Post Job Free

Resume

Sign in

Civil Engineer, Construction and Design Engineering

Location:
Iligan City, Northern Mindanao, Philippines
Posted:
January 26, 2018

Contact this candidate

Resume:

R E S U M E

A. PERSONAL DATA:

Name : ROBERT JABINES ALFECHE

Nickname : Boy

City Address : Don Paterno Luym Sr. St. cor. Columbine St., New Frontier Court Subdivision, Bayug, Iligan City 9000, Philippines

Provincial Address : Lanao Del Norte

Name of Purok : -

Telephone Numbers : (063-***-****;(063-***-****;(088-***-****

Personal Cellphone : 092*-***-**** (Sun); 090*-***-****

E-mail Address : ac369n@r.postjobfree.com ; ac369n@r.postjobfree.com

Date of Birth : February 02,1962

Place of Birth : Torralba Street, Iligan City

Age : 55

Marital Status : Married

Nationality : Filipino

Sex : Male

Height : 170 cm. (5’7”)

Weight : 72.56 kg. (160 lbs.)

Religion : Roman Catholic

Dependent Name/

Date of Birth : Joshua S. Alfeche / 28 October 1997

SSS Number : 08-06902894

TIN : 101-415-269

Pag-ibig Serial No : RJA-0226-SP

Blood Type : “O+”

Passport Number : EC1090057; Date Issued:05-14-2014; Valid Until: 05-13-2019

NBI ID Number : (Renewal on-progress)

Voter’s Serial No. : -

Precinct Number : 0438A

Barangay : Santiago

Languages or Dialects

(Speak and Write) : English, Visayan, Tagalog

and Cebuano

Spouse Name/

Date of Birth : Jocelyn S. Alfeche / 02 July 1964

Father’s Name : Marcelo Paradela Alfeche

Occupation : Retired PC/INP

Mother’s Name : Teodula Bacamante Jabines

Occupation : Housewife

Both Address : No.12 4th East Rosario Heights

Tubod, Iligan City 9000, Philippines

Person to be contacted

(In case of emergency): 1. Marcelo P. Alfeche

No.12 4th East Rosario Heights

Tubod, Iligan City 9000, Philippines

Tel. No. (063-***-****

2. Marilou J. Alfeche

No.12 4th East Rosario Heights

Tubod, Iligan City 9000, Philippines

Tel. No. (063-***-****

3. Jocelyn S. Alfeche

No.14 Orion St., Villa Ernesto Subdivision,

Gusa, Cagayan De Oro City 9200, Philippines

Tel. No.: (088-***-****; 092*-***-****

B. EDUCATIONAL BACKGROUND:

COLLEGE : Cebu Institute of Technology

Fatima, Cebu City

1980 – 1983

: St. Peter’s College

Sabayle Street, Iligan City

1978 - 1980

Highest Certificate/

Degree Obtained : BACHELOR OF SCIENCE IN CIVIL ENGINEERING (BSCE)

SECONDARY INTERMEDIATE

SCHOOL : La Salle Academy

Pala-o, Iligan City

1974 –1978

Highest Certificate

Obtained : HIGH SCHOOL DIPLOMA

PRIMARY SCHOOL : Kamague Community School

Tubod, Iligan City

1972 – 1974

: St. Michael’s College

Quezon Avenue, Iligan City

1967 - 1972

Highest Certificate

Obtained : ELEMENTARY DIPLOMA

COURSE GRADUATED : BACHELOR OF SCIENCE IN CIVIL ENGINEERING (BSCE)

Vocational Course

Completed / Certificate: DRIVING

Cabili Hall, Iligan City National High School

Iligan City

1985

Special Skill : Typing

Others : Computer Software Literate (Basic, Wordstar,

DatabaseAutoCadd, Microstation, Microfea – II,

Staad – III version 20 and Sand, etc.)

Special Achievement

Certificate : Basic programming

Computrade Philippines, Inc.

Iligan City, Philippines

April 1986 – June 1986

C. LICENSE ISSUED:

CIVIL ENGINEER

License No. 0036537

Valid Until: 02-02-2021

DRIVER’S

License No. M02-90-014291

Valid Until: 02-02-2022 (O.R. 102******* dated 02-02-2017)

D. WORK EXPERIENCE:

JANUARY 2010 – PRESENT 2016 : SITE MANAGER/SUPERVISOR/ENGR.

