PRAVEEN SHARMA
Contact: +91-955*******, +91-963*******
E-Mail: ac2yk9@r.postjobfree.com, ac2yk9@r.postjobfree.com
JOB OBJECTIVE
Seeking challenging and rewarding assignments in Project construction and management preferably in Petrochemical and Power Sector where I can productively apply the skill that I currently possess towards the progress of the organization and myself being a quick learner and the person with professional attitude, believe that I can prove to be an asset for the organization.
PROFILE SUMMARY
An astute professional with over 7 years and 01 months of experience in Project Management, Resource Planning Fabrication, Erection & Pre-Commissioning, and Handing over to O&M Department .
Currently working with Reliance Industries Ltd. ( J-3 Project), Jamnagar, Gujarat as Construction Engineer - Project Management
Possessing through knowledge in Co-ordination with Consultant, Contractors & Other related Agencies for Schedule Completion of Project and issuing Piping Drawing (GAD), P& ID & Support Drawings, Isometrics etc.
Deft at Materials Control and Material constraint & Pre-Commissioning of Plant Piping for Process Lines, Utility Lines, Fire Protection System etc.
Capability in overseeing plant activities from conceptualization to execution including stage inspections, scheduling, progress monitoring, site management, vendor management and manpower planning.
Adept in developing project baselines; monitoring and controlling with respect to cost, time over-runs and quality compliance to ensure satisfactory execution of projects.
Extensive Experience in AG & UG Piping Fit-up, Fabrication and Erection inspection, Static and Rotary Equipment Erection, UG Coating Inspection, ISO Clearance with contractors, Mechanical Clearance and Loop Clearance with Co-ordination with O&M Department, Hydro Testing,, Final Box-up, Site Planning, Supervision of Multi-Disciplinary Construction Activities, Materials Control and Construction Progress Monitoring etc.
Adroit in managing Erection & Commissioning of Water Treatment Plant, 180 TPH CFBC Boiler.
Proficiency in Readiness to Face New Challenges and Take up Projects where knowledge, Skill and Ambience together can contribute to betterment.
High degree of Interpersonal Communication Skills, Positive Approach, Combination of Skills, Academic excellence and Superior Personal Attributes.
An excellent planner with good problem solving and people management skills.
Identifying the bottleneck and workout to solve the same.
CORE COMPETENCY
þConstruction Activities Management
þStudy of Isometric Drawing
þFabrication & Erection
þMechanical Clearance and Final Box-up
þErection & Pre-Commissioning
þMaterials Management
þVerifications & Certification of Bills
þMIQA & PSSR Audit
þSite Planning & Supervision
þSite Monitoring
þPreparing Reports (Weld Visual & NDT Records) etc.
þStrategic Planner
þAnalytical & Problem Solving Skills
þTeam Leadership Skills
þHydro & Pneumatic Testing
PROFESSIONAL EXPERIENCE SCAN
Apr'14 – Till Date: Reliance Industries Ltd. Jamnagar, Gujarat as Piping Engineer - Project Management
Role:
Responsible for Project planning, Site Execution, Spool Management, Maintaining quality job and coordination with various contractors.
Static and Rotary Equipment Erection of ROGC Unit likes Column, Pumps, Cold-box, Blowers, Compressor, Condenser, turbines, Heat Exchangers, etc.
Maintaining the documentation record for monthly preparation of detail of UG Pipe lowering, AG Pipe erection, Spool Status and workout for the required inputs to complete the job within time.
Coordination with PFS dept. to track the timely supply of spool and updating the status day to day basis.
Coordination with design department regarding the collection of drawings and distributing the same for further execution.
UG Piping: - Checking the fit up, Hydro-testing of Pipe, Pipe lowering in the trench, Coating over the joints and giving further clearances backfilling.
Coordination with quality, civil and electrical dept. to clear the pipe line for getting backfilling clearance.
AG Piping: - Pipe Erection fit up and alignment, Piping support, Checking and witnessed of ISO clearance, Loop clearance, Mechanical clearance, Testing (Hydro & Pneumatic) of loops and box-up of loops and handed to O&M department.
Responsible for system wise PSSR activity.
Execution of Tie-In job in coordination with plant operations department.
Hydro testing of low pressure and high pressure loops, with pressure ranging from 10 kg/cm To 187 kg/cm in UG/AG piping.
Verifying and approving the contractor’s daily / Weekly certification of JMR's / RA bills.
