Responsibilities:

Managing the functions of the following:

Involvement in the Commissioning activities and maintenance of the 4X360 MW, 2X300 MW make Chinese Turbines and 1015,1220 TPH PF boiler

Inspection of the jobs which are completed by Chinese(,BHEL,ALSTOM,SIEMENS),and raising all the irregularities regarding the quality of work, operation feasibility, equipment readiness, equipment accessibility etc by giving a detailed punch list to the Client M/s DHARIWAL INFRA.

Successfully stabilizing the Boiler’s, STG’s, Motor Driven Feed Pumps and providing continuous steam and power.

Increasing the reliability of the IPP by doing various logic modifications, modifications for operation and maintenance ease.

Identifying the bottle necks of the IPP and doing the trouble shooting exercise

Successfully achieved the full load of the boiler on Indonesian coal

Responsible for carrying out plant maintenance activities which includes Blend plant, filling & packaging plant, and utilities.

Develop preventive/predictive maintenance plan in coordination with operational team and ensure timely implementation of the plan.

Ensure the compliance to legal and statutory provisions; ensure engineering contractor to deliver the quality jobs in compliance to the /IM policy and legal framework.

Responsible for conceptualization, design and execution of projects & modifications.

Responsible for identification, development and negotiation with various suppliers and contractors related to engineering purchase and contract job.

Mentoring for Jr. Colleagues; coaching and developing engineering technicians; sustained efforts in engineering team building.

Responsible for executing plant modifications, up-gradations related projects and routine maintenance activities in timely manner.

June 2008 – March 2010 with M/s Orient Paper Mill Ltd.Amlai (Madhya Pradesh) as Asst.Engineer (Maintenance) POWER PLANT DETAILS-:3*25 MW-CFBC Boiler, Stoker Fired Boiler.

March 2007 – June 2008 with M/s Tata Project Ltd. Hyderabad (Andhra Pradesh) as Jr. Executive (Project) POWER PLANT DETAILS-:2*165 MW, 1*160MW.

Aug 2006 – March 2007with M/s Wartsila India Ltd. Lanjigarh (Orissa) as Executive (O & M) POWER PLANT DETAILS-:3*30MW-PFBC BOILER.

Oct 2005 – Aug 2006with M/s Sks Ispat Ltd. Raipur(Chhattisgarh) as Asst.Engineer

POWER PLANT DETAILS-:1*25MW-CFBC BOILER, WHRB BOILER.

Oct 2004 – Oct 2005with M/s Prakash Industries Ltd. Champa (Chhattisgarh) as Shift Incharge (Maintenance) POWER PLANT DETAILS-:2*25MW-AFBC BOILER.

Feb 2000 –Oct 2004with M/s Alpha Power Engineering Services Ltd.Korba(Chhattisgarh) as Diploma Trainee Engineer Site In charge

POWER PROJECT DETAILS-:1*120MW, 1*210MW, 2*300MW-PF BOILER

SCHOLASTICS

DIPLOMA(Mechanical Engineering)from M.P. Board of Technical Education in 1998.

ADDITIONAL QUALIFICATION

CNC (Programming &Operation)-CNC Milling, Turning & Wire Cut from Indo German Tool, Indore (Madhya Pradesh) in .2000

Computer Skills

Ms-Office, Auto Cad, MS-DOS, WINDOWS-98/XP/VISTA/7 and Internet Applications.

PERSONAL DOSSIER

Date of Birth : 13th July 1975

Address : Kosha Nagar (Dixit Nagar) Street No.06, Post-Nehru Nagar, Bhilai, Dist-Durg

(CHHATTISGARH) 490020

Languages : English, Hindi & Bengali.