On-Call Project/Freelance Project (Private)

Don Paterno Luym Sr. St. cor. Columbine

St., New Frontier Court Subd., Bayug,

Iligan City

Brief Description of Job Performance:

Civil / Structural engineering design calculation of structures, foundation

Preparation of project bill of materials and cost estimate

Prepare detailed drawings, technical specifications, pipe supports, checking and marking-up of construction drawings sorting-out of field technical problems and gather data in actual field survey

Application and process of building permits and occupancy permits

Supervise actual layout of foundations and construction up to completion

of the project; etc.

Computer software application using STAAD-III version 20, SAND, etc.

Design, steel fabrication and Installation works

WORK ACCOMPLISHMENT :

Two (2) Storey Commercial Building, Municipality of Alubijid, Misamis Oriental; Construction of Facilities of Smugglers Beach Club Resort,

Calangahan, Lugait, Misamis Oriental

Two (2) Storey Commercial Building, Municipality of Laguindingan, Misamis Oriental

Two (2) Storey Residential Building, Brgy. Tubod, Iligan City

Detachable Tent, kiddies Park Playground at Iligan Port Area, Iligan City

Ostrea Mineral Laboratories, Inc. at Pride Rock,Gusa, Cagayan de Oro City

Three (3) Storey & Two (2) Storey Comm’l Bldg.,Tambacan & Sta. Felomina

Iligan City respectively; Two(2) Storey Res. Bldg.,Luinab, Iligan City

OCTOBER 2009 – JANUARY 2010 : SITE ACQUISITION AGENT

MCS Construction & Development Corporation

Unit 1404 Galleria Cororate Ctr., Edsa corner

Ortigas Avenue, Quezon City 1100

Tel. No. (02) 633-6036/ 637-5425

Brief Description of Job Performance:

Site Survey

Site Acquisition

Civil Works

Documentation

Quality Assurance

Follow-up Contracts Status and Signing between Globe and Owner and Handling Over to Clients

Ensure proper coordination with each Discipline and other related works

Always consider and Monitor the given time plan and Project cost.

WORK ACCOMPLISHMENT :

Cellsite Towers in various barangay located at Iligan City and Lanao del Norte

Cellsite Towers in various barangay located at Marawi City and Lanao del Sur

FEBRUARY 2009 – OCTOBER 2009 : PROJECT ENGINEER

Madelicious Bakeshop

Camague, Tubod, Iligan City

Brief Description of Job Performance:

Civil / Structural engineering design calculation of structures, foundation

Preparation of project bill of materials and cost estimate

Prepare detailed drawings, technical specifications, pipe supports, checking and marking-up of construction drawings sorting-out of field technical problems and gather data in actual field survey

Application and process of building permits and occupancy permits

Supervise actual layout of foundations and construction up to completion

of the project; etc.

Computer software application using STAAD-III version 20, SAND, etc.

WORK ACCOMPLISHMENT :

Renovation/Retro-Fitting of Existing Seven (7) Storey Commercial Building located at Brgy. Poblacion, Colon St., Cebu City

FEBRUARY 2008 – NOVEMBER 2008 : SITE ACQUISITION AGENT

JCCI

Manila

Brief Description of Job Performance:

Site Survey

Site Acquisition

Civil Works

Documentation

Quality Assurance

Follow-up Contracts Status and Signing between Globe and Owner and Handling Over to Clients

Ensure proper coordination with each Discipline and other related works

Always consider and Monitor the given time plan and Project cost.

WORK ACCOMPLISHMENT :

Cellsite Towers in various barangay located at Misamis Occidental and Zamboanga City

MARCH 2006 – MARCH 2007 : MANAGER

CCDE ServTech

Const’n. Consult’ng Design Eng’g. Services

and Technology

2nd Floor ALFMAR building;

Don Pedro Celdran St., Tubod,

Iligan City, Philippines

Tel. No. (063-***-****

Brief Description of Job Performance:

Civil / Structural engineering design calculation of structures, foundation

Preparation of project bill of materials and cost estimate

Prepare detailed drawings, technical specifications, pipe supports, checking and marking-up of construction drawings sorting-out of field technical problems and gather data in actual field survey

Application and process of building permits and occupancy permits

Supervise actual layout of foundations and construction up to completion

of the project; etc.

Computer software application using STAAD-III version 20, SAND, etc.

