Post Job Free
Sign in

Welding Inspector CSWIP 3.1 Piping, Structure, Pipeline, NDT, Civil

Location:
Indonesia
Posted:
October 25, 2017

Contact this candidate

Resume:

CURRICULUM VITAE

Name : Adi Yuwono

Place, Date of Birth : Klaten, April 15th, 1981

Marital Status : Married, 2 children’s

Address : Perum Kodau V AmbaraPura, Jl.Kelimutu Blok M No.6

Jatimekar, Jatiasih, Bekasi, Jawa Barat Indonesia 17422

Phone : +62-813******** or +62-817*******

E-mail : ****************@*****.*** / ******.*********@*****.***

Seafarer Code : 6201393121BP02112

Passport : A 7391629 Date of expired 17 February 2019

Objective: Use my project leading skills and succeed as Welding Inspector CSWIP 3.1 Piping, Structure, Pipeline, NDT, Mechanical, and Civil

EDUCATION

Bachelor Degree in Dept. of Civil Engineering, Faculty of Engineering. University of Sebelas Maret Surakarta

SMA Negeri 1 Karanganom Klaten

SMP Negeri 3 Klaten

SKILLS

MANAGEMENT Project Management

Quality Control / Welding Inspector / NDT Inspector

Construction

Civil Work

COMPUTER Microsoft Office; Word, Excel, Power Point

LANGUAGES Speak Read Write

Indonesia Excellent Excellent Excellent

English Good Good Good

COURSES & TRAININGS CSWIP 3.1 Welding Inspector

Conducted by TWI Certification Ltd, Granta Park, Great Abington

Cambridge CB21 6AL, UK

Cert No: 56262/2, Expire: 23 May 2021

Welding Inspector Migas Indonesia

Conducted by Shipbuilding Polytechnic - Sepuluh November Institute of Technology, Cert No: 15/K12/WI-XVII/2007

ASNT RT, MT, PT, UT Level 2- SME

Refresh ASNT RT, MT, PT, UT Level 2- MSS

Refresh ASNT RI, MT, PT, UT Level 2- DiTS,

Expired Date December 14, 2020

Cert No: R5096.051 (RI)

Cert No: N5096.031 (MT)

Cert No: R5096.041 (PT)

Cert No: R5096.221 (UT)

Phased Array Data Interpretation (ASNT) – ERR TEHNIK GAWINDO

Certf. No. ETG/II/UT/50033, Exp. Date : 15/10/2022

BOSIET (Consist of Safety Induction, Fire Fighting & Self Rescue, Sea Survival & Life Boat, HUET (Include EBS), First Aid & Hypothermia, Travel Safely by Boat) Exp. Date July 18, 2021

Samson Tiara, Cert No: 12124802

OPITO Cert No: 7134570719071720517

SAFETY AWARENESS

PT. Meindo E I, Cert No: SA-002/024/HSE-OTHERS/HRD/MEI-VI/08

Radiation Safety Training

Total E & P Indonesie, PT. Meindo E.I. & PT. Shahib Sejati

Lifting and Handling Risk on Construction Sites - APAVE

Training Code: 8957 by Patrick ROUGE

Work Safely at Height and Risk Related to Scaffolding - APAVE

Training Code: 8094 by Nicolas GALLAND

ORGANIZATIONAL Head of Event Organizer

JAPA Production, Klaten

Publication Manager

AT Production Event Organizer, Surakarta

Head of Natural Humanity

Jakapala Mahameru, Klaten

PROFESSIONAL

EXPERIENCE

December 2014 –19 April 2017 Oil and Gas, ABI Resources and Services Pte Ltd

On behalf for TOTAL E & P ANGOLA

As Welding & NDT Supervisor

Project: KAOMBO FPSO NORTH & SOUTH BLOCK 32 PROJECTS

Fabrication FPSO Topside Module (Structure, Piping, Mechanical, Electrical, Instrument), Pre-commissioning, Commissioning (Saipem Karimun Yard) and continue to Integrity with Bottom side (Vessel) at Singapore (Smoe Yard)

Supervise & coordination with contractor activity, structure & piping at onshore

Monitor welder qualification

Monitor welding consumable handling

Review material certificates

Mock up candidate of NDT operator prior joint the project

Performed visual inspection

Witness and review NDT report (MT, PT, UT)

Review / interpret Radiography film

Monitor welding repair rate

Review Welding Summary List (WSL) & Dossier

September 2013 – September 2014 Oil and Gas, Java Velosi Mandiri

On behalf for CONOCOPHILLIPS INDONESIA

As QC Inspector (Structure, Piping)

Project: SOUTH BELUT DEVELOPMENT PROJECT (Offshore Installation, Hook Up and Commissioning at NBCPP)

Supervise & coordination with contractor activity (Swiber), structure & piping at offshore

Review certificates for material for conformance with spec.

