Post Job Free

Resume

Sign in

Supply Chain Plant

Location:
Cedar Grove, WI, 53013
Posted:
October 22, 2017

Contact this candidate

Resume:

Jamie Davister

920-***-****

ac2v1o@r.postjobfree.com

*** ****** ***

Random Lake, WI

Objective

To further utilize the skills and knowledge I have gained throughout my educational and professional career while gaining valuable experience in a challenging supply chain role.

Education

University of Wisconsin-Milwaukee

Bachelors Degree in Supply Chain and Operations Management - May 2007; GPA: 3.4/4.0

Masters of Business Administration (MBA) - May 2011; GPA 3.3/4.0

CPIM (Certified in Production and Inventory Management) - December 2005, Recertified 2010 & 2015

CSCP (Certified Supply Chain Professional) - July 2011, Recertified 2016

Proficient in: Lotus Notes, SAP, BPCKS, PIMS, Microsoft Excel, Word, Power Point, Outlook

Work Experience

Rockwell Automation Mequon, WI

Master Production Scheduler 6/2012 - 9/2017

Use excel and SAP based tools to maintain the master production schedule by level loading, modifying forecasts and the adjusting the overall load on the entire Mequon plant.

Partner with Production Control Analysts, Materials Analysts and Demand Management to effectively manage $40 million in raw material and $4-5 million in stocked finished good inventory.

Work with transfer teams to move several production lines to and from the Mequon facility.

Coordinate the annual physical inventory activities for the entire Mequon plant.

Rockline Industries Sheboygan, WI

Buyer/Planner 1/2012 - 6/2012

Manage the suppliers for assigned commodities to prevent material shortages while minimizing the on hand inventory through daily discussions with vendors.

Team up with the commodity managers to perform vendor evaluations and discuss finding with vendors bi-annually. Implementing performance improvement plans when required.

Meeting daily with the Master Production Scheduler to ensure raw materials arrive when required to meet the plan. Expedite materials or modify the production plan as needed.

Rockwell Automation Ladysmith, WI

Master Production Scheduler 12/2010 - 12/2011

Work with Production Control Analysts and Production Supervisors to achieve an on-time order compliance KPI of 95% while reducing the overall plant and distribution center inventory levels.

Monitor all of the finished good forecasts associated with each internal product line to ensure they are within 