Design, steel fabrication and Installation works

WORK ACCOMPLISHMENT :

Renovation of existing two(2) storey commercial building formerly owned by ManilaBank located along Quezon Avenue corner Roxas St., Iligan City

Renovation of existing three(3) storey commercial building owned and administered by Mr. Emmanuel Lucio A. Maramar located at Don Pedro St., Barangay Tubod, Iligan City

Renovation of existing residential building owned by Dr. Jose Cui, Barangay Tipanoy, Iligan City

Steel Fabrication and installation in various residential building, Iligan City

SEPTEMBER 2004 – MARCH 2006 : SITE ACQUISITION AGENT

Wireless Technology Solutions, Inc.

2nd Floor ITC building;

Sen. Gil Puyat Avenue (formerly Buendia)

Makati City, Philippines

Tel. No. (02) 890-4239

FEBRUARY 2004 – SEPT. 2004 : SITE ACQUISITION OFFICER

Alan Dick Philippines Corporation

21st Floor Raffles Corporate Center

Emerald Avenue, Ortigas Center

Pasig City, Philippines

Tel. No. (02) 914-0300/0301

FEBRUARY 2003 – FEBRUARY 2004 : SITE ACQUISITION & CW SUPERVISOR

BOT Broadband Phils., Inc.

Unit 436 Chateau Verde Condominium

Valle Verde 1, E. Rodriguez Jr. Ave.,Brgy. Ugong

Pasig City, Philippines

Tel. No. (02) 671-2394

BOT Broadband Phils., Inc.

Unit 603 Raffles Corporate Center

Emerald Avenue, Ortigas Center, Pasig City

Tel. No. (02) 915-1142

APRIL 2002 – DECEMBER 2002 : SITE ACQUISITION SUPERVISOR

Ericsson Telecommunications, Inc.

7th Floor Octagon Building

San Miguel Avenue, Ortigas Center

Pasig City, Philippines

Tel. No. (02) 637- 1600

FEBRUARY 2002 – MARCH 2002 : SITE ACQUISITION SUPERVISOR

Leighton Contractors (Philippines) Inc.

9th Flr. Insular Life Building

6781 Ayala Avenue

Makati City 1226

Philippines

Tel. No. (02) 841-0998

Facsmile No. (02) 811-0158

E-mail ac369n@r.postjobfree.com

APRIL 2000 – JANUARY 2002 : PROJECT ENGINEER /

SITE ACQUISITION COORDINATOR

Keppel Communications Philippines, Inc.

7th Floor Equitable Tower

Paseo de Roxas

Makati City, Philippines

Tel. No. (02) 886-0880

Brief Description of Job Performance:

Site Survey

Site Acquisition

Civil Works

Documentation

Quality Assurance

Follow-up Contracts Status and Signing between Globe and Owner and Handling Over to Clients

Ensure proper coordination with each Discipline and other related works

Always consider and Monitor the given time plan and Project cost.

WORK ACCOMPLISHMENT : (DEPARTMENT: CIVIL WORKS)

GLOBE GSM NETWORK EXPANSION PROJECT (PHASE 8/VIKING 4)

1.Site Names / Location: (New BTS)

CDO – 8/ Barangay Kauswagan, CDOC

CDO – 9/ Brgy. 22 Poblacion, CDOC

CDO –10/ Brgy. Camaman-an, CDOC

CDO –11/ Brgy. Gusa, CDOC

CDO –12/ Brgy. Tablon. CDOC

CDO –13/ Brgy. Carmen, CDOC

CDO –14/ Brgy. Poblacion, Opol, Mis. Oriental

CDO –15/ Brgy. Bugo, CDOC

Tagoloan/ Brgy. Poblacion, Misamis. Oriental

Jasaan/ Brgy. Poblacion, Misamis Oriental

Balingasag/ Brgy. Poblacion,Misamis Oriental

Salay/ Brgy. Poblacion, Misamis, Oriental

Sipaca, Talisayan/ Brgy. Poblacion, Mis. Or.

Tangub City/ Brgy. Poblacion,Mis. Occidental

Maramag, Don Carlos/ Brgy. Poblacion, Bukidnon

GLOBE GSM NETWORK EXPANSION PROJECT (PHASE 7/VIKING3)

1.Site Names / Location: (New Relay or BTS, Change-out)

Malasag/ Brgy. Tamboboan, Claveria, Mis. Or.