Review & documentation drawing

Review fit up, visual report & actual spot check

Monitor welding consumable handling. Review original welding consumable material certificates for compliance to codes and specifications where required

Review/check to ensure that procedures for WPS/PQR

Review applicable code/specification

Review dimensional report & spot check actual

Witness / monitor NDT activities, and interpret / review NDT reports on RT, MT, PT and UT

Witness / monitor weld repair activities and welding distortion correction activities

Hydro test, flushing, drying, leak test, PWHT

Review of test pack & dossier (traceability report, NDE Clearance, MVR etc)

October 2012 – August 2013 Oil and Gas, SPIE Oil & Gas Services

On behalf for TOTAL E & P Myanmar (TEPM)

As QC Welding Inspector (Structure, Piping)

Project: YADANA SUBSIDENCE PROJECT EPSC-2 and BROWN FIELD Modification of Platform.

OFFSHORE Installation of new structural Jacket and installation new Living Quarter combine with the existing Living Quarter. Installation of new additional / extension structure, additional Mechanical Equipment, Piping tie in and Piping hook up. Scope of work continue with demolition of existing facilities (Structure, piping, Mechanical equipment, Electrical/ Instrumentation, etc).

• Supervise & coordination with contractor activity, structure & piping at offshore

• Review certificates for material for conformance with spec.

• Review & documentation drawing

• Review fit up, visual report & actual spot check

• Monitor welding consumable handling. Review original welding consumable material certificates for compliance to codes and specifications where required

• Review/check to ensure that procedures for WPS/PQR

• Review applicable code/specification

• Review dimensional report & spot check actual

• Witness / monitor NDT activities, and interpret / review NDT reports on RT, MT, PT and UT

Hydro test, flushing, drying, leak test

• Witness / monitor weld repair activities and welding distortion correction activities

• Review of test pack & dossier (traceability report, NDE Clearance, MVR etc)

October 2011 – August 2012 Oil and Gas, SARKU ENJINERING UTAMA

As QAQC Engineering & Fabrication

Client : PREMIER OIL NATUNA SEA B.V.

Project : Anoa Phase 4 Early Tie-In Spools

Ensure welder qualification

Fit up/ surface preparation check

Review certificate of material and test for conformance with spec.

Review & documentation drawing

Monitor in-process welding parameters like purging and purging level (O2 checking), heat input and maintenance of inter-pass temperature

Review/check to ensure that procedures for WPS/PQR

Visual inspection for quality of workmanship and completeness

Monitor welding consumable handling. Review original welding consumable material certificates for compliance to codes and specifications where required

Dimensional check

Review applicable code/specification

Witness / monitor NDT activities, and interpret / review NDT reports on RT, MT, PT and UT

Witness / monitor weld repair activities and welding distortion correction activities

Witness PWHT of piping works & review PWHT charts

Witness hydro test, flushing & drying, Mechanical Testing

Make sure blasting & painting follow client spec

Preparation of Inspection Release Notes (IRN) etc.

Jan 2010 – September 2011 Oil and Gas, J.RAY McDERMOTT ASIA PACIFIC

As QC Welding Inspector Snr.A – Jacket, Module, FPSO, Living Quarter, Platform, Pipemill, Pilerack,Pipeline

NDT Company : Oceaneering, Lekom Maras, Singgar RTD

1. Client : Chevron Thailand Exploration & Production

Project : Platong Gas II Development Project

2. Client : Esso Australia Resources Pty Ltd

Project : Kipper Tuna Turrum Project

3. Client : Woodside Energy Ltd.

Project : North Rankin Redevelopment Project (NR2)

4. Client : Maersk Contractor

Project : Peregrino FPSO Topside Facilities Project

5. Client : Esso Australia Resources Pty Ltd

Project : Riser Access Tower (RAT)

6. Client : KJVG

Project : Gorgon

Ensure welder qualification

Ensure procedure qualification

Verify correct materials to be weld

Ensure correct consumables and WPS number

Check fit up prior to weld (root gap, root face, alignment, bevel angel etc.)

