Resume

Sign in

Manager Engineer

Location:
Dubai, Dubai, United Arab Emirates
Salary:
35000
Posted:
January 21, 2018

Contact this candidate

Page *

MUKHTAR MUHAMMAD JADOON

(Certified by PMP, (Basic) NRMCA & ISO: 9001:2015 As a Lead Auditor by (IRCA)( QMS) Accredited & Certified Civil Engineer by Dubai Municipality Govt. Of Dubai UAE Accredited, Certified, Facilitator of Green Code and Blue Code and Acknowledge by Civil Engineering Dept. (CED) TRAKHEES, Govt. of Dubai, U.A.E.

00-971-**-*******

ac34od@r.postjobfree.com

Professional Summary

More than (20) Years, Vast Professional Experience as SENIOR QUALITY CONTROL/ QUALITY ASSURANCE MANAGER: Senior QA/QC Manager Vast experience of high rise towers, Buildings and Villas, Town Ships. All kinds of infrastructure work, execution in construction & site management experience in Airport Project, Well aware of International standards, Local Regulation and projects specification.

Practical Experience of conducting Testing of all Construction materials, like Architecture, MEP, Civil work is being using in Construction industries for High Rise Tower, Air Port Project, Sub- station, Mega Malls, Atlantis Dubai, Palm Island Jumeirah and witnessed as Specialist of Materials and QA/QC Materials Manager from Authority Govt. of Dubai.

Air Ports Projects Terminal 03 Dubai, International Airport, Prepared PQP, Method statements & ITP’s for Mega Projects Air ports etc. Earth work, Utilities, Job Mix for asphaltic works. Conducted all testing for Materials In order to ensure a standard Quality of Materials to be used for construction activities.

Core Qualifications

B.Sc In Civil Engineering ( 1995 -96)

(University Of Engineering &Technology N.W.F.P. Pakistan)

(M.Sc. In Geology, Materials Engineering (University Of Peshawar Pakistan 2001

Professional Affiliations

Course : Quality Project Management- PDUS Certification- PMI Course: Certified by ISO: 9001-2015 as a Lead Auditor Quality Management system (QMS)

Course : Innovation In Design and Construction

Course: CERTIFICATION PROGRAME FOR FRESH CONCRETE IN THE FIELD” TRAKHEES- PCFC govt. of Dubai.

Course: facilitator training program for materials, quality control systems and green Code” CED TRAKHEES- PCFC Govt. of Dubai.

Course: International concrete sustainability conference.

Course: concrete strengthening techniques & design consideration

(SPME).

Page 2

Course: Smart dynamic concreter introduction & demonstration

(BASF).

Course: Concrete repair and corrosion solutions (FOSROCK)

Course: Quality control in the use of post tensioning in building structures (CARES).

Course: Concrete Technology Middle East (CTME) NRMCA.

Course: Quality Project Management- SOE UAE. Certification of excellence customer service for TRAKHEES inspectors, quality Control Department. First PCI international symposium certificate of Participation.

EXTRAS CREDENTIALS:

Accredited with blue code (Buildings regulation & design guidelines code) Accredited as a Green Code (Construction of Materials and Quality Control Guide line)

Facilitator as a (GREEN CODE)

Head examiner of Fresh concrete field testing technician & supervising engineers

Attended & well Experience of ESTIDAMA Requirements for Buildings Regulation in ABU DHABI, U.A.E.

Computer Skills

M.S. Word, Excel, Autocad-R-14, Primavera, ii & Geographical Information System – G.I.S.

Experience

M/s: DHABI CONTRACTING L.L.C Dubai

21Nov, 2017 to Till Date

Cost: 1.5 BILLIONS DIRHAMS

Project: AL-KHAIL AVENUE MALL & THE HOTEL, JUMEIRAH VILLAGE TRIANGLE JVT NAKHEEL

ROLES & RESPONSIBILITIES: Working as a Senior QA/QC, Materials Manager In order to prepare a P.Q.P, M.S & Inspection Test Plan & Project Quality plan in the line of direction for all Local Govt. Authorities In order to Take N.O.C’s, Permission with in accordance to Project specification & Working within the Line of Project Contract Requirements, Local Regulations Implementation In order to work in Safe way and avoid any Non- compliance/ Deviation to Project Specification & International Standards requirements.

