DOMINGO E. BONAOBRA
Block ** Lot * Phase *, Mabuhay City Subdivision
Mamatid, Cabuyao, Laguna, Philippines, 4025
Mobile No.(Phils.): (063) 091*-*******
Mobile No.(Riyadh): (966) 054-***-****
Email Add: ***********@*****.***
Objective
To apply for a job to a prestigious company of international standards and to be able to share my knowledge I gained thru continuous studies and previous experienced related to the work I am applying for.
Career Summary / Work Experience:
Mar. 06, 2016 – Present Al Bawani Co.
P.O Box 65697, Riyadh 11566
Prince Sultan Street, Olaya, KSA
E-mail: ****@********.***
Tel: 011-***-****, Fax: 011-***-****
Planning Engineer
Department
Assist respective Project Manager with the preparation of Baseline Schedules and preparation of Project Report Status on desired frequency of reporting.
Liaise with the Consultant engineers for the development of Baseline and tracking of schedule with the Outside contractors
Updating Internal and Consultant To-Go-List of Activities in coordination with operation engineers and Quality Control Engineers.
Prepare and consolidate work schedules, accomplishments, monitoring and progress reports from site project team.
Attend schedule tracking meeting with Consultant and Outside Contractor
Perform other task as maybe assigned by the Planning Department Manager. Feb. 22, 2015 – Dec.17, 2015 Rawafid Al Torok Contracting Est. P.O. Box 3666, Riyadh 11481
Kingdom of Saudi Arabia
Tel: 966-*-*******, Fax: 966-*-*******
Planning Engineer
Technical Department
Assist respective Project Manager with the preparation of baseline schedules for the construction of roads and bridges in Riyadh Region of Saudi Arabia.
Updating Project Status, analyzing current against approved baseline schedule for cost and schedule impact, preparation of Project Progress Update, target schedule and look ahead schedules on agreed frequency, Cash Flows, Planned
% complete and Actual % Complete S-Curves, and other necessary reports as may be essentially required in determining health of the project in totality.
Prepare and consolidate work schedules, accomplishments, monitoring and progress reports from site project team.
Career Summary / Work Experience (Continued)
Monitor and consolidates work delays caused by other parties for extension of time (EOT) claims to the client.
Attend schedule tracking meeting as scheduled by the Project Manager.
Perform other task as maybe assigned by the Technical Department Manager. April 25, 2012 – Nov. 15, 2014 Trans Resources Corporation Sdn Bhd TRC Business Center, Jalan Andaman Utama
68000 Ampang, Selangor Darul Ehsan, Malaysia
Tel.: 603-********; Fax. No. 603-***-*****
Site Engineer
Civil and Structure Department
Oversight civil and structure execution in the construction of Brunei International Airport Modernization Project, specifically assigned in the construction of New Terminal Building and Link Bridges.
Preparation of Method Statement in carrying out the work as assigned by the company.
Preparation, submittal and follow-up of Material Approval.
Preparation of Inspection Request and attend joint inspection with the consultant and project management team.
Attend schedule tracking meeting and other meeting as scheduled by the Project Manager.
Estimate and request approved materials and ensure that all are delivered according to schedule.
Preparation and submit accomplishment report according to the frequency as required by the QS department, consultant and project management team.
Prepare Request for Information, Field Change Request, and closing Site Instruction and Non-Conformance Report as necessary according to project site conditions and received for construction drawings.
Participate in Safety, Security, Health and Environment program set-up by the Safety Department.
Perform other task as maybe assigned by the Project Manager. June 28, 2011 – Feb. 21, 2012 Gulf Safety & Fire Protection Services Co. P.O. Box 26389, Safat 13124 Kuwait
Project Engineer
Construction Department
Prepares Bill of Quantities and Materials for Fire Alarm and Fire Suppression System required for the execution and completion of the project.
Assist the Design and Engineering team in the preparation of documents submittals including re-submission such us Cause and Effect Chart, Fire Alarm Address Table, Materials Data Sheet, Design Plans and other documents as may be required by the client.
Supervise in the installation of Fire Alarm and Fire Suppression System in coordination with other trades for some inter phasing ( e.g. HVAC and others )
Ensure that Auto-Cad Operators are feed with enough information in the finalization of Design Drawing Plans and As-Built Drawings prior to submission to Client.
Career Summary / Work Experience (Continued)
Ensure that all are in compliance and within the standards of materials and workmanship in order to insure the performance of the system are according to the design and to the satisfaction of the client.
Request and follow-up materials and supplies procurements and deliveries and ensure that all deliverables are according to schedules as specified in the contract.
Update of project status according to the frequency as required by the Planning Engineer and the Accounting Section for Project Report and Invoice preparation purposes.
Oct. 27, 2005–Jan.15, 2011 Libyan Int’l. Company for Const’n. and Real Estate Investment (LICR), Al Fallah Road, Tripoli, Libya
Tel.: (218-*****-****; Website: www.licr-ly.com
Planning Engineer / Quantity Surveyor
Project Execution & Management-Planning Section
Assist the Project Manager with the project planning and preparation of work sequences for implementation including the close monitoring of the project progress during execution.