Claveria/ Brgy. Guihean, Impasug-ong, Bukidnon

Dalwangan/ Brgy. Capitan Juan, Lantapan, Bukidnon

Camiguin/ Brgy. San Roque, Mahinog, Camiguin

Oroquieta/ Brgy. Taboc Norte, Oroquieta City

Dapitan/ Dapitan City

Magsaysay/, Magsaysay, Misamis Oriental

Lopez Jaena/, Lopez Jaena, Misamis Occidental

Pagadian/, Pagadian City

Marawi/ Camp Ranao, Marawi City

APRIL 1998 – APRIL 2000 : SITE ACQUISITION SUPERVISOR

Ericsson Telecommunications, Inc.

7th Floor Octagon Building

San Miguel Avenue, Ortigas Center

Pasig City, Philippines

Tel. No. (02) 637- 1600

Brief Description of Job Performance:

Site Survey

Site Acquisition

Civil Works

Documentation

Quality Assurance

Follow-up Contracts Status and Signing between Globe and Owner and Handling Over to Clients

Ensure proper coordination with each Discipline and other related works

Always consider and Monitor the given time plan and Project cost

WORK ACCOMPLISHMENT : (DEPARTMENT: CIVIL WORKS)

GLOBE GSM NETWORK EXPANSION PROJECT (PHASE 6)

1.Site Names / Location: (New BTS)

Sta. Felomina/ Brgy. Sta. Felomina, Iligan City

Punta Silum/Brgy. Punta Silum, Manticao, Misamis Oriental

Pagahan/ Brgy. Pagahan, Initao, Misamis Oriental

Burnay/ Brgy. Burnay, Initao, Misamis Oriental

Gitagum, Misamis Oriental

El Salvador, Misamis Oriental

Gingoog/ Brgy. Poblacion, Misamis Oriental

Surigao/ Brgy. Washington, Surigao City

Prosperidad/ Brgy. Poblacion, Prosperidad, Agusan del Sur

Tandag/ Brgy. Poblacion, Tandag City

JANUARY 1997 – APRIL 1998 : SUPERVISING CIVIL ENGINEER

Everose Marketing Corporation

Padilla Building, Del Pilar Street

Iligan City 9200, Philippines

Tel. No. (063-***-****/6626

Brief Description of Job Performance:

Engineering design

Site Survey

Preparation of Detailed Drawings, Application for Building Permit, Sanitary/ Plumbing Permit, Electrical Permit

Construction Supervision

Construction Variations

Application for Certificate of Occupancy, Certificate of Completion, Certificate of Electrical Completion and Acceptance

WORK ACCOMPLISHMENT : (DEPARTMENT: CIVIL WORKS)

CONSTRUCTION OF THREE (3) STOREY COMMERCIAL BUILDING –

@ Iligan City

JUNE 1995 – SEPTEMBER 1996 : ENGINEER I – CIVIL / STRUCTURAL

Consulting & Design Engineering (CDE)

P.O. Box 2502, Al-Khobar 31952, KSA

Tel. No. (03) 895-2844

Brief Description of Job Performance:

Civil / Structural engineering design calculation of structures, foundation

Prepare detailed drawings, technical specifications, pipe supports, checking and marking-up of construction drawings sorting-out of field technical problems and gather data in actual field survey

Computer software application using STAAD-III version 20, SAND, etc.

WORK ACCOMPLISHMENT :

SAUDI ARABIAN INTERNATIONAL SCHOOL –

Dhahran Academy Gymnasium, Cafetorium, Nursery Building, Pump

House/ Utility Building, Telecommunication/ Reverse Osmosis Building

and Tower House.

SAUDI ARABIA JAPANESE PHARMACEUTICAL CO., LTD. –

Guard House, Main Administration Building and Boundary Wall Fence.

JUNE 1992 – JUNE 1995 : ENGINEER II – CIVIL / STRUCTURAL

Consulting & Design Engineering (CDE)

P.O. Box 2502, Al-Khobar 31952

Kingdom of Saudi Arabia

Tel. No. (03) 895-2844

Brief Description of Job Performance:

Civil/Structural engineering design calculation of structures, foundation

Prepare detailed drawings, technical specifications, pipe supports, checking and marking-up of construction drawings, sorting-out of field technical problems and gather data in actual field survey

Computer software application using STAAD-III version 20, SAND, etc.