Liaison with, RTA, DEWA, ETISALT, DU, DUBAI Municipality, Empower, NAKHEEL, TRAKHEES, Civil Engineering Division Ports, Customs EHS & Dubai Civil defense Dubai etc. Conduction of a weekly Quality Control meeting, progress meeting & implemented PQP at site during construction execution activities also conduction Internal Auditing & External Auditing in the line of ISO: 9001: 2015 QMS Requirements.

Page 3

M/S. GHANTOOT Group Building Division Abu Dhabi, U.A.E. 12th, Sep, 2015 to till date:

AL- JAZEERA High Rise Tower, 3 BASEMENT+G.F+ M+ 33 Typical Floors Tower Corniche, Abu Dhabi.

Cost: 170 Million Dirhams

Residential High Rise Tower 3 Basements ( Parking levels) Ground floor ( ENTRANCE + RETAIL+SERVICES) 4 PODIUM (PARKING LEVELS) 1 OFFICES FLOOR, 21 FLOORS ( RESIDENTIAL) 1 FLOOR TENANT FACILITIES, Corniche Abu Dhabi.

Cost: 243 Million Dirhams

Sr.QA/QC Manager Being as a QA/QC Manager Preparing (PQP) NCR’S, S.O.R’S, NCR’S Closeout procedures, Conducting weekly QA/QC Meeting In order to review and discussed the Latest status of Materials Submittals, ITP’S, Method statements, Inspection Request IR, Technical Issues and further to practically implemented of approved PQP, Preparation of All activity standards formats, Witnessing of Trials, Mock up, Testing of Materials. Moreover, Conducting Internal Audit, External Audit for Sub- contractors etc. Specially Façade work for AL- JAZEERA Tower FIVE STAR DESERT RETREAT HOTEL & RESORTS- ALWATHBA ABU DHABI, H.H SHEIKH BIN ZAYED E.O.M

Cost: 200 Million Dirhams

Main Hotel, Conference Facility, Prayers Room, Utilities, One, Two, Three Bed rooms Villas, Kids Clubs, Zone 1: ANCILLARY BUILDINGS YOGA PAVILION, DESERT CAMP, SUBSTATION 1 &2 SEWERAGE TREATMENT PLANT, SWIMIMG POOLS, WATER FEATURES, HARD & SOFT LANDSCAPING & STAFF’S ACCOMODATION ETC

DATE OF TRANSFERRED FROM SUPREME COUNCIL, INTERNATIONAL SECURITIES PRESENDENTIAL AFFAIRS ABU DHABI ON 25-05-2016 to Till date In order to take CAR/PA for NCR’S etc.

M/s: UNECUNEC- ACTCO/ JV at NAKHEEL Mall The Palm Island Jumeirah Dubai

2Oth, Sep, 2014 to 11th, Sep, 2015

U.A.E.

Cost: 1.2 US $ Billions Dollor

Being as a Senior Quality Assurance & Quality control Manager Preparing of Project Quality plan (PQP), Project Quality Policy statement, Method statements for particular activities, ITP, Inspection and test plan in accordance to Project specification, ISO- 9001- 2008 and International standards. Approval and reviewing of materials submittals, Manufacturers Pre- qualification and their products for use of NAKHEEL MALL. ARABTEC – SAN JOSE, Joint Venture( JV) at AL AIN HOSPITAL PROJECT: U.A.E.

Page 4

(30th, July, 2013 to 19th, Sep, 2014 )

Cost: 4. 3 Billion Dirhams

POSITION: QA/QC MATERIALS MANAGER

PROJECTS:

ASTANA ABU DHABI PLAZA KAZAKHSTAN, Three towers including Five star Hotel. PROJECT: 5 Billion U.A.E Dirham, (2.5 Billion U.S. Dollar).