Present Job: Commissioning maintenance of Boiler & turbine, BOP boiler pressure parts,Non pressure parts and auxiliaries of PF type Boiler(4X360MW) capacity 1220 TPH, Rotary equipments. making schedule every equipments like lubrication Fit up checkups maximum body and foundation & base bolts, maintain of Equipment history sheet, defect register, check running hrs, abnormality of behaviour, following manuals & current updating for technical data’s, calling to vender of manufacture, keenly following indents, attending some punch points to facilitate O&M team,following of all SOP’s which has make easy &,comfortable in between Operation and Maintenance team .we follow & maintain all manner of O&M members ideas and suggestion,meeting attend and deep discussion, Follows our HODs optimum instruction, follow and maintain all quality and safety . every preventive maintenance take isolation work permit and safety norms, which has doesn’t be occur our job assignment,we maintain good relationship in between all members as team work, also calling demonstrator for new events of modification of tools & tackles, follow very sound technical,we also follow digital systems which has very beneficial for aureate results, time saving easily approach to co activities, meth logy should smooth and comfortable for every skills and un skills, we also follow the techniques and ethics, be aware of safety norms which has conducted time by time safety persons, we also follow modification tools time by time which easily available at market and should be loss our valuable time,keep on our mind always assignment,BTG and BOP side specially in mechanical good coordination of concern person and team, roll should be trouble shooter, adaptability of system and culture, good services providing for satisfaction,target achievement should be motto. Providing good services for organization call localness and honest. Mind should be innovative and creative which beneficial for organization. making best Environment for team and organization. Which assignment has completed and achieved as above mentioned below.

1)Boiler pressure line valves class wise lapping of shit blue matching many types.

2)Boiler pressure parts leakage attended of reheat or, dividend super heater,wall tubes,demeetering, analysis and RLA Etc.

3)Boiler Non pressure parts ducting reaper and patching work Etc.

4)Boiler rotary parts PA,FD,ID and seal air fan preventive &predictive maintenance, static balancing in local mood, lube system filter cleaning,monitoring vibration Etc.

5)Turbine MOT cleaning, all motorise valves checking, all type bearing clearance cheeking, all type of ARV & PRV setting,condenser tube cleaning,mock test of tube alignment with tube sheet and fitting welding and hydro test completed,CEP float cheeking,mechanical seal,all stage of impellers checking with housing bush and barrel alignment etc.

6)Turbine LP casing dish melting and HIP casing and box up,all bearing clearance with tilting pads checking,blue matching,seal bore reading all turbine auxiliaries MDBF,CW,ACW,CCW(DMCW),AOP,JOP, EH oil system,Stator water, seal oil skid etc.

7)IDCT(induced draft cooling tower) blade angle changing according to seasonal Etc.

8)BOP side compressor many type like screw,centrifugal,reciprocating preventive and predictive maint., bottom ash handling bed Ash & fly Ash and silo and pump house pump priming and cavitations Etc.

9)Dom valve seal changing,Dom valve hard facing line chocking Etc.

10)CHP area Belt joint(cold balkanising),breakdown of crusher,crusher hammers setting and balancing,stacker cum declaimer Oil seal leakage attended ETC.

11)All type of centrifugal and vertical pumps repaired .

12)FOPH(oil station) area strainers cleaning (Bucket Type),drain tank cleaning, repairing of HFO heaters,oil side coolers gasket changing and shut down time LDO & HFO tank cleaning all respective valves checking all type of gland packing changing,all type gasket changing and All type valve servicing Etc.

13)Fly Ash silo top Filters cleaning with in shutdown period etc and all regarding problems short out Etc.

14)Fly Ash conditioner vibero feeder maintenance work completed Etc.

15)Coal mill Ball mill& bowl mill grinder wheel setting and maintain gap as per require,gear box and bearing changing Etc.

16)Couplings Alignment BY angulated method various type coupling Etc.

17) Boiler drum safety valve settings with working and designed pressure and valve lift up setting Etc.

18)Boiler gauge glass(port type) repaired, and charging techniques etc.

19) Coal feeder (gravimetric pressure belt type)and scraper type feeder chain changed Etc.

20)Coal Bunker top Two way Chute and Three way Chute travelling tipper and flap triangular gate system commissioning and O&M completed Etc.

21)DM &Pt plant clarifier and flock later and tube shelter erection,Commissioning and O&M Etc.

22)SWAS panel erection, commissioning and O&M Etc.

23)Four way of city basin cleaning with acid clean completed with before time.

24)Many type structure modification completed for smooth O&M and punch points Etc.

25)Safety tools providing and making safety spas age for safe full work along with work permit and good communication with all respective seniors and colleagues Etc.

Date:-

Place:- SANJEET KUMAR GHOSH



Contact this candidate