WORK ACCOMPLISHMENT :

A/C BACK-UP SYSTEM FOR THE REFINERY LABORATORY AND

SECURITY COMPUTER CENTER –

West Administration Building and Security in Najma Administration Building,

Ras Tanura Area., KSA

JGP 16” O.D. FUEL GAS PIPELINE RELOCATION –

Juaymah Gas Plant.,KSA

LUBE OIL MIST SYSTEMS –

Ras Tanura Refinery., KSA

RAISE BURIED HYDROCARBON PIPELINE OF 14” AND 24” DIAMETER –

Ras Tanura, KSA

UPGRADE SEA ISLAND NO. 4 PRESSURIZATION SYSTEM –

Offshore Berth 19 and 20, Southeast of South Terminal Island in Ras Tanura.

CONCRETE FIREWALL REPLACEMENT (EAST OF TANK 2303) –

North Pier at Ras Tanura., KSA

CONCRETE FIREWALL (PIPE COLUMN NO. 42) –

North Pier at Ras Tanura., KSA

RECOMMISSIONING SUB –

49 Pressurization/CE/C4 Shuttle Line., KSA

GYMNASIUM WITH FUTURE PLATFORM –

Ras Tanura School., KSA

TEMPORARY CONTRACTOR ID BUILDING –

Ras Tanura for Aluminum Company.,KSA

UPGRADE SEWER SYSTEM AT HPB AND POWER PLANT.- KSA

EX- SAMAREC INTEGRATION DRAWINGS – KSA,

Yanbu Refinery, changed SAMAREC Drawings Nos. and Title Blocks to

SAUDI ARAMCO latest Standard Engineering Drawing Title Blocks and Types.

NOVEMBER 1987 – AUGUST 1991 : CIVIL ENGINEER I

National Steel Corporation (NSC)

Camp Overton, Suarez

Iligan City, Philippines

Tel. No. (063-***-****/5431

Brief Description of Job Performance:

Site Survey

Detailed Engineering Design, Construction Drawings And Specifications, Estimates and For Five-Year Expansion Program - II (FYEP-II) projects.

WORK ACCOMPLISHMENT : (DEPARTMENT: CECG, ES, CEG)

Estimate Volume of Foundation for Grade Beams, Main and Intermediate Column, Reinforcing Bars along Line J-106, J-107, J-108 and J-109 respectively.

Design and Detailed Engineering of Lean-to Change corner for Bar Mill Operation Personnel.

Design and Detailed Engineering of Riprap Canal for Access Road from Guest House No. 2 to Security House Gate.

Design and Detailed Engineering of Concrete Floor Slab at Cold Mill Electrical Maintenance.

Computation of Floor Slab Volume of Concrete, Sand, Gravel, Gravel Base and Equipment Foundation for Pasig-BAF.

Design, Investigate and Drafting/ Detailed Engineering of Structural Erection Plans at Foundry Shop Building Expansion.

Design, Detailed Engineering and Drafting of Shot blaster Machine Foundation

at Foundry Shop.

Design, Detailed Engineering and Drafting of Shintokogio Sand Re-claimer Foundation of Foundry Shop.

Design, Detailed Engineering and Drafting of Quality Assurance Laboratory Office at Foundry Shop.

Design, Detailed Engineering of 250 kg. Crucible Furnace Foundation at Foundry Shop.

Design and Drafting of Concrete Floor Slab at Foundry Shop.

Design, Detailed Engineering of Crane Girder Runway for 5T, 3T and Investigate Crane girder Runway with an Additional of 10T from existing 7.5T at Foundry Shop.

Modified, Expand Existing EAF Furnace Foundation Wall at Foundry Shop.

Detailed and Drafting Concrete Floor Slab Reinforcement at 5S-TCM/ Roll Shop.

Design and Detailed Engineering in the Modification of Pipeline at Agus Pump Station and Additional Support Foundation.

Design and Detailed Engineering of Planer Miller Foundation at Maintenance Building.

Design and Detailed Engineering of Security Fences at Foundry Shop.

Design and Detailed Engineering of Shot blast Monorail Extension at Foundry Shop.

Design and Detailed Engineering of Air-conditioning Motor Room Enclosure at Hot Mill Revamp.

Design and Detailed Engineering of Pipe Concrete Encasement at Cathodic Rewiring of R.C. Pier.

Investigation and Evaluation of Lean-to Structural Supports for 5T Monorail Crane at Fabrication Shop.

Investigation and Evaluation of Roof Slab for QA Laboratory Office at Foundry Shop.