ALAIN HOSPITAL PROJECT: Working as Quality control/ Quality Assurance Materials Manager: 4.3 Billion Dirhams 750 beds Hospitals, Utility center, Tunneling In order to Implemented the QA/QC Plan procedures for Alain Hospital Project Conducting and approving Materials Submission in accordance to Project specification and Quality Auditing is conducting on daily basis In order to Implemented at site Execution activities. Also conduction Weekly Progress meeting of Quality control Engineers In order to discuss, SOR, NCRS and how to rectify the Site Observations In order to close the NCRS ON TOP PRIORITY BASIS. Weekly Progress and technical meeting conducting with Client on weekly basis. Further, In order to ensure that all execution work, is going with approved Materials. Site Issues Technically supporting Alain Hospital Project& further, Reviewing and approving all Materials Submission, Approval of All Specified Materials, Concrete Mix designs Laboratory trials and Plant trials in accordance to project specification, International Standards and Local Regulations in Order to achieve a standards Quality of Work at Site.

DUBAI and ABU DHABI PROJECTS:

RESPONSIBILITIES: To approve a standard Quality of Materials as accordance to project specification, International standard as well as Local Authority requirements for our projects. Reviewing and approving all Materials Submission, Approval of All Specified Materials and Monitoring of Quality Work.

CIVIL ENGINEERING DIVISION TRAKHEES, PORTS, CUSTOMS & FREE ZONE CORPORATION, Department of Planning & Development GOVT. OF DUBAI, U.A.E.

(22nd, April, 2006 to 29th, July, 2013)

POSITION: SENIOR QA/QC, MATERIALS ENGINEER

PROJECTS:

Inspected and monitored more than 200 projects for the quality assurance and quality of work in light of Project specifications, International standards and local regulations.

Some of these projects are:

Palm Jumeirah Island Dubai World, The Eighth wonder of the World! Crescent, Trunk Crown Infrastructures and buildings in the sea, Marine Projects. Sea for Utilities. (JUMEIRAH LAKE TOWERS) Total 79, Seventy Nine High Rises Commercial & Residential Towers International City, Jumeirah Park Villas, Water Front project Palm Jabel-e-Ali Palm Deira Page 5

Dubai, Techno Park, JAFZA SOUTH, and JAFZA NORTH. Jumeirah Village Circle, Jumeirah village south and north, the maritime city Bur Dubai. JOB DESCRIPTION & RESPONSIBILITIES AS AUTHORITY- CED- TRAKHEES, PORTS CUSTOMS & FREE ZONE CORPORATION DUBAI

a. Introduction: “Quality is not merely an end; it has become a way of Life” The need for and use of a Quality Control function cannot be overemphasized. Quality cannot be tested nor inspected into a product, it must be built in. use approve all the materials submittal technically as per the Project Specification, General Notes, Contract Design Drawings & General Code Of Practice. b. SCOPE OF WORK: The QCS Scope of work covers all materials related to construction industry in the Civil and MEP Services sectors such as concrete and its constituents, masonry blocks, Steel reinforcement, pumps, heat exchangers, fresh air handling units, sanitary wares, ducts, Asphalts, Sub grades, sub base, bridges, culverts and piping workmate.. Inspections are conducted at random in order to ensure that quality control requirements are fulfilled at all times. The requirements of the QCS are mainly those of International Standards (BS EN, ACI, ASTM, AASHTO, NFPA, ASHRAE, SMACNA and Local

Regulations. Also accredited as Green code Guide lines for materials construction as Preliminary role to ensure that the site project work is constructed & controlled in accordance with the Contract Documents, Specifications, Cost Budget, Delivery Targets

& Quality Standards set by Client requirement.

c. Being as a Quality control senior Engineer well aware of registration processes of Ready Mixed Concrete Plants supplying concrete to different mega projects .management & ensure the implementation of Approved Clause – 14 programs which is approved by the Client & Project Management team. Prepare a monthly or weekly report in coordination with the Planning Engineers & submit to the Project Manager.

d. Being as Senior Quality Control, Materials Engineer also certified for site laboratories Certification of concrete field testing technicians and Certification of Ready mixed concrete Suppliers to implement for site activities Witnesses, the concrete trial mixes for the approval of the Design mix concrete & ensuring its full compliance with the Project Specifications &Authority Requirement.

e. Reviewing & analyze the variation orders as per actual Contract Design Drawing / revised Design Drawings & provide the necessary fee back for final cost impact on the project. f. Value Engineering– Study the cost saving factor to its depth, raise the matter via letter & forward the Cost Saving to the Client officially.

g. Having good experience of fast track high rise tower projects by providing a comprehensive service to the Company & to the Client.

