Current Address: Prince Mash-hoor Bin Abd-Elaziz Street, Jubail, Saudi Arabia.
Permanent Address: Borg El Borolos, Kafr El Sheikh, Egypt
Mobile: +966-*********& (002) 010********
E-mail: ***.*************@*****.***
Ibrahim Abd Elguid Ibrahim Hussin
Experience summary
Senior Mechanical Maintenance Engineer specialized at Static Equipment & piping with 12 years’ experience in the international oil& gas, petrochemicals, Refineries and Fertilizers industries. In Egypt, Saudi Arabia and Kuwait.
Responsible to develop the overall turnaround/shutdown plan for the static equipment and to supervise its execution
Responsible to develop the preventive and corrective maintenances for all static equipment at running plants
Prepare all static Equipment work package in annual plant shut down.
Good experience on Steam Reformers, heat Exchangers, reactors, boilers, valves, columns, vessels, piping systems etc
Good knowledge about NDT methods and giving recommendation for inspection teams.
Evaluating tender documents, drawings and schedules.
Follow up all PM and CM activities through CMMS, MAXIMO, SAP system.
Provide engineering support for all projects and studies executed by engineering and projects units
Aware by (SAUDI ARAMCO, SABIC & Equate) HSE and Rules.
Work Experiences
1.Period from 10/09/2013 till now
Job Title: Senior Mechanical Engineer (static equipment).
Employer: Al-Barrak Industrial Services Company (ABIS) at oil & gas and petrochemical plants in Saudi Arabia.
Plant: Saudi Aramco, SABIC & Equate petrochemical plant.
Responsibilities & duties:
Carrying out Maintenance activities in Static Equipment’s like Steam Reformer, Reactor, Boilers, Heaters, Distillation Column, Heat Exchangers, Vessels, Fin Fan coolers, Pipe lines and other miscellaneous equipment’s
Giving technical maintenance support during Turnaround& shutdown activities and ensuring that the correct components and procedures are followed to ensure quality control.
Responsible for fully understanding the scope of work and planning the work in conjunction with the assigned supervisors and engineers.
Responsible for monitoring progress and adherence to the plan during execution and providing recommended corrective actions based on analysis of schedule and financial data.
Required to manage all turnaround financial and schedule reporting and forecasting.
Coordinate with Operation /inspection /supervisor for other equipment to make the plan effectively
Assist for Preparing the budget, man hour, and schedule for TA.
Developing overall a plan for TA.
Prepare risk schedules to identify and quantify risks and mitigation measures.
Maintain good client relationships at all times.
Built a data base for mechanical equipment.
Review contract documents & technical clarification to Company (client)
Preparing Technical Requisition package.
Technical Bid Evaluation and Risk Analysis
Coordination with other disciplines, supplier and client
Participating in site surveys, EX meeting and kick off meeting to establish and identify the requirements
Material requisitions as a part of the commercial department purchase requisitions for new equipment
Engineering packages, including equipment specifications, datasheets, drawings, etc.
Working in the different projects and turnarounds as per the below details:
Working as (project in charge ) at Saudi ARAMCO from March 2017 till now In Shedgum, Hawiyah, Uthmanyiah and Haradh areas in gas well head maintenance
Responsible for gas well stripping out and remanifolding for all piping spools, all instrument, electrical devices, connection and piping supports according to aramco schedule, well revision (1 to 7) using cranes/forklift and backhoe loader.
Responsible for gas well tightness and hydro test up to 10000 psig testy pressure according to aramco schedule,well revision (1 to 7) using high pressure hydro test pump and 15000psi approved manifold.
Working as (project in charge office based) at Saudi ARAMCO from August 2016 till March 2017 In Gas upstream Div.in Shedgum,Uthmanyiah two gas wells head/flow lines construction under Aramco PMT,PID&VID .
Reviewing all drawing for two well head and related 6 inch flow lines (4.8km&3.7km).
Preparing all technical queries for all projects (mechanical, structural works, electrical /instrument/civil and cathode protection works) and giving the recommendation for the team to overcome any project issues.
Responsible for subcontract all project subcontractors/suppliers, and dealing with them from technical and procurement sides(valves testing, RTR construction, instrument calibration, cathodic protection installation, structural fabrication, bolt torqueing /hydro testing, laying up or pigging, equipment suppliers
Responsible for two project hydro testing up to 18000Psig test pressure.
Pre commissioning for all E&I works, project walk through, and punch list rectification.
Working as (project construction in charge ) at Saudi ARAMCO from May 2016 till march2017 In Yanbu Refinery plant in installing of N2 piping system
Performing prefabrication,erecting, installing by welding,NDT 10% RT,and hydro testing, sandblasting and painting for 3&4 inch pipe line 4500 LM .
Installing five equipment (two pressure vessels, two compressors, one metering unit skid).
