Post Job Free

Resume

Sign in

I have good Skills and experience in instrumentation and controlling

Location:
Faisalabad, Punjab, Pakistan
Salary:
As Per company policy
Posted:
January 27, 2018

Contact this candidate

Resume:

OBJECTIVE:

To be an Integral part of a team, contributing with knowledge, dedication, commitment and innovation for the progress of an organization and personal growth by utilizing mental and physical capabilities with available resources to my best.

QUALIFICATIONS:

DAE

Diploma of Associate Engineer In Instrumentation From PBTE Lahore.

MATRIC

Matric with Science From Board of intermediate & Secondary Education(FSD).

COMMUNICATION SKILLS/PROFICIANCY

•English…. Reading, writing & Speaking.

•Urdu…… Reading, writing & Speaking.

•Arabic… Reading

PROFESSIONAL EXPERIENCE: (HANDS ON DOING)

Instrument Technician in Sitara Chemical Faisalabad.

Work as a Instrument Technician and also Worked in Shutdown, Troubleshooting Corrective, Preventive, & Breakdown maintenance of SCD (Safety Critical Device) Conventional, HART & SMART compatible field & Control Room Instruments. Erection and Commissioning. Before Execution, Consulting work Procedures, P& I Diagrams and preparation of job in sense of taking calibrator or any other tool, which required for the job. Calibration of all Secondary Instruments as per ISO standards. Involved with installation Calibrations & Commissioning of all various types of Instruments. Complete loop checking during plant commissioning.

•PLC S7 400 Panels Termination and loop testing from Panel to Panel & Panel to Field.

•Emerson Process Management Delta V Panel termination, loop testing and commissioning.

•Waishaupt Burner Panel termination and Commissioning.

• Removal / Installation /Adjustment and calibration of Pressure Gauges, Temperature Gauges and Controllers.

•Coupling of PLC S7 400 SEVACON panels. Page 1/4

•Removal / Installation of TACHO Metering Motors and thermisters.

•Scheduled and Unscheduled Maintenance of ATLAS COPCO Air Compressors. (ZR 250 VSD).

•Maintenance of Waishaupt Gas Boiler and Flue Gas Analyzer.

•Maintenance of Flow Meter Systems and. Thermocouples System.

•Extensively worked on Waishaupt Gas / Fuel Burner (Heat Exchanger).

•Well versed with process control Instrumentation Systems, Operation, Maintenance and Adjustments.

•Scheduled and Unscheduled Maintenance of water treatment Plants, Cooling towers

•Installation of Pressure Transmitters, Pressure Indicators Switches, RTDs, and Lip control valve.

•Installation of cable Treys and Conduits pipes.

• Scheduled and Unscheduled Maintenance of Chillers and Nitrogen, Generators.

■ Calibration Of Instruments:

1. Calibration of Level Transmitters and Pressure Transmitters Using HART communicator.

2. Calibration of Pressure Gauges using Dead Weight Tester.

3. Calibration of Pressure Transmitter using Dead Weight Tester. (WIKA).

4. Calibration of Dynisco Pressure Transmitter using Dead Weight Tester.

5. Calibration of Temperature Gauges using Thermo Bath.

6. Calibration of Control Valves (PS2).

Ibrahim Fiber(Coal Fire Power Generation Plant 21 MW).

Work as a I &C Lead Man during the Erection And Commissioning of Coal Fire Power

Plant having generation Capacity 21MW Christof Austria Made from Aug 2016 to update.

•Understand to read PID drawing, Hookup drawing, and Loop circuit drawing.

•Panel’s erection works Emerson (Delta V), ABB inverter panels, NATUS MV panels.

•Instrument installation according to instrument Hookup drawing.

•Installation, assembling and commissioning of Over Head Cone Crane capacity of 25t, 3.5t.

•Team work with TGM KANIS team for the commissioning and loop testing of Stream Turbine and Generator.

•Adjustments of Vibration sensors, Speed sensor and Axial sensor

•Commissioning and loop testing of Water Treatment (ENVIRO CHEIME).

• Commissioning and loop testing of Cooling Tower.

•Erection and Commissioning, loop testing of Screw Air compressor (BOGE).

• Locking and Unlocking of pressure Safety Valve for the lines Hydro testing during Pipe line Commissioning.

•Installation of Boiler instruments according to PID drawing.

• Pre Inspection of all received material relative to E & I.

•Panels interlocking wiring and panels inspection with commissioning team.

•During loop testing skilled to use HART communicator, Loop calibrator and Decade box.

•Supervision of cable laying and Control termination.

•Calibration and zero adjustments during the loop checking activities.

Page 2/4

Calibration,Troubleshooting & maintenance of all types Instrument.

Control Valves:

Control vales overhauling, field servicing and calibration with pneumatic,

electro-pneumatic DVC 6000 series positioners (Fisher,Masoneilan, Arca,Auma,)

Analyzer:

Worked on PH & Conductivity,SO2,CO,O2,NO and SiO2 Analyzer

(Yakagawa, ABB,Swan,Dr Foedisch )

Transmitter:

Rosemount, YokoGawa, Honeywell

Flow meter:

Mag flow Meter (Yokogawa, ABB, Krohne, YamaTake)

Mass Flow meter (ABB, Yokogawa)

Vertex Flow meter:

Yokogawa

Controllers:

Yokogawa (UT 550, UT 520, US 1000)

Honeywell (UDC 9000)

Weighing Scale Indicator:

Leon Engg Delta-5, Avery Weigh-tronix

Switches:

Float type magnetic switches, Diaphragm Pressure switches

Temperature Measuring Instruments:

Different types of thermo-couples, RTD, Local

Temperature Ind.

Communicator:

Operated the field communicator (Fisher 375, ABB TH691,

BT- 200 DHH805,Emerson-475).

Maintenance Work Responsibilities:

•Pressure gauges (Ashcroft, nouvafima).

•Converter (P/I, I/P).

•Proximity Switches & Sensors.

•HCL furnaces control system.

•Burner Control System.

•Air Compressors & Air Dryers.

•RO, Demi Units.

•Panel fabrication.

9. Spark Detection and Extinguishing Systems. page 3/4

Flow Tronix (PVT) Ltd Lahore.

Worked as Assistant Instrument Technician in Erection and commissioning

attock petroleum limited.

•Cable lying, cable Dressing and Panel Termination.

•Installation of Pressure Gauges, Temperatures Gauges and Controllers.

•Lying and Termination of Different kinds of Instruments Control Cables

•(Profi Bus, mod Bus, Field Bus )

•Installation of Thermocouples, RTD on Pipe Lines and Connections to Panels.

•Tagging of instruments according to PID diagram

•Installation of instruments according to hookup drawing .

Reference: Will Be Furnished On Demand. Page 4/4



Contact this candidate