Page 6

h. Implement QA / QC procedures & Inspection Test Plan as per the approved materials, track their testing frequencies, check all the cube results, durability parameters & check the approved material test results as per technical data sheet & their related parameters.

i. Perform random checks to site with the field team to ensure the works are in accordance with the Project Specification, General Notes, Design Contract / Authorities Approved Drawings. j. Attending the Project Progress, Coordination meetings & organize Sub-contractor’s meetings to close out the site issues on daily or weekly basis.

k. Organize weekly internal meeting between the site staff to discuss the routine site works & find solution for the critical activities & their related site works accordingly. l. Reviewing & comment the shop drawings in close coordination with the Project Architect, MEP department & instruct the contractor to generate extra details as and when required as per the site conditions

m. Review the sub-contractors pre-qualifications based on approved vender list or from out of the list for all the Structural & Architectural materials.

n. Thoroughly check all the details of Structural & Architectural drawings in order to resolve all the discrepancies between Tender

/ Contract / Good for Construction / Authorities Approved drawings.

o. Generating a Non -Conformance Notice & to make contractor work in compliance with the Specifications, General Notes & Approved Drawings.

p. Prime Cost items-generate enquiries, collect the rate from minimum three different suppliers, compare / complete the rate analysis & acknowledge the final proposal. Arrange weekly meetings with Project Manager, Chief Architect & Client to seek their final approval for all the materials.

q. Perform random safety checks with the site team to check site safety practice as per DM / JAFZA/ EHS Authorities rules & regulations.

r. Committed to work with multi discipline team with strong knowledge of construction methods in the region.

s. Work parallel & follow up with the Project Manager’s expectations.

t. Proactive in problem solving, ambitious & leadership skills with decision making approach towards the benefit of the project. ASSOCIATED CONSULTING INTERNATIONAL CONSULTANTS

DUBAI, U.A.E.

(October, 2004 to April, 2006)

POSITION : Worked as a Senior Quality Control Materials Engineer PROJECT :

Page 7

The Palm Jumeirah Island crescent- Infra structures- Roads, Bridges, District Cooling System, Sewerage System, Irrigation system, Decorative Walls, GRC, Steel bridges on River.

PROJECT COST: 3 Billion Dirham.

M/S: BAUER GMBH, GERMANY PILING CO.DUBAI. UAE

(December, 2003 to October, 2004)

POITION : Sr. QA/QC Engineer

PROJECT: Airport Terminal Three 03 Dubai International Airport Terminal 3 Executed Piles works, Shoring Works etc.

Mall of the Emirates Dubai.-Dubai.

Executed piles and testing on piles.

RAKAN TRADING AND CONTRACTING COMPANY K.S.A

(November, 2002 to November, 2003)

POITION : Senior Materials Quality Control Engineer LRA, LOYA, REPUBLIC ENGINEERING AND ASSOCIATED CONSULTING ENGINEERS PAKISTAN.

( January, 2002 to Nov, 2002)

POSITION: QA/QC, Materials Engineer for Civil Structures and buildings.

BAYINDER CONSTRUCTION COMPANY TURKEY PAKISTAN.

( January, 2000 to December, 2002 )

POSITION: Materials, Quality Control Engineer

PROJECTS: Buildings, Structures, High ways.

M/S: S.T.F.A TURKISH CONTRACTING COMPANY PAKISTAN

( January, 1998 to December, 2000)

POSITION: Quality Control, Quality Assurance Materials Engineer PROJECTS: Roads, bridges and Infrastructures

M/S: ABID BROTHER CONTRACTORS PVT LTD.

( January 1996 to December, 1998).

POSITION: QA/ QC, Materials Engineer

PROJECTS: Different Buildings of G+6.

Page 8

Additional Information

Date Of Birth:

Passport No.:

Languages Known:

Driving License :

01-02-1966.

AA 8404333

English, Arabic, Urdu, & Pashto

UAE



Contact this candidate