Zhaoliang (Joseph) Wu
*********@*****.***
PERSONALITIES
• Quick learner
• Data analysis ability
• Team leading ability
• The enthusiasm for working with teams
• Anti-pressure ability
• Self-motivated ability
• Ability to solve a problem independently
• Ability to solve a problem from the engineering perspective
• Time management ability
• Reservoir modelling and simulation ability
• Economic evaluation ability
SKILLS
• Technical knowledge of petroleum engineering
• Office software (Word, Excel, PowerPoint and etc.)
• Reservoir Simulator CMG (STARS, CMOST and etc.)
• AccuMap
• Interactive Petrophysics
• SPSS
• Mandarin and English
• Alberta Class 5 Driving License
EDUCATION
Bachelor of Science in Petroleum Engineering September 2012 - June 2016 School of Petroleum Engineering, China University of Petroleum September 2012 – August 2015
Schulich School of Engineering, University of Calgary September 2015 - June 2016 Cumulative GPA: 3.85/4.00
Master of Engineering in Petroleum Engineering
September 2016 - April 2018 (Expected)
Schulich School of Engineering, University of Calgary Cumulative GPA: 3.875/4.00
SCHOLARSHIPS
Academic Scholarship 600 CNY (120 CAD) June 2013
Academic Scholarship 5000 CNY (1000 CAD) June 2014 Academic Scholarship 3000 CNY (600 CAD) June 2015
INTERNSHIP & CO-OP
SHENGLI Oilfield June 2015 - August 2015
• Learned and simulated the entire procedure for developing a brand-new reservoir
• Wrote the final report to present the whole procedure of developing a new reservoir
• Learned the mechanism for different drilling rigs, drilling fluids, fishing tools, casing, tubing, packers and etc.
• Learned the mechanism for different types of production pumps and operated the real model to understand the mechanism
PetroChina International (Canada) Trading Ltd. October 2017 – April 2018 (Expected)
• Investment & Planning, Marketing, Business Development Department
• Gathered and analyzed data to help the department make business decision
• Analyzed reserve reports to evaluate the market cap of Sequoia Energy Ltd. in the next decade
• Provided suggestions from engineering perspective to help the department to make investment decision
• Searched data and materials about LNG to help the department to make LNG export decision
• Developed a quantitative model in SPSS for FX USD/CAD analysis and prediction ENGINEERING PROJECTS
Geological consideration for drilling a new vertical well in Southwest Alberta September 2015 – December 2015
• Gained and collected data about eight offset wells from AccuMap software to analyze the information about target area
• Analyzed geological information about target area to predict formation tops, lithology, pressure gradient and target pay zone for the new vertical well
• Analyzed well-logging documents to confirm prediction
• Wrote final report with another teammate to present the results Polymer flooding versus hot water injection in Pelican Lake Reservoir September 2015–April 2016
• Gained and collected injection history and data about polymer flooding and hot water injection in Pelican Lake
• Built CMG model and completed history match to prove the model correctness
• Simulated hot water injection in Pad SW09 to compare oil production of polymer flooding and hot water injection
• Wrote final report to present results
Reservoir Simulation Optimization for a SAGD project September 2017–December 2017
• Built the reservoir model according to the known reservoir dimension and parameters in CMG
• Analyzed the formation and used CMOST to find the optimal development option initially
• Found the optimal NPV in the next decade by changing well location, well constrains, preheating time and etc.
• Wrote the final report to present the result
ENGINEERING COMPETITIONS
National Training Programs of Innovation for Undergraduates September 2012 – June 2013
• Prepared different drilling fluid and designed experiments to get properties of drilling fluid
• Worked with a team of five to analyze the dispersed nature of Nano-barite in different type of drilling fluid
• Wrote the final report to introduce our results
Oil Drilling Machinery Design Competition, Second Prize November 2013
• Designed the structure of a drilling truck to get the blueprint of our model
• Made and tested the drilling part of the model with a team of six to complete the model
• Wrote the instructions for the model to present our drilling truck Mathematical Contest in Modeling (USA), Honorable Mention February 2015
• Built the economy model to calculate the cost of transporting pills on different routes
• Worked with a team of three to build a more complicated model with consideration of cost, distance, time and labor to get the optimal route to transport the pills
• Wrote the final report with a team of three to present our results PART-TIME JOB EXPERIENCE
Cashier November 2016 - April 2017
Dalhousie Safeway, Calgary, Alberta. Customer Service, checking groceries, handling of cash, bagging groceries and etc.