Resume

Sign in

Engineer Mechanical

Location:
Irmo, South Carolina, United States
Salary:
65000
Posted:
January 17, 2018

Contact this candidate

Mechanical Engineer `Summary`

Outstanding record of skilled engineering focused on planning, organizing, developing and improving manufacturing processes and projects, increasing efficiency, streamlining workflow, managing multiple capital and maintenance projects, talent for maintenance leadership, implemented manufacturing efficiency and general process improvements, handled facilities infrastructure and maintenance programs. Lead teams attaining mill goals

Achieved cost effective and time constrained maintenance controlled projects

Precision on identifying and capitalizing on changed processes to generate profitable ideas for improvements

Made decisive and complete department management of projects and completion.

Assisted with and provided the following

A). Formal Root Cause analysis

B). Trained operations and Maintenance on TPM analysis

C). Trained Operation and Maintenance on Bill of Materials

Developed major overhaul scopes for all plant operations equipment for repairs.

problems and machinery operation processes

Education: NCSTATE UNIVERSITY BSME 3.4/4.0

`

WYNN’S CONTRACT ENGINEERING WORK 1/2013 – 6/2017

GP SAVANAH, Georgia, Drew up waste handling

equipment with pumping, operation and oversaw

installation of equipment

GP SAVANAH GEORGIA- handled paper projects,

from start to finish, installed equipment and installed

and started equipment

GP SAVANA Georgia, Lead paper modifications,

performed drawing, installed equipment

GP SAVANAH, GEORGIA- lead duct design work

for customer projects, Provided shop foreman

with drawing updates, Researched vendors

online for improved shop construction.

GP SAVANAH, GEORGIA- provided designed

Drawing for the install of dust handling system,

emailed to plant engineer, calculated the beam

loading for the dust handling tubing.

CLUB CAR IN MARTINEZ, GEORGIA- Completed

planning, designing, setting-up, optimizing

and monitoring manufacturing processes increasing

efficiency. evaluated, and improved manufacturing

methods, utilizing product design, materials and parts.

KIMBERLY-CLARK CORPORATION 10/1988 – 08/2012

PROJECT ENGINEER - Beech Island, SC

Achieved installing, starting-up new product mill successfully launching new product

Controlled cost for $18 million project under budget

Expertly went to Europe for improving vendor equipment delivery

Acquired SAP training to improve work orders and cost control

Oversaw 8 mechanical engineers for plant manager for 3 months, watched over

the building of the new rolled wipe plant build

Implemented spending change documentation

Resolved issues with CGMP’s

Created drawing control documentation

Oversaw contractor’s equipment installations controlling schedule

Provided success criteria documentation

Oversaw facial bundling line project team controlling costs to $6 Million

Provided process capability study to determine by lean manufacturing the best equipment layout

Installed new conveyors, high-speed shrinkwrapper, and new palletizer/stretchwrapper per specifications

Accomplished business savings $5 million per year

Provided $6 million annual savings with two casepackers

Developed team justification study used lean manufacturing completed layout for department

Accomplished savings casepackers improved case production 40 percent

Provided $150,000 savings in TM department installing Sheet foils, Trim Removal equipment, and Hayout removal equipment.

Oversaw installation of fluid handling pump for metering fluid onto the sheet

KC PROJECT ENGINEER (Promotion) - Neenah, WI Staff Rolled Products 03/1998- 09/2000

Managed 4.1" Bath Tissue Sheet Length cost savings $500 thousand

Installed a Metering pump for Off Line Printer sheet application

Provided Chester, PA mill team project implementation

Improved necessary equipment delivery

Completed design engineering calculations per schedule

Oversaw $2 million savings per year meeting quality control customer acceptance

Installed and started up the pump process for applying solution to rolled products

KC SENIOR DESIGN ENGINEER – Neenah, WI Staff Facial Tissue 10/1988 - 03/1998

Oversaw designing facial cartoner speed-up

Completed engineering calculations

Developed equipment list

Implemented corrective and preventative solutions

Led mill team in designing cartoner speed modifications

Completed new Casepacker design specifications

Ordered equipment

Installed mechanical sectional drive



Contact this candidate