OURTEMACHE HAKIM
CURRICULUM VITAE
Personal information:
Name: OURTEMACHE
First name: HAKIM
Date & birthplace: 19/02/1971 in Algiers
Nationality: Algerian
Marital status: married with a child
Email: ac37r1@r.postjobfree.com
Tel.: 00-213-*********
Diplomas:
- Baccalaureate sciences
- High technician in electrical engineering
- Network and hardware application engineer
2001 - 2002:
- Instrumentist in charge of work of Electrical Précommissioning & commissioning in the site power plant Hassi Messaoud Western 3x110 MW Algeria
- Preparation the instrumentation work for the performance test GE gas turbine Frame MS 9001E in the site power plant 3x110 MW Hassi Messaoud. Algeria Company: Sonelgaz
2003 - 2004 –
Electrician in charge of Electrical work and preparation systems for the commissioning in the pumping station Sonatrach SZ1.3 Company: RE el service/SAIPEM
2004 -2005 –
E & I supervisor commissioning in pumping station SONATRACH SZ1.3 Company: RE el service/SAIPEM
2005 - 2006 –
- Supervisor in charge of Electrical punch list of gas turbine GE MS 9001E (3X110 MW) site power plant TG Hassi Messaoud Algeria
- Instrument supervisor in charge ofi punch list of gas turbine GE MS 9001E (3X110 MW) power plant TG Hassi Messaoud Algeria
- Preparation of the electric work for the performance test Company: RE el service/GE Nuovo pignone Gabled
2006 - 2007 –
Electrical & instrument supervisor Précommissioning & commissioning in the station of recovery of Gas associate with Hassi rmel. Company: EGPS /GE OIL & GAS
2008 -2009
- Electrical commissioning in different system in cycle combined power plant 1200 MW in the site Hadjaret Nass Algeria
- Instrumentation supervisor précommissiong the the site power plant of LARBA Company: SOCGMI/ANSALDO ENERGIA
2009 -2010
Electrical & instrument supervisor for various revisions IPC, IC of gas turbines (Frame 9, Frame 5, 6 in various sites Company: EGPS/GE - ALGESCO
2010 -2011
MKII upgrade to MKVIe:
• Site: power plant of Naama, Algeria
• Unit: Gr01
• Type of Machine 5001P
• Machine SN: 281779
Mark II Wires mark up and removal
Mark II Panel Removal and new Mark Life installation
Pulling new cables & Mark Life connections
Cold loop checks
Company: EGPS/GE
2011 -2012
MKII upgrade to MKVIe:
• Site: power plant of Boufarik Algeria,
• Unit: Gr04
• Type of Machine 5001P
• Machine SN: 281779
Mark II Wires mark up and removal
Mark II Panel Removal and new Mark Life installation
Pulling new cables & Mark Life connections
Cold loop checks
Company: EGPS/GE
2013 – 2014: (international contract)
- Operator Gas Turbine Turbomach 2x 5 MW and 3x10 MW and all BOP.
(After commissioning phase)
Site: El Golea Algeria
Company: Cegelec Oil & Gas Division Abu Dhabi Branch / Turbomach
2014 – 2015:
E & I commissioning and operation gas turbine GE TM2500+
Site power plant Hamma Algeria
Company: IRMA / GE
Professional knowledge :
- System control GE gas turbine speedtronic Mark II, Mark V, Mark VIe
- Protections of the transformers of power
- Protections of the alternators
- Systems anti pumping of the compressors
- Regulation of tension alternator
- Formation on COSWING/GEMAO level 5 and 7i last
- Starting of the groups (Turbine and alternator)
- Tests of performances of the groups -
To intervene on the central fire protection system and groups
- To intervene on the various works of the power station tables MCC, UCP, DCP,
fire fighting system
(Station gas)
- Maintenance left instrumentation and electric the plants for Gas turbine
Reading Languages Writing Spoken:
- French: Well
- Arab: Well
- English: intermediate level