Investigation and Evaluation of Normalizing Area at Foundry Shop.

Design and Detailed Engineering of Customs Bonded Warehouse Enclosure at Central Warehouse Remaining Works.

Design and Detailed Engineering, Drafting of Dust Collector Foundation at Foundry Shop.

Temporary Detailed and Assist Staff/ Mechanical, Civil, Electrical Engineers of Hot Mill Revamp Phase-III EPAG Group to Gather Data, Scheduling of Activities And Budget Preparation.

Three (3) Months Inventory of Equipment and Other Materials of Ex-Limay, Ex-PPMCI, Visco Pasig Bataan At NSC Bodega (back of IRD), MES and CAL building (Non-Performing Assets).

Design and Detailed Engineering of Trenches and Drainage System at Foundry Shop.

ITB Documents and Drawings Preparation for:

Construction of 1-Septic Vault and Drainage System at Foundry Shop.

Construction of PKL Building Foundation.

Installation of Fender System at R.C. Pier.

Concrete Jacketing of the Ship breaking Pier.

Billet Bundling.

Retaining Wall and Grouted Riprap at Guesthouse No. 2 – Swimming Pool.

Shoreline Protection Repair Project.

Partial Replacement of 24” dia. Industrial Waterline.

Complete Grouting of Winch-Drive Foundations.

Plant Roads.

Cobble Coiler No.2 at Bar Mill.

Central Warehouse Building Remaining Works.

Clearing of Scrap yard and Ship breaking Pier Seabed.

Complete Construction of SFS Tool/Change Room and Supervisor’s Shop Office.

Hauling of Scraps to Designated Areas.

Feeder Lines/Cathodic Rewiring R.C. Pier.

Installation of Fender System at R.C. Pier.

Plant Wide Aircon Servicing.

Road (Avenue – A) Widening.

Partial Demolition/ Dismantling and Upgrading of Machine Shop.

Foundry Shop Building Height Extension.

Plant Wide Landscaping Works.

Neutralizing Bed Backfilling.

Complete Derusting/Painting of HM/Slabyard and HM/Soaking Pit Building Structural Members.

Roadway Lighting Phase II/BSP Scrapyard Power and Lighting.

Complete Derusting/Painting of Smokestacks/Fumestacks.

Construction of Equipment Foundation for BAF- Upender.

Construction of Office Work Place for the Instrumentation, Refrigeration and Airconditioning Shop.

Demolition/Upgrading of Foundry Shop Mess Hall, Locker Room, Comfort Room and Shower Room.

Design and Detailed Engineering which Includes Concreting, Drainage, Foundation, yard preparation And Ground Backfilling of Wash Rack MES.

Design and Detailed Engineering of Window Counters (2- Units at Issuing Area and 1-Unit at Receiving Area) Located at Central Warehouse.

Design and Detailed Engineering of Roof Lubeyard Extension at Former Melt Shop Scrapyard for Storage of Petrogreases, Furan Resin and Other M & S in drums that are placed Indoor.

Design, Detailed Engineering and Drafting of 9-bays @ 15.00 m. Length x 28.00 m. Wide Steel Structural Cold Mill Building for High Current Density (HCD)/ Electrolytic Cleaning Line (ECL) Project.

Investigation of Existing Design, Detailed Engineering and Drafting of Cold Mill Building having additional Loads of Transfer Tower carried by the Monitor Roof Building for 4-bays Expansion @ 15.00 m. Length x 28.00 m. Wide Steel Structural for Continuous Annealing Lina (CAL).

Design, Detailed Engineering and Drafting of 9-bays (8-bays @ 15.00 m Length x a28.00 m. Wide and 1-bay @ 15.00 m. Length x 25.00 m. Wide) for

Continuous Annealing Line (CAL) and South-West Squaring Off of Cold Mill Building.

Detailed and Drafting of Rail Track of 35T Luffing Crane for Marginal Wharf Project.

Design, Detailed and Drafting of Avenue “B” Access Road Improvement to Marginal Wharf Starting Point.

Detailed Engineering and Drafting of Miscellaneous Steel Structures for HCD-ECL Equipment Line such as Steel Beams, Girders, Columns, Knee and Cross Braces, Supports, Platform Arrangement, Stairs, handrails and Electrical Cover Plates at Cold Mill Building.

Drafting of Excavation Plans for HCD-ECL Equipment Line Project of Cold Mill Building.