Installing all civil foundation for these equipments.
Installation all electrical works, instrument, communication and firefighting work.
Working as (shutdown in charge ) in August 2016 in SABIC (Hadeed steel plant)
In Replacement of feed gas DR preheater Module C plant (8 bundles).
Working as (project in charge ) in April 2016 in SABIC (Hadeed steel plant)
In Replacement of EOT 80/35ton in Hadeed Refractory w/s using 700 & 220 ton crane.
Working as (site in charge ) in Olefins’ II November TA 2015 in SABIC (Petrokemya plant)
Dismantling, bundle pulling, cleaning and installing 88 heat exchanger in 15days by bundle puller and crane different capacities (500,200,160,55ton cranes), 20hydrojetting machines (20k, 10k) psi.
Working as (site engineer ) in March 2015 in SABIC (Hadeed steel plant)
Equipment inspection
Pipe line fabrication
Working as (site engineer ) at (Equate) in November 2014 Equate petrochemical plant PE Turnaround
Equipment inspection
Pipe line cleaning
Pipe line fabrication
Working as (site in-charge ) at (SABIC) in October 2014 Petrokemia plant VCM Turnaround
Equipment replacement:
-Responsible for replacing around 23 old equipment by new (2 coulmns,15heat exchangers,2 vessels and 2 fin fans) by 500,200,80,55 tone cranes
Pipe line replacement :
-Responsible for Performing prefabrication, demolishing, erecting, installing by welding, NDT 100% RT and hydro testing for 71 package with total 1000 Diameter inches.
Bond Cleaning :
-Responsible for cleaning 3 big bonds by wet super sucker and hydro jetting machines 15kpsi.
Working as (project engineer ) at Saudi ARAMCO in May 2014 TRS Riyadh Refinery plant :
performing prefabrication,demolishing,erecting, installing by welding,NDT 100% RT,and hydro testing for 18,16,10,4,3,2.5 inch heater off gas pipe line 218 Lm,and supports, and installing four flame arrestors 10 inch.
Working as (T&I Engineer)at Saudi ARAMCO, Shedgum Gas Plant (SHGP) T&I (January 2014 & March 2014) in Sulfur Recovery unit (SRU#3)&(SRU#2) at the following jobs:
Unloading / screening then loading for several types of catalyst (ceramic ball, Activated Alumina, Titanium) for Three converter beds, the total capacity is (350 ton). By using super sucker machine, cyclone hopper, loading hopper, funnel, screening machine.
Unloading then loading for activated carbon of three BTX drums, total capacity is (240 m3). By using super sucker machine, cyclone hopper, loading hopper, funnel and Breathing apparatus.
Working as(T&I Engineer) at Saudi ARAMCO, Uthmania Gas Plant (UGP) T&I (October 2013) in Sulfur Recovery unit (SRU#2) & Gas Treat unit (GT#3) at the following jobs:
Unloading / screening then loading for several types of catalyst (ceramic ball, Activated Alumina, Titanium, Super clause ) for three converter beds, total capacity is (300 ton). By using dry super sucker machine, cyclone hopper, loading hopper, funnel, Breathing apparatus and Vibro screening machine.
Unloading/cleaning then loading Pall ring for column (80 M3) by using loading hopper and hydro jetting machine.
2.Period from 23/05/2007 till 9-9-2013
Job Title: Senior Mechanical Engineer (static& piping).
Employer: Egyptian Maintenance Company (EMC), is a leading company at oil & gas maintenance and construction field in Egypt
Plant: Union Fenosa Gas (SEGAS) Plant at Damietta, Egypt (Liquefied Natural Gas -LNG)
Responsibilities:
As a mechanical maintenance engineer responsible for supervise and perform the mechanical preventive & corrective and predictive maintenance works for the static equipment in these scopes.
Maintenance, repairing and overhauling for all valves types (Gate, Globe, Ball, Non return valve, Etc)
PRV & PSV and Pilot Operated Relive valve calibration.
Installing blinds for large diameter pipes up to 66”, 72”.
Apply hydrostatic and pneumatic test.
Good knowledge for using hydraulic torque wrench and bolt tension machine.
Loading Arms preventive and corrective maintenance.
Maintenance, repairing and overhaul for all Heat Exchanger types (Shell & tube – Plate – Air fan coolers).
Towers maintenance and internal replacement (valve trays – bubble cap trays – packing)
New projects calculations ( Material take off,Dry cost, timing plan, and Method of statement and test package )
Good knowledge about standards: ASME, ASTM & TEMA for Heat exchanger
Identifying spare parts requirements.
Familiar with QC inspection tests (NDT).
Maintenance for Thermal insulation works (hot&cold) - foam injection machine.
Preparing reports and life book for equipment as required.
Implementation of ISO 9001, ISO 14001, OSAS 18001, Prepare risk assessment & Tool Box Talk.