Updating Project Status, analyzing current against approved baseline schedule for cost and schedule impact, preparation of Project Progress Update, target schedule and look ahead schedules on agreed frequency, resource graph, S- Curves, and other necessary reports as may be essentially required in determining health of the project in totality .
Prepare and consolidate work schedules, accomplishments, monitoring and progress reports from Civil, Electrical, Mechanical and other trades working that are included as part of the project team.
Prepare and submit invoices for proper evaluation and approval by the Project Consultant.
Prepare and submit material samples and specifications for approval by the Project Consultant.
Prepare Bill of Quantities and Shop Drawings.
Follow-up pending plans from the Technical Group and assist in the interpretations of the plan to the Execution Group.
Establish methods to meet work schedules and co-ordinate work activities with other trades.
Resolve work problems and recommend measures to improve productivity and product quality.
Ensure that all are in compliance and within the standards of materials and workmanship in order to insure the performance of the facilities are according to the design.
Prepare evaluation documents for sub-contractors invoice. Request and follow-up materials and supplies procurements and deliveries and ensure that all deliverables are according to schedules as specified in the contract. May 22, 1998–Sept.30, 2005 Taisei Philippine Construction Inc. (TPCI) 23rd Floor Equitable Bank Tower, Paseo De Roxas,
Salcedo Village, Makati City, Philippines
Senior Operation Engineer/Operation Head
Construction Department
Career Summary / Work Experience (Continued)
Participate in the Project Quality Control and ensure that all are in compliance and within the standards of materials and workmanship in order to insure the quality and performance of the facilities are according to the design.
Supervise a team in the execution of the work, coordinate and schedule the activities of construction workers engaged in earthworks, rebar work, formworks, concreting works, cement finishing, structural steel works, roofing, block laying, plastering, tile setting, marble setting, drywall installation, glazing, insulating and painting, ceiling installation, waterproofing, signage installation, and workers of other specialty works, in the construction of Industrial and Power Plants, site developments and utility buildings.
Establish methods to meet work schedules and coordinate work activities with other trades.
Resolve work problems and recommend measures to improve productivity and product quality.
Request and follow-up materials and supplies. Train workers in job duties, safety procedures and company policies thru daily tool box meeting.
Recommend personnel actions such as hiring and promotions.
Prepare work schedules, accomplishment monitoring and progress reports.
Check and Approved prepared activity checklists such as rebar, forms, concreting checklist and other Project Quality Control Plan requirements.
Attend coordination meeting with Owner/Client, Main Contractor, other vendors and sub-contractors on agreed frequencies
Sept. 16, 1997–May 20, 1998 Sussex General Contracting Phils. Inc. G/F GBI Building, 2282 Pasong Tamo Extension
Makati City, Philippines 1231,P.O. Box 2701
Civil Engineer/Quantity Surveyor
Head Office Engineering Office
Prepare estimates of probable costs of materials, labor and equipment for construction projects based on contract bids, quotations, schematic drawings and specifications.
Established and maintain tendering process, and set up cost monitoring and reporting systems and procedures.
Prepare cost and expenditure statement, and forecasts at regular intervals for the duration of the projects.
Prepare and maintain a directory of suppliers, contractors, and sub- contractors.
Liaise, consult and communicate with engineers, architects, owners, contractors, sub-contractors, and prepare economic feasibility studies on changes and adjustments to cost estimates
Manage and coordinate construction projects and prepare construction schedules
Sept. 2, 1994–Aug.27, 1997 Sta. Clara, International Corp. (SCIC) 97 Epifanio de los Santos Avenue, Makati City,
Philippines, Tel.: 632-***-****; 632-***-****
Project Superintendent
Construction Department
Career Summary / Work Experience (Continued)
Participate in the Project Quality Control and ensure that all are in compliance and within the standards of materials and workmanship in order to insure the quality and performance of the facilities are according to the design.
Supervise a team in the execution of the work, coordinate and schedule the activities of construction workers engaged in earthworks, rebar work, formworks, concreting works, cement finishing, structural steel works, roofing, block laying, plastering, tile setting, marble setting, drywall installation, glazing, insulating and painting, ceiling installation, waterproofing, signage installation, and workers of other specialty works, in the construction of Industrial and Commercial Buildings, site developments and utility buildings.
Establish methods to meet work schedules and coordinate work activities with other trades.
Resolve work problems and recommend measures to improve productivity and product quality.
Request and follow-up materials and supplies. Train workers in job duties, safety procedures and company policies thru daily tool box meeting.
Recommend personnel actions such as hiring and promotions.
Prepare work schedules, accomplishment monitoring and progress reports.
Check and Approved prepared activity checklists such as rebar, forms, concreting checklist and other Project Quality Control Plan requirements.