Guy Wires Anchorage for Fumestack of Cold Mill Bldg.

Prepare and Update As-Built Drawings for South-East Squaring-Off, West-End Squaring-Off, HCD-ECL and CAL Building Structural.

OCTOBER 1984 – NOVEMBER 1987: ENGINEERING ASSISTANT

National Steel Corporation (NSC)

Camp Overton, Suarez

Iligan City, Philippines

Tel. No. (063-***-****/5431

Brief Description of Job Performance:

Site Survey

Detailed Engineering Design, Construction Drawings And Specifications, Estimates and For Five-Year Expansion Program - II (FYEP-II) projects.

WORK ACCOMPLISHMENT : (DEPARTMENT: SPECIAL PROJECT GROUP)

Conduct, Coordinate with Staff/Civil Engineers during Monitoring, Audit and Inspection of Civil Works at 5S-TCM Diaphragm Walls, Columns, Pile Cap Foundation and Post-Tensioning of Diaphragm Wall Foundation.

Conduct Audit and Inspection of Civil Works at Various Several Projects such as 5S-TCM Foundations, Structural Erection, Roadways Concreting, Load Center and Dust Collector Foundation at Billet Shop Plant, Steel Piling at Hot Mill, R.C. Pier at Shipbreaking Pier.

FEBRUARY 1984 – AUGUST 1984 : SENIOR PROJECT INSPECTOR

Iligan City Waterworks System (ICWS) Old Market, Pala-o

Iligan City, Philippines

Tel. No. (063-***-****/7703

(063-***-****/4810

Brief Description of Job Performance:

Site Survey

Engineering Design, Bill of Materials, Cost Estimates and Supervision during Implementation of the projects.

WORK ACCOMPLISHMENT : (DEPARTMENT: CIVIL WORKS)

POTABLE WATER PIPELINES INSTALLATION –

In Various Barangay of Iligan City, Lanao del Norte.

E. SEMINARS AND TRAINING ACQUIRED:

NOVEMBER 22 – 23, 1990 : EDP CONCEPTS WITH PC USER’S GUIDE TO

OPERATIONS – 50TH SESSION

National Steel Corporation, Iligan City, Philippines Conducted by Mr. Chuser C. Serina

SEPTEMBER 18, 1990 : GANTREX RAIL FASTENING

National Steel Corporation, Iligan City, Philippines Conducted by Gantrex Asea Ltd.

NOVEMBER 17 – 26, 1990 : STRUCTURAL DESIGN OF REINFORCED

CONCRETE (Module V) IN-HOUSE COURSE ON

STRUCTURAL DESIGN TRAINING PROGRAM

National Steel Corporation, Iligan City, Philippines Conducted by UP - NEC

OCTOBER 14 – 15, 1989 : VALUE ENGINEERING, ESTIMATING AND

BIDDING (Module IV) IN-HOUSE COURSE ON

STRUCTURAL DESIGN TRAINING PROGRAM

National Steel Corporation, Iligan City, Philippines Conducted by UP - NEC

SEPTEMBER 19 – 23, 1989 : STRUCTURAL STEEL DESIGN (Module III)

1986 NATIONAL STRUCTURAL CODE,

IN-HOUSE COURSE ON STRUCTURAL DESIGN

TRAINING PROGRAM

National Steel Corporation, Iligan City, Philippines Conducted by UP – NEC

SEPTEMBER 08 – 10, 1989 : SHORT COURSE ON SOIL STRENGTH AND

AUGUST 25 – 27, 1989 COMPRESIBILITY FOR FOUNDATION DESIGN

AUGUST 19 – 20, 1989 (Module II) IN-HOUSE COURSE ON STRUCTURAL

DESIGN TRAINING PROGRAM

National Steel Corporation, Iligan City, Philippines Conducted by UP - NEC

JULY 11, 1989 : PLANAR FRAME/TRUSS ANALYSIS (Module I)

IN-HOUSE COURSE ON STRUCTURAL DESIGN

TRAINING PROGRAM

National Steel Corporation, Iligan City, Philippines Conducted by UP - NEC

JUNE 24, 1989 : HOUSING AND SUBDIVISION TRENDS AND

DEVELOPMENT

Maria Cristina Hotel Skyroom, Philippines Conducted by PICE-LANAO CHAPTER MID-YEAR