Adequate crane capacity is used for erection & rigging scheme is followed for heavy pipe/spool erection and approving the P&M log sheet.
Managing the all aspects of safety at worksite by following PERMIT system including job risk assessments and isolation risk assessments.
Weekly doing the Site Safety Audit and preparation of report.
Ensure Compliance of all piping related ITP's.
Project Handled:
Title: Refinery off Gas Cracker (ROGC) Unit in J-3 Project
Highlights:
Successfully handing over of ROGC Plant and its Cooling Tower including AG piping erection, Mechanical clearance, Hydro testing and Box-up of loop files to O&M department.
Independently completed Erection of AG piping about 55000 IM out of total Area Scope of 42 Lakhs IM.
Independently completed lowering of UG piping about 124000 IM out of total Area Scope of 8.5 Lakhs IM.
Completed about 40000 IM ISO clearance, Loop clearance & testing and handing over to O&M department.
Project Handled:
Title: Low Density Poly ethylene (LDPE) unit in J-3 Project
Highlights:
Completing the testing (Hydro & Pneumatic) of about 2.4 lakh IM piping of CS, SS, Alloy Pipes and Steam Tracing tubes.
Hydro testing of low pressure and high pressure loops, with pressure ranging from 10 kg/cm to 350 kg/cm in AG piping.
Project Handled:
Title: Mono-ethylene Glycol (MEG) unit in J-3 Project
Highlights:
Completing the final box-up of loops.
Responsible for system wise PSSR activity and also involve in MIQA and WTPA Audit.
Jul'10 – Mar'14: Concast Steel & Power, Jharsuguda, Odisha as Engineer - Project Management
Role:
Responsible for Project planning, monitoring, quality job and Coordination with various vendors and contractors.
Equipment Erection of Boiler, Turbine, Compressor, Condenser, Pumps, Blowers etc.
Managing all IBR lines and formalities
Carrying out erection activities and alignment of steel structure according to drawings, total material inspection, fabrication quality and checking the measurement
Examining and alignment of centrifugal/rotary pumps, fan & valve fitting (butterfly, ball, gate/glove valve)
Scrutinizing & executing activities at site
Maintaining the documentation record.
Identifying the bottleneck and workout to solve the same.
Reviewing all bill of quantity like steel & incoming raw material, etc.
Involved in 4000 MT steel fabrication, erection in Boiler and TG building emphasis indents of structure steel, pipe & raw materials
Highlights:
Erection of Equipment and Structural Fabricated material of 180 TPH CFBC And 10 35 TPH WHRB.
Successfully commissioning and Hydro-Testing of 180 TPH CFBC Boiler at 199.5Kg/cm2 Pressure.
Successfully completed commissioning of 27m3 Water Treatment Plant.
Erection and testing of 30/5 MT EOT Crane in TG building.
Efficiently done alignment of 30 MW BHEL make Turbine, Gearbox and Generator
Project Handled:
Title: 70 MW (1x40 MW CFBC & 1x30 MW WHRB) Captive Power Plant Project
CERTIFICATES
Valuable contribution in Achieving 25 Million Safe Man-hours at ROGC J3 Project
IT SKILLS
oTools: AutoCAD (2004, 2006 & 2008)
oOperating Systems: Windows 7 & 8/2000/XP/ Vista
oMS office, Excel, word, power point.
EDUCATION
MBA in Project Management (Distance Education) from CSET Computer Education Institute, Agra, Sikkim Manipal University
B.Tech. (Mechanical) from Sachdeva Institute of Technology, Mathura, U.P. Technical University in 2010 with 70.8%
12th from Holy Public School, Agra, UP, C.B.S.E. Board in 2006
10th from Kids Corner Senior Secondary School, Tundla, UP, C.B.S.E. Board in 2004 with 76.33%
CERTIFICATIONS
Certification in AutoCAD & CATIA from Agra & Gr. Noida
PERSONAL DETAILS
Fathers Name Mr. Ram Sewak Sharma
Date of Birth: 16th July, 1987
Address: Mr. Ram Sewak Sharma c/o Mr. Rajesh Yadav, Natraj Puram Colony, Tundli Road, Tundla, Firozabad, 283204
Sex Male
Marital Status Married
Languages known Hindi & English
Nationality Indian
Passport M6117048
Notice period 01 Month
References: Available on Request
DECLARATION
I hereby declare that the above-mentioned information is correct up to the best of in believe my knowledge and I bear the responsibility for the correctness of the above-mentioned particulars.
Place:
Date: (Praveen Sharma)