Attend coordination meeting with Owner/Client, Main Contractor, other vendors and sub-contractors on agreed frequencies. Mar. 18, 1992–Aug.30, 1994 Control Construction Inc. (CCI) Control Bldg. 1277 Estrada St.cor. South Super
Hi-way, Sta. Ana Manila, Philippines
Site Engineer
Construction Department
Participate in the Project Quality Control and ensure that all are in compliance and within the standards of materials and workmanship in order to insure the quality and performance of the facilities are according to the design.
Supervise a team in the execution of the work, coordinate and schedule the activities of construction workers engaged in road and sidewalk breaking, pipe laying, pipe bridge attachments, earthworks, rebar work, formworks, concreting works, road and sidewalk restoration works, and workers of other specialty works in the construction of Telecommunications Manholes and Conduits.
Resolve work problems and recommend measures to improve productivity and product quality.
Request and follow-up materials and supplies. Train workers in job duties, safety procedures and company policies thru daily tool box meeting.
Recommend personnel actions such as hiring and promotions.
Prepare work schedules, accomplishment monitoring and progress reports.
Check and Approved prepared activity checklists such as rebar, forms, concreting checklist and other Project Quality Control Plan requirements.
Attend coordination meeting with Owner/Client, Main Contractor, other vendors and sub-contractors on agreed frequencies. Education and Qualifications:
June 1974–Mar.1980 Completed Elementary Education @ Malilipot Central School, Malilipot, Albay
June 1980–Mar.1984 Completed Secondary Education @ Tabaco Nat’l. High School, Panal, Tabaco, Albay
June 1984–Apr.1989 Completed College Degree (Bachelor of Science in Civil Engineering)@Aquinas University of
Legazpi, Legazpi., Albay
Aug. 05, 1990 Took and Passed the Civil Service Eligibility Examination with Civil Service Commission
Certificate No. 9-0002590
Aug. 16, 1990 Took and Passed the Philippines Licensure Examination for Civil Engineers with PRC
Registration No. 0058285
May 14, 2015 Saudi Council of Engineers
Membership No. 241759
Date Issued: May 4, 2015
Professional Development
1998- 1998 Job Hazard and Construction Safety Course Shell Philippines, PCED- Hostel, UP, Diliman, QC, Phils. Nov 17-21, 1997
2008- 2008
May 5 – 7, 2010
Apr 29-30, 2013
Occupational Safety and Health Seminar Safety
Organization of the Philippines Inc., Baguio City, Phils. ERP Solutions Short Seminars (IFS / SAP/ ORACLE )
LICR Office, Tripoli, Libya
Primavera 6 Training Course,CIM Technologies, Inc. Training Center,Unit 302 SEDDCO 1 Bldg.,120 Rada
cor. Legazpi Sts.,Legazpi Village, Makati City, Phils. First Aid and CPR Course
Ministry of Health
Negara Brunei Darussalam
Computer Skills
Primavera 6.7, Primavera 3, MS Project 2013, Auto Cad 2015, Excel, Word, Power Point, StaadPro.2007, Internet and Email
Personal Details
Age: 49
Date of Birth: June 11, 1967
Gender: Male
Civil Status: Married
Height: 162.6 cm
Weight: 71 kg
Nationality: Filipino
Religion: Christianity – Roman Catholic Rite
Passport Detail :
SSS ID No. :
TIN No. :
Philhealth No. :
NBI No. :
Passport No. EC5326644
Place Issued : PE RIYADH
Date Issued : 14 Sep 2015
Expiry Date : 13 Sep 2020
03-7667967-3
146-036-821
B241D4BRAG00000
References
MR. YASSIN MNAWER Project Area Manager
Rawafid Al Torok Contracting Est
P.O. Box 3666, Riyadh 11481
Kingdom of Saudi Arabia
Tel: 966-*-*******, Fax: 966-*-*******
MR. LOH LEH WONG Director
TRC (B) Sdn Bhd
Unit 36, 1st Floor, Haji Munchit & Dayang Rapiah
Complex, Spg 13, Kg. Jaya Setia, Jln. Berakas
Bandar Seri Begawan BB 2713
Negara Brunei Darussalam
Tel: 006**-***-****, Fax: 006**-***-****
MR. MAREK KEDZIERSKI General Manager
Gulf Safety & Fire Protection Services Co. W.L.L
Building No.25, Street 105, Block 8, South Subhan
P.O. Box 26389, Safat 13124 Kuwait
Tel. Off.: 965-***-****-5
Email: *****@**********.***
MR. MOHAMED M. LAMIN Chief Executive Officer
Libyan Int'l. Const'n. And Real Estate Inv. Corp
Al Fallah Airport Road, Tripoli, Libya
Tel.No.: 00 218 21-913******
Email: ******@*****.***
References (Continued)
MR. S.K. HONG Project Manager
Libyan Arab Domestic and Investment Company
Hey Al Akwakh, Tripoli, Libya
Cel. No. : 00 218 21-913-******
Email : *************@*****.**.**
This is to certify that all information mentioned above are true and correct to the best of my knowledge.
DOMINGO E. BONAOBRA
Applicant
R Available On Request