Check preheat temperature based on approved WPS prior to welding

Receiving and reviewed CIR (Computerized Inspection Request)

Request for PWHT

Follow up and monitor repair if any

Dimensional check

Follow up NDT result then release spool / item for painting or erection

RT, MT, PT, UT and AUT (for welding which using narrow groove)

Visit PCM to review and sign off visual reports

Preparation of Inspection Release Notes (IRN) etc.

March 2009 – June 2009 Oil and Gas, TGI Offshore Pipeline

(Pipeline Repair at KP 110 – KP 133, Kuala Tungkal to Panaran)

Worley Parsons Indonesia (Petrotechindo Utama) As General Inspector-Project Management Consultant/PMC

Main Contractor: Global Offshore Industries

Subcon: Oceaneering, Hallin, Fugro, Weatherford, Furmanite etc

(DSV Sanko Angel, DLB Seminole, DLB Comanche, WB5 Barge)

Monitoring sea bed excavation at the locations for hot tapping

Monitoring concrete removal & coating removal as part of hot tapping preparation on pipes

Assist DLB Comanche lay down of the new 28” pipeline

Review AUT of pipeline

Monitoring ovality, UT wall thickness, straightness

Witness pressure test before hot tapping execution

Monitoring & witness hot tapping installation : 28”x28”(4ea) ; 28”x16”(2ea) Smart Tap ; 28”x 6” (2ea) Flushing Clamp Tap

Monitoring production workmanship task

Control of non conforming items

Monitoring install sand cement bag at free span

Monitoring flooding, cleaning, gauging and caliper survey activity

Witness offshore hydro testing manual

Witness check of dew point & gas content

Monitoring dewatering, degassing of existing buckle pipe, stabilizer spool, bypass spool

Witness Kamos gasket test

February 2008 – February 2009 Oil and Gas, TOTAL E&P INDONESIE, (TP 11 S / EPSC 3 OFFSITES) & (TP 11 N / EPSC 13 OFFSITES)

PT. MEINDO ELANG INDAH, As Senior QA / QC-Inspector-Welding

(Piping, Structure, Pipeline, Mechanical, Civil)

Onshore & Offshore NPU & SPU

Fit up/ surface preparation check

Visual inspection for quality of workmanship and completeness

Dimensional check

Review applicable code/specification

Review & witness Magnetic Particle Inspection,Penetrant Test, Ultrasonic Test

Review & interpreted radiography film

Review certificate for material and test for conformance with spec.

Review & documentation drawing

Review/check to ensure that procedures for WPS/PQR

Conducted Welder Qualification Test

Hot tap

Witness hydro test & leak test

Production test

Pilling installation

Piping installation

Pipeline installation (onshore & offshore)

Civil works

Sep 2007 – Feb 2008 Oil and Gas, TOTAL E&P INDONESIE, (Oily Water Treatment - EPSC1

PT. MEINDO ELANG INDAH, As QA / QC Inspector-Welding

(Piping, Structure, Pipeline, Mechanical, Civil)

Onshore & Offshore CPU

Fit up/ surface preparation check

Visual inspection for quality of workmanship and completeness

Dimensional check

Review applicable code/specification

Review & witness Magnetic Particle Inspection,Penetrant Test, Ultrasonic Test

Review & interpreted radiography film

Review certificate for material and test for conformance with spec.