SEMINAR

MAY 06 – 07, 1989 : WORKSHOP ON COMPUTER ANALYSIS OF

APRIL 28 – 29, 1989 STRUCTURES (Module I) IN-HOUSE COURSE

ON STRUCTURAL DESIGN TRAINING PROGRAM

National Steel Corporation, Iligan City, Philippines Conducted by UP - NEC

JUNE 07, 1988 : ADMIXTURES IN CONCRETE

National Steel Corporation, Iligan City, Philippines Conducted by GRACE CONSTRUCTION

PRODUCTS

APRIL 21, 1988 : “EMBECO” GROUTING, “MASTERPLATE”

FLOOR HARDENER AND “POZZOLITH”

ADMIXTURES

National Steel Corporation, Iligan City, Philippines Conducted by UP TOWN INDUSTRIAL

FEBRUARY 17, 1987 : ENGINEERING MICROGRAPHICS TECHNOLOGY

National Steel Corporation, Iligan City, Philippines Conducted by MICRODATA SYSTEMS AND

MANAGEMENT INC.

F. PICE – ILIGAN CHAPTER CONTINUING EDUCATION PROGRAM:

NOV. 27, 2008 – NOV. 29, 2008 : 34TH NATIONAL CONVENTION

“Civil Engineers as Major Contributors to the Built

Environment” Atrium/Grand Caprice Restaurant,

Limketkai Center, Cagayan de Oro City

Philippines

JULY 07 – 11, 1998 : INFRASTRUCTURES FOR SUSTAINABLE

DEVELOPMENT

Central Bank Convention Center, Davao City,

Philippines

APRIL 23 – 25, 1998 : STRENGTHENING INFRASTRUCTURE

DEVELOPMENT THROUGH QUALITY

MANAGEMENT

Maria Cristina Hotel, Iligan City, Philippines

SEPTEMBER 22 – 23, 1990 : TECHNICAL CONFERENCE ON

MICROCOMPUTER APPLICATIONS IN CIVIL

ENGINEERING

Micro computing Current Trends and Application Prospects in Engineering – Lecture I

Computer Aided Design and Drafting (CADD) – Lecture II

Microfea-II (P1 Module) – General Purpose finite elements Computer Package for Structural Analysis – Lecture III

Microcomputer Spreadsheet Applications in Civil Engineering – Lecture 4

Maria Cristina Hotel, Iligan City, Philippines

MARCH 07, 1987 : HYDROELECTRIC PLANT CONSTRUCTION –

Lecture Series III

National Power Corporation Ballroom, Iligan City,

Philippines

FEBRUARY 26, 1987 : CIVIL ENGINEERING ASSOCIATION IN USA,

CONSULTANCY IN ENGINEERING, NSC

PROJECTS, CIVIL ENGINEERS IN GOVERNMENT,

CONSTRUCTION EQUIPMENT LEASING

INDUSTRY – Lecture Series II

National Power Corporation Training Center,

Iligan city, Philippines

FEBRUARY 19, 1987 : NEW CHAPETER BY-LAWS, BENEFITS OF

JOINING A PROFESSIONAL ORGANIZATION

AND CIVIL ENGINEER DECISIONS UNDER

CONDITIONS OF UNCERTAINTY – Lecture

Series I

MSU – IIT, Mini Theater, Iligan City, Philippines

G. CHARACTER REFERENCES:

MR. RAVI NAIR

Project Manager

Keppel Communications Phils., Incorporated

Tel No.: 02-8860880

ENGR. RENE PEREZ

Construction Manager

Keppel Communications Phils., Incorporated

Tel No.: 02-8860880

ENGR. DADIEL F. FAJILAN

Site Acquisition Manager

Ericsson Telecommunications, Incorporated

Tel. No.: 02-6371600

ENGR. TEOFILO LAGMAN

Site Acquisition Supervisor

Ericsson Telecommunications, Incorporated

Tel. No.: 02-6371600

MR. EDILBERTO V. PAZA

President & Chairman of the Board

Everose Marketing Corporation

Tel. No.: 063-*******

MR. AZMI ABDUL HADI

Managing Director

Consulting & Design Engineering

ENGR. MANUEL O. CABILI

Manager

National Steel Corporation

ENGR. EUTIQUIO M. DURIAS

Manager

Iligan City Waterworks System

I hereby certify that the above information is true and correct.

ROBERT JABINES ALFECHE

Applicant



Contact this candidate