Mechanical Engineer `Summary`
Outstanding record of skilled engineering focused on planning, organizing, developing and improving manufacturing processes and projects, increasing efficiency, streamlining workflow, managing multiple capital and maintenance projects, talent for maintenance leadership, implemented manufacturing efficiency and general process improvements, handled facilities infrastructure and maintenance programs. Lead teams attaining mill goals
Achieved cost effective and time constrained maintenance controlled projects
Precision on identifying and capitalizing on changed processes to generate profitable ideas for improvements
Made decisive and complete department management of projects and completion.
Assisted with and provided the following
A). Formal Root Cause analysis
B). Trained operations and Maintenance on TPM analysis
C). Trained Operation and Maintenance on Bill of Materials
Developed major overhaul scopes for all plant operations equipment for repairs.
problems and machinery operation processes
Education: NCSTATE UNIVERSITY BSME 3.4/4.0
`
WYNN’S CONTRACT ENGINEERING WORK 1/2013 – 6/2017
GP SAVANAH, Georgia, Drew up waste handling
equipment with pumping, operation and oversaw
installation of equipment
GP SAVANAH GEORGIA- handled paper projects,
from start to finish, installed equipment and installed
and started equipment
GP SAVANA Georgia, Lead paper modifications,
performed drawing, installed equipment
GP SAVANAH, GEORGIA- lead duct design work
for customer projects, Provided shop foreman
with drawing updates, Researched vendors
online for improved shop construction.
GP SAVANAH, GEORGIA- provided designed
Drawing for the install of dust handling system,
emailed to plant engineer, calculated the beam
loading for the dust handling tubing.
CLUB CAR IN MARTINEZ, GEORGIA- Completed
planning, designing, setting-up, optimizing
and monitoring manufacturing processes increasing
efficiency. evaluated, and improved manufacturing
methods, utilizing product design, materials and parts.
KIMBERLY-CLARK CORPORATION 10/1988 – 08/2012
PROJECT ENGINEER - Beech Island, SC
Achieved installing, starting-up new product mill successfully launching new product
Controlled cost for $18 million project under budget
Expertly went to Europe for improving vendor equipment delivery
Acquired SAP training to improve work orders and cost control
Oversaw 8 mechanical engineers for plant manager for 3 months, watched over
the building of the new rolled wipe plant build
Implemented spending change documentation
Resolved issues with CGMP’s
Created drawing control documentation
Oversaw contractor’s equipment installations controlling schedule
Provided success criteria documentation
Oversaw facial bundling line project team controlling costs to $6 Million
Provided process capability study to determine by lean manufacturing the best equipment layout
Installed new conveyors, high-speed shrinkwrapper, and new palletizer/stretchwrapper per specifications
Accomplished business savings $5 million per year
Provided $6 million annual savings with two casepackers
Developed team justification study used lean manufacturing completed layout for department
Accomplished savings casepackers improved case production 40 percent
Provided $150,000 savings in TM department installing Sheet foils, Trim Removal equipment, and Hayout removal equipment.
Oversaw installation of fluid handling pump for metering fluid onto the sheet
KC PROJECT ENGINEER (Promotion) - Neenah, WI Staff Rolled Products 03/1998- 09/2000
Managed 4.1" Bath Tissue Sheet Length cost savings $500 thousand
Installed a Metering pump for Off Line Printer sheet application
Provided Chester, PA mill team project implementation
Improved necessary equipment delivery
Completed design engineering calculations per schedule
Oversaw $2 million savings per year meeting quality control customer acceptance
Installed and started up the pump process for applying solution to rolled products
KC SENIOR DESIGN ENGINEER – Neenah, WI Staff Facial Tissue 10/1988 - 03/1998
Oversaw designing facial cartoner speed-up
Completed engineering calculations
Developed equipment list
Implemented corrective and preventative solutions
Led mill team in designing cartoner speed modifications
Completed new Casepacker design specifications
Ordered equipment
Installed mechanical sectional drive