Attended the following shutdowns as static equipment maintenance engineer:
SEGAS Plant (Liquefied Natural Gas production plant) August 2007.
SEGAS Plant November 2008.
SEGAS Plant shutdown (Fractionation Area) July 2009..
SEGAS Plant (complete shutdown) July 2010.
Replacing the cold box at SEGAS site ( chart heat exchanger ) ( MAY 2012 )
As a piping& construction engineer responsible for preparing tender documentation then executing pipe lines and static equipments in these scopes.
Preparing the bidding tender documentation.
Prepare dry cost, MTO, test package, Scope of work, method of statement and timing plan.
Manage all site activities like welding, erection, inspection, fit up
Prepares the welding Maps & choose the most suitable points for Field and shop weld joints.
Prepare daily reports for progress, manpower, and priority.
Follow up the client procedure for Erection.
Follow up all quality assurance and safety precautions on the site.
Dealing with all type of drawing like Plot Plain, ISO, P&ID...etc.
Prepare hydrostatic test for all test package if required.
Complete all punch lists for all test package.
The Major Projects:
Misr fertilizer production company (MOPCO).
Work study and implementation of a project of the 6-inch line 814 long meters divided as follows:
oPerforming prefabrication,erecting, installing by welding,NDT 100 % PT,and hydro testing for 6 inch blow down pipe line 264 Lm, design the pipe supports,fabrication and install at site.
Implementation of 550 long meters underground 6 inch UPVC line with 20 m Asphalt road crossing by Boring technique with assistant of dewatering system with underground Valves pit room (1.5m length X 1.5m wide X 2m height).
Work study and implementation of a project of the 8-inch line 84 long meters divided as follows:
o Performing prefabrication,erecting, installing by welding,NDT 100 % PT,and hydro testing for 8 inch fire fighting pipe line 24 Lm, design the pipe supports,fabrication and install at site.
Implementation of 60 long meters underground 8 inch UPVC line with 20 m Asphalt road crossing by boring technique with assistant of dewatering system.
Work study and implementation of a project of the 10-inch line 393 long meters divided as follows:
Performing prefabrication,erecting, installing by welding,NDT 100 % PT,and hydro testing for 10 inch blow down pipe line 12 Lm, design the pipe supports,fabrication and install at site.
Implementation of 381 long meters underground 10 inch UPVC line with 20 m Asphalt road crossing by Boring technique with assistant of dewatering system with underground valves pit room (2.5m length X 2.5m wide X 2m height)
Union Fenosa Gas (SEGAS) Plant at Damietta, Egypt (Liquefied Natural Gas -LNG).
Performing prefabrication, erecting, installing by welding, NDT 10% RT&100 % PT, and hydro testing for 8& 2 inches service water pipe line 200 Lm, design the pipe supports, fabrication and install at site.
Implementation of 1000 long meters underground 4 inch UPVC line with 60 m Asphalt road crossing by Boring technique.
3.Period from 01/11/2006 to 22/5/2007
Job Title: O&M Mechanical Engineer
Employer: TAM Environmental Service for water desalination (Sharm Elsheikh)
Plant: Montana RO plant, four session hotel RO Plant, Rotana hotel RO plant, coral beach hotel RO plants.
Responsibilities:
Follow up Al Montana RO plant operation and maintenance 4000 M /day.
Repair the plant water feed wells pump after extracting from the wells.
Replace the cartridge filter elements.
Follow up all preventive maintenance for all equipment (pumps, motors).
Maintain the water feed and high pressure pumps.
Training Courses
Course Title
Organizer
Duration
Project management professional course
Saudi Council Of Engineers
35 hrs
Pressure vessel design and inspection
EMC (Head Training Center)
1 week
Technical report writing
EMC (Head Training Center)
1 week
Material selection
EMC (Head Training Center)
1 week
Piping design and fabrication
EMC (Head Training Center)
1 week
Education
Faculty of Engineering - Mansoura University, Egypt
B.Sc. in Mechanical Power Engineering, 2000-2005 (June 2005)
General grade : Very good with honor degree 79.57% (4th Rank)
Computer Skills
Microsoft Office (word-excel-power point)
Internet (navigation, searching... etc.).
Languages
Arabic: mother tongue
English: very good (spoken and written)
Personal Profile
Self-motivated, patient, energetic, willing to work hard.
Good communicating skills.
Flexibility (relocation).
Mobility (traveling).
Follow up the safety instruction and rules during carry out the job.
Adhering with the safety instructions for hazardous area work orders and take the proper precautions before starting the job
Personal information
Date of birth: 15th October 1983.
Place of birth: Borg El Borolos, Kafr El Sheikh, Egypt.
Nationality: Egyptian.
Marital status: Married.
Military status: Exempted.
Passport status: Available.
Drive License: Available (Egypt, Saudi Arabia).