Review & documentation drawing

Review/check to ensure that procedures for WPS/PQR

Verification WPS

Conducted Welder Qualification Test

Mock up hot tap

Witness hydro test & leak test

Production test

Pilling installation

Piping & Pipeline installation (onshore & offshore) and Civil works

May 2006 – January 2007 Petrochemical, MITSUBISHI CHEMICAL INDONESIA (Daily Maintenance, Gas Transmission & Distribution Project) - Onshore

MITSUBISHI CHEMICAL ENG. INDONESIA, As Civil Supervisor

•.Quality control of civil work

•.Monitoring & inspection to subcontractor of civil / structure work

•.Coordination with piping & mechanical department

•.Build of aeration foundation, blower house, sludge cooling

•.Install precast, install rebar, concreting / casting, wooden formwork, metal formwork

•.Daily report, weekly report,, progress control

•.Prepared Safety Assessments, Minute Of Meeting with Client (MCCI), prepared work permit

•.Maintenance employee housing

•.Using computer program like Microsoft Office, Microsoft Project, Primavera Project Planner, AutoCAD, etc.

March 2005 – May 2006 High rise building, SHIMIZU CORPORATION, Setiabudi Residences Project 26th & 28th floor as Site Engineer –civil work

Monitoring & inspection to subcontractor of structure work, install rebar, install precast slab and beam, metal formwork, wooden formwork, rectify diaphragm wall

Control operation gantry crane

Asago installation

Quality control

Progress control

Prepared Safety Assessments, Minute Of Meeting

Daily report, weekly report

Using computer program like Microsoft Office, Microsoft Project, Primavera Project Planner, AutoCAD etc.

Dec 2004 – Feb 2005 Oil & gas, REKAYASA INDUSTRI, CO2 Removal Subang, Management Project Division as Project Control Assistant (On Job Training)

Making report of schedule, project planning, project control, cost control, resources control, using computer program like Microsoft Office, Microsoft Project, Primavera Project Planner, AutoCAD etc.

REFERENCES

Gusminar, QA QC Manager, PT. Meindo E. I.

Oily Water Treatment - EPSC1

TP 11 N / EPSC 13 OFFSITES

TP 11 S / EPSC 3 OFFSITES

Total E&P Indonesie’s Project

+628*-***-***-*** ********@*****.***

+628*-****-****

Christine Chandra, Project Service Coordinator, Petrotechindo Utama (Worley Parsons Indonesia)

TGI Offshore Pipeline Repair Project

+622*-****-**** ********@******************.***

Murray Wilson, Yard Quality Manager, J.Ray McDermott Asia Pacific Riser Acces Tower (RAT) - Esso Australia

Platong Gas II Development Project (PG II) - Chevron Thailand

Kipper Tuna Turrum Project (KTT2) – Esso Australia

North Rankin Redevelopment Project (NR2) – Woodside Energy Australia

Peregrino FPSO Topside Facilities Project – Maersk Contractor

+65 6668 5729 *******@*********.***

Danang Sanyoto, QAQC Superintendent Total E & P Indonesie

Oily Water Treatment - EPSC1

Total E&P Indonesie’s Project

+628*-***-***-*** *************@*****.***

Arinta Aribowo, Quality Control Manager, Sarku Enjinering Utama

Anoa Phase 4 Early Tie-In Spools

Premier Oil Natuna Sea BV’s Project

+62-81-210*-**** ******@*****-**.***

Asman Madahura, QAQC Superintendent/Leader, Total E & P Myanmar

Yadana Subsidence Project

Total E&P Myanmar’s Project

+65 96250007 ********-**-****.****@*****.***

Arifah Dewinta, Project Assistant, PT. SPIE Oil & Gas Services

Total E&P Myanmar’s Project

+62-021-******** ******.*******@****.***

Fatkhy Baridwan, QAQC Superintendent, ConocoPhillips Indonesia

South Belut Development Project

ConocoPhillips Indonesia’s Project

+62-818-***-*** ******.********@**********.**************.***

Michael Loock, Project Manager, PT. Java Velosi Mandiri

South Belut Development Project

ConocoPhillips Indonesia’s Project

+62-021-******* *******@******.**.**

Dominique Splingart, QAQC Superintendent, Total EP Angola

Kaombo Block 32 Project

Total EP Angola’s Project

+62-077**-******* or +628********** *********.*********@********.*****.***

Bertrand Richard, CSR, Total EP Angola

Kaombo Block 32 Project

Total EP Angola’s Project

+62-077**-******* ********.*******@********.*****.***

Mohamed Elwan, CSR, Total EP Angola

Kaombo Block 32 Project

Total EP Angola’s Project

+62-081*-***-**** *******.*****@*****.***



Contact this candidate