Utkarsh Singh (BE, Mechanical)
E-mail: *****.**********@*****.***
Contact No.:727-***-****, 741-***-****
post applied for-production engineer
Career Objective
To work with progressively and professionally managed organization where my professional and technical abilities in the field of mechanical engineering are utilized to the optimum level and to be a part of an Organization where it has ample learning in the team-oriented environment.
Career Overview
1.6 years of experience at Supercritical Thermal Power Projects as execution engineer. (Structure, Piping,)
Key skills and strengths
Quick learner, Ready and receptive to change.
Efficient planning and coordination of activities
Effective quality checking of final deliveries
Working knowledge of Engineering Materials & International Standards
Excellent Time Management to finish the work scheduled on Time
People oriented person and team player, open to learning from feedback.
Good communication skills.
Hard working & innovative ideas.
Analytical & problem solving Attitude
Well versed with the usage of MS Excel.
Professional experience
Company: Singh erector Private limited from jan 2016-present
Project: 2x660 MW capacity power project. L&T MHPS has the contract of Supercritical Boiler awarded to M/S SEPL (steam generator) package. The owner of this project is NTPC, Tanda (UP).
Area of Work: Boiler Execution & Planning (Structure, Piping).
Job Profile:
Responsible for the Construction and Monitoring the site activity of Structure, Pressure Parts, Boiler around piping, other piping.
Preparation of detailed erection procedures & method statements.
Review the Engineering Documents, i.e. B.O.Q, P&IDs, Isometrics & Plant/piping drawings and optimizing material and resources requirement.
Planning, monitoring & controlling all site activities including manpower planning, resource planning & material planning for the systems/sub systems assigned by the Site Manager.
Continuously monitor the work progress as per the approved construction /erection schedule.
Attending site coordination meeting as required with client along with site-in-charge for resolving problems associated with the area of work.
Achievements:
Successfully executed Ceiling Girder Jack up (3000MT) within 09 days.(Record time)
Successfully executed Nose block (Part of boiler pressure parts) first to final jack up within 32 days.
Successfully completed Hydraulic test (at 404 kg/cm2) of pressure parts.
Awarded the best EHS performer of the year 2016-2017.
Qualification
Educational Qualification and Passing Year
Institute
Major and Specialization
Percentage Obtained Bachelor of Engineering,
(2015)
Globus Engineering college Bhopal (MP)
Mechanical Engineering
78. 00
Intermediate (2011)
S.N. Inter College,khamariya,bhadohi,
UP Board
12th Standard
69. 9
High School (2009)
S.N. Inter College,khamariya,bhadohi,
UP Board
10th Standard
69
Gate score 2015 - 416
Hobbies
Sketching, Reading, Travelling, listening Music
Personnel details
Date of Birth : 28 aug
1994
Nationality : INDIAN
Permanent Address : khamariya,post-khamariya, sant ravidas Nagar bhadohi (U.P)-221306
Languages Known : English, Hindi
I do hereby declare that all the statements furnished above are true and correct to best of my knowledge and belief.
●Place:bhadohi Date: 21.12.2017 (Utkarsh Singh )