Timothy R. Gamble
Georgetown, PA US
Phone: 1-724-***-****
*******.*.******@*****.***
COMPETENCIES
Experience with Lean Manufacturing, Six Sigma Yellow Belt, ISO9001-2015, AS9100, ISO/TS16949:1999, Quality System Compliance and Auditing, Employee Training, Customer Relations, Stationary Engineer’s License, Minitab 15, QC Calc, SPC Office Buddy, Microsoft Office, AutoCAD 2008, HVAC Certified, Print Reading, Powerpoint, Excel, Accounting, Business Management. Currently taking a six sigma black belt certification course.
EMPLOYMENT HISTORY
Plant Manager
Miller Plastics Inc.
April 2017 – July 2017
• Responsible for all manufacturing plant activities
• Scheduling, purchasing, customer relations, continuous imprement etc... Quality Engineer
Penn Transformer, Cannonsburg, Pa
December 2016 March 2017
• Contract Position
• Quality Engineer Implementing ISO 9001-2015
• Mechanical and Electrical Print Reading
• Internal Auditor
• Process Improvements Tracking Main Product Line
• Document Control (All Departments)
• Member of the Continuous Improvement Team
• Quality Trainer (300 Employees)
• Union Environment
• Employee Competency and Evaluations Controller
Quality Manager
Mosebach Manufacturing, Pittsburgh, Pa
September, 2007 August, 2016
QC Manager 75 employees (9 years)
Manage Mosebach Manufacturing’s Continuous Improvement Program
Manage Mosebach Manufacturing’s Test and Service Program
Direct and analyze Gage R&R and Process Capability studies to improve processes
Conduct monthly Production Review meetings to drive and measure improvement
Develop and maintain Mosebach Manufacturing’s Quality Management System
Direct and manage quality programs and efforts to ensure compliance with customer requirements, internal quality programs following ISO 9001 and AS9100 guidelines
Write, revise, and maintain all quality documents that define how the products will be manufactured to comply with customer quality requirements, internal quality programs, and ISO 9001
Investigate and resolve customer quality complaints
Review quality reports and develop programs and activities to improve quality
Perform internal quality audits
Develop and conduct quality related training
Quality process control for continuous improvement
Statistical Process Control (SPC)
Lean manufacturing
Implement Total Quality Management (TQM) Processes
25% Travel
Review blueprints and schematics
Manage Union employees
Field sales, trade shows and commissioning
Microsoft Word, Excel training
Maintenance Supervisor
Congregate Management Services, Pittsburgh, Pa
May, 2005 September, 2007 (2 years 4 months)
Maintenance Supervisor of a 59 unit retirement building, a 40 unit section 8 apartment complex in and a 98 unit retirement building
Scheduled and sometimes helped perform all preventative maintenance and maintenance repairs
On-call every other week
Extensive experience with carpentry, plumbing, electrical, landscaping, carpet cleaning, turn-overs, painting, phone and cable repair, appliance repair, HVAC and much more
Scheduled contractors and calculated budget for current and future expenditures Maintenance Manager
Marian Manor Corporation, Pittsburgh, Pa
February, 2004 May, 2005 (1 year 3 months)
Maintenance Supervisor at a 200+ bed nursing home
Scheduled and helped perform repairs on plumbing, electrical, painting, carpentry, landscaping, general repairs, generators, furnaces, boilers and various other tasks Quality Control Supervisor
Accuglass
June, 2000 December, 2003 (3 years 6 months)
Oversaw all plant quality functions, (ISO 9001/QS 9000)
Implement continuous improvement through capability studies, process audits, lean tools • Improved tooling design for glass tempered operation that saves over $75,000 per year
Improved a hot-forming process that reduced scrap from 2% to less than 0.5% and increased productivity by 25% saving over $35,000 a year
Designed new tooling
Ensure adequate resources are available to employees allowing performance to meet or exceed expectations
Assure all aspects of AAR Quality Standard M-1003 are implemented and maintained
Develop, maintain, and implement Quality Assurance manuals, procedures, inspection forms, and Control Plans
Direct monthly management review meetings
Conduct Quality Assurance, Safety, and Production training for all employees (approx. 50)
Schedule and perform internal quality audits and supplier quality audits
Resolve customer complaints and supplier issues
Implement corrective and preventative actions
Gauge design and calibrations
Statistical Process Control (SPC’s)
Implement Total Quality Management Program(TQM) processes
First-in piece reports
Program CMM and CNC machines
Oversaw shipping department
Production Manager on most critical product line and helped maintenance when needed
Maintenance Supervisor vacation fill in
Quality Assurance Supervisor
Advanced Alloy Division
October, 1999 June, 2000 (8 months)
• Supervised two production lines
• Collected and analyzed process data to make necessary adjustments in order to maintain controlled conditions and performed testing per ASTM, AS9100 and ISO/TS16949:1999 specifications
• Safety committee team member
• Audit daily inspections on all suspect and PPAP parts for plastic mold injection plant
• Quality process control for continuous improvement
• Statistical Process Control (SPC’s)
• Implement TQM processes
• Responded to all customer complaints (CAR"s),in ISO9001/QS9000 and 8D format and investigated the problems
• Inventory control of stock based on customer complaints and daily activity
• Processed PPAP's, FMEA's, SPC's and initial inspection reports for future and current part orders
• Types of tools used were micrometers, calipers, micro-vu, word, excel, super browser and common sense
• All work was done on plastic injected molded parts Quality Lab Supervisor
Newell Specialty Chemicals
December, 1993 September, 1999 (5 years 9 months)
Lab Manager / Purchasing Manager / Maintenance 40 employees (5 years 9 months)
Technical Supervisor to 9 fellow employees
Customer service needs on a routine basis pertaining to quality issues
Prepared waste water samples for waste management program
Quality Process Control for Continuous Improvement
Ran analysis on various product samples
Some equipment used was titrimeters, vacuum ovens, viscometers, gas chromatographs, atomic analyzer and more
Set up and performed reaction chemistry runs for future plant products
Other duties included maintenance on lab equipment and plant equipment such as hot plates, titraters, boiler switches, mechanical seals, valves, motors, minor HVAC and more
Operated forklifts, reactors (75 – 3500gal.)
Purchased raw materials
Entered all accounting records and balances into the computer system using Real World Accounting software (all prior records were erased)
Manager
Residential Maintenance
April, 1992 Present (20 + years)
Do odd jobs for numerous clients as time permits
Some jobs were building decks, roofing work, plumbing, running electric lines, installing showers, drywall, minor HVAC, painting and much more
Night Auditor & Supervisor
Mountaineer Racetrack and Resort
September, 1990 December, 1993 (3 years 3 months)
Audited all account receivables from the resort on a nightly basis
Targeted problem areas and dealt with as needed
Responsible for training front desk personnel, cashiers and other audits
Responsible for night supervision, check-ins and cash advances Electrician
Weirton Steel Corporation
May, 1988 September, 1990 (2 years 4 months)
Millwright / Electricians Helper
Performed daily tasks such as preventative maintenance and repairs
Completed online breakdown repairs on cranes, conveyors and lifts
Worked for two summers (summer help), while attending college EDUCATION
ICM
Associate Degree Accounting/ Business Management
Degree date: 1989
WVU
Electrical Engineering
1985-1987