Post Job Free

Resume

Sign in

Power Plant Water Chemistry

Location:
Jangareddigudem, AP, 534447, India
Posted:
October 23, 2017

Contact this candidate

Resume:

CURRICULLUM VITAE

K.SRINIVASU

S/O Bangaraiah,

Near: Z. P. H. School,

Aswaraopet Road,

JANGAREDDYGUDEM.

West Godavari Dist (A.P)

Mobile: +919****-*****, +919********* mail id: ac2vqp@r.postjobfree.com

Carrier Objective:

To associate myself with an institution where there is an opportunity to contribute and update in the field of Water Treatment Plant Chemistry and Environment

Educational Qualifications:

B.Sc (M.P.C) from S.V.K.P& Dr.K.S.Raju Arts & Science College, Andhra University,

PENUGONDA, W.G.Dist. Secured First Division during 1999.

M. Sc (Chemistry) from Kalinga University, Secured First Division during 2005.

M. Tech. (Master Program in Chemical Engg.) from IIMES Bangalore. Secured First division in 2007.

PG Diploma in EHS from Andhra Pradesh Productivity Council. Hyderabad.

Trained as ISO 9001:2008 Internal Auditor from Four-D Consulting Management Pvt. Ltd. Bangalore.

Trained as Laboratory Quality Management and Internal Audit as per ISO/IEC 17025:2005

SKILLS:

TOTAL WATER and WASTE WATER MANAGEMENT like

Operation & Maintenance and erection & commissioning of

Pre-treatment plant (various types)

Sea Water(Desalination) RO Plant (SWRO)

Brackish Water RO Plant (BWRO)

DM Plant

Project execution of all types of WTP/WWTP/STP/ETP

Cooling & Auxiliary(like service, drinking etc.) water chemistry

BOILER water chemistry and also Boiler and Condenser chemical cleaning as per OEM guide lines

COAL Chemistry: (as per ISO/ASTM std. practice)

Sampling and Sample preparation

Proximate Analysis (TM-Total Moisture, IM-Inherent Moisture, Ash, Volatile Matter, Fixed Carbon) with Imported equipment’s

Ultimate Analysis ( Element Analysis- Carbon, Hydrogen, Nitrogen, Sulfur, Oxygen) with Imported equipment’s O&M

Ash Fusibility with Imported equipment’s

HGI-Hard Grooving grind-ability Index

GCV- Gross Calorific Value with Imported equipment’s

Sieve Analysis

Fly Ash and Bed Ash analysis

O&M of TGA (Thermo Gravimetric Analyzer) for Proximate Analysis in Coal, CHNSO (Ultimate Analyzer) Analysis in Coal

Preparation of reports for All types of Quality reports (LP,DP, Inter Laboratory etc. reports)

Moisture Content in Lube Oil by Karl Fisher Coulometer with O&M

Mechanical Impurities in Lube Oil

TAN and BDV (Break Down Voltage) in Lube Oil etc.

Strong Knowledge in

Laboratory setup and enhancement as per O&M requirement

Laboratory Quality Management and Internal Audit as per ISO/IEC 17025:2005

ISO documentation and Internal auditing

SAP activities

SOP’s preparation

Daily and MIS reports generation

Preparation of Departmental Budget as per O&M requirement

Identification and conduct the In house and external trainings to enhance the Water and waste water treatment plant quality of O&M and for team

Chlorine Gas safety and emergency handling

Managing all Environmental aspects like Ambient Air Quality & Stack Flue Gas Monitoring and Analysis i.e.

AAQMS (Ambient Air Quality Monitoring Station)

CEMS (Continuous Emission Monitoring System) in stack flue gas

and Water and Waste Water Monitoring etc. as per PCB norms

Familiar to

MS-Office, Excel, Power Point Present etc.

Worked as Head of WATER and WASTE TREATMENT PLANT for

Project Execution and erection & commissioning and O&M Like

Pre Treatment Plant (PTP)

Gravity Sand Filter (GSF)

Side Stream Filtration (SSF)

Self-Cleaning Filter (SCF)

Ultra Filtration system (UF)

Desalination/Sea Water RO Plant (SWRO)

Brackish Water RO Plant (BWRO)

De Mineralization Plants

High Rated Solid Contact Clarifier for WWTP

WTP & WWTP RO&UF Plant

Electro Chlorination Plant

Liquid and Gas Chlorination Plant etc. in the following Thermal Power Plants

Familiar to operate all the above systems through PLC SCADA and in Manual mode operation

M/s. Simhapuri Energy Ltd. (4x150(600) MW Sea Coastal Thermal Power Plant)

Capacity:

PT Plant : 134400 cubic meter per day

GSF : 124800 cubic meter per day

SWRO Plant : 4800 cubic meter per day (Permeate)

BWRO Plant : 2700 cubic meter per day (Permeate)

Electro Chlorination system : 2x7.5 M3/hr. of 1500 PPM of Sodium Hypo Chlorite

Gas Chlorination system : 4x10 kg/hr. of 2000PPM of Liquid Chlorine Di-Oxide

STP : 250 Kilo Liters per day

M/s. Anrak Aluminium Ltd. (3x75(225) MW Coal based Thermal Power Plant)

Capacity:

PT Plant : 50400 cubic meter per day

WTP-RO Plant : 6012 cubic meter per day (Permeate)

WWTP-RO Plant : 2349 cubic meter per day (Permeate)

Ultra Filtration : 13312 cubic meter per day (Permeate)

SCF : 15372 cubic meter per day

HRSCC : 3000 cubic meter per day

SSF : 54000 cubic meter per day

M/s. Rain Calcining Ltd. (53.5 MW Sea Coastal Thermal Power Plant)

Capacity:

PT Plant : 3000 cubic meter per day

SWRO Plant : 600 cubic meter per day (Permeate)

BWRO Plant : 510 cubic meter per day (Permeate)

M/s. Sri Luxmi Tulasi Agro Paper (P)Ltd. (16 MW Coal based Thermal Power)

Capacity:

PT Plant : 1560 cubic meter per day

WTP-RO Plant : 300 cubic meter per day (Permeate)

Playing Roles and Responsibilities:

I am working as Manager (Managing with 17 no’s Chemists+38 no’s of Out sourcing Manpower)

To avoid the unnecessary Breakdowns & Provide the preventive solutions / Regulate for Healthy O&M of Various types of Water Treatment Plants (WTP) Chemistry & Environment.

Managing dept. overall activities of RO Plant, DM Plant and Laboratory for Quality and quantity.

Make and prepare through enhancement of Water Treatment plant by preparing Daily, Monthly and Yearly O&M planning without any deviation of standard/design quality on regular practice with quality and quantity

Minimization of chemicals consumption and Increasing plant availability

Erection & commissioning and O&M activities of Water and waste water treatment plant

Managing Smooth and Scheduled Operation, Maintenance/Calibration by closed monitoring of WTP and Chemical Lab. Instruments respectively.

Planning, coordinate and supervise all the activities related with the treatment plant, Power plant water and Coal chemistry i.e., Water Analysis and chemical treatment and maintaining its parameters etc.

Maintaining all safety norms are followed while operation of various treatment plants.

Quality of O&M status of WTP and preventive maintenance of WTP, chemicals and also for solutions in regular practice.

Monitoring of various operational parameters of treatment plants and respond to any deviations or abnormalities

Uninterrupted Supply of quality based Clarified/Service Water, Potable Water & DM Water.

Inspect and Analyzing samples from various plants like River & Sea Water and DM Water Treatment Plants, Chlorine Plant, bulk chemicals/consumables for water treatments, Coal handling & other areas as directed

Identification and conduct the In house and external trainings to enhance the Power Plant chemistry & team and also related O&M team to run the R.O. & D.M. Plant efficiently

Boiler and Condenser chemical cleaning as per OEM guide lines

Electro chlorination and Chlorine dioxide plant O&M

Chlorine Gas safety and emergency handling

Any other works assigned by the management from time to time.

Responsible for Joint Witnessing of Coal sampling, Sample preparation for Total Moisture, Sizing, Ultimate and Proximate analysis of Coal vessel, Local purchased Coal and Boiler Feed coal

Supervision for Boiler crushed Coal, Bed Ash and Fly Ash sampling and for Boiler Bed Material Sizing and Density Analysis

Reports generation and submitting the status of various Coal Analysis to HOD/Operation Head

Coal Analytical equipment’s operation for Proximate, Ultimate, Sizing and HGI analysis

Lab set up, Operation and in house calibration for

Coal and Water analysis of well Equipped & Sophisticated Instruments

like Silica Analyzers, Spectrophotometers, PH & Cond meters, CHNS, Bomb Calorimeter & T.G.A. etc.

Getting the status of required materials & follow-up.

Submitting and preparing of monthly, half yearly and yearly reports to HOD/Operation Head

Preparing yearly budget and maintaining total chemical inventory.

Preparation of SOPs & Log Sheets for Water, Coal, Oil Analysis & Environment monitoring

Regulate/ prevention by preparing Daily, Monthly and Yearly reports for consumables and also for future developments.

SAP activities for

PR requisition, Approvals, Material Issue, Defect register etc.

Documentation and Internal auditing as per ISO 9001:2008

Departmental Budget, MIS etc. preparation

Monitoring of Boiler chemical preservation as per requirement

Monitoring of Chlorine Dioxide plant

Managing all Environmental aspects like Ambient Air Quality & Stack Flue Gas Monitoring and Analysis

Skill set summery for SWRO Plant:

Decision support system (DSS) for SWRO plant

Importance of scheduling membrane maintenance activities

Membrane fouling monitoring and its impact on membrane chemical cleaning schedules, and optimization of RO process is important

Determined optimal membrane maintenance schedules without considering the membrane life cycle into optimization problem formulation

DSS for SWRO calculates the optimal membrane maintenance schedules

By minimizing water production cost over membrane life time

Also helps in minimizing the specific energy consumption (SEC) of the plant by optimally distributing the production load among RO trains.

The proposed DSS consists of several functionalities, namely, scheduler, load distributor, membrane management system and simulator.

Asset management of SWRO plant

Membranes, Pumps, ERD’s, Pretreatment filters etc

Advance operation of SWRO plant

Energy optimization (operation of RO/UF/MF membranes, Pumps, ERD’s, filters etc.)

Maintenance schedule optimization (membranes, pumps)

Solution for O&M of SWRO plant

Optimize Membrane Performance

DSS for O&M of SWRO plant

Challenges in O&M of SWRO plant:

Scheduler:

Provides optimal schedule for membrane maintenance activities

When the membrane are to be cleaned and replaced

How much % of membranes are to be replaced

Load distributor:

Provides optimal production load distribution between RO trains

Optimal production load distribution minimizes overall specific energy consumption

Membrane Management System (MMS):

Provides operational and maintenance history

Displays process violations via alarms

Conditions for process violations can be provided by means of rules

Simulator:

Facilitates to validate what - if scenarios

How energy consumption changes with process variables

How production cost changes with membrane maintenance activities

Oversee the treatment, distribution and daily operations of water treatment facilities.

Supervise teams of operators, institute plant policies and procedures, direct training programs and complete employee performance reviews.

Ensure that the plant and its operators comply with state health standards by regularly testing the water supply and keeping meticulous records.

Also responsible for maintaining a safe work environment and ensuring all equipment is in proper working condition.

Professional Experience:

01.Presently working as Manager-Chemistry (WTP & WWTP, Chemical & Environment-Lab) in M/s Simhapuri Energy Ltd. 4x150 MW Sea Coastal Thermal Power Plant. Nellore Dt. Since May.2013.

02.I had worked as Sr. Chemist-HOD (Dy. Manager) (Water Management-Lab, WTP & WWTP) in M/s Anrak Aluminium Ltd. Visakhapatnam. 225 MW Captive Thermal Power Plant. Vizag Dt. From Nov.2011 to May.2013.

03.I had worked as Chief Chemist (Water Management-Lab & R.O Plant) in M/s Sri Luxmi Tulasi Agro Paper (P)Ltd. 16MW Coal Based Power Plant. Aswaraopet. Khammam Dt. From July 2006 to Oct.2011.

04.I had worked as Chemist in M/s Rain Calcining Ltd., Visakhapatnam. 53.5 MW Thermal Power Plant, from April 2003 to June 2006.

05.I had worked as Lab Analyst in M/s The Andhra Sugars Ltd., Taduvai W.G.Dt. 8MW Co-generation Power plant from December 1999 to April 2003

PERSONAL INFORMATION

Date of Birth : 16.02.1979

Marital Status : Married

Languages Known : English, Telugu and Hindi

Passport no & Validity : L9836610 & 25.06.2024

Familiar : Windows, MS Office, Power Point Presentation etc.

I request you to kindly consider my application favorable and give me a change to serve in your Esteemed Organization. I assure you, that I shall discharge to the entire satisfaction of my superiors.

Thanking you sir,

Date: Yours Faithfully,

Place: (K.SRINIVASU)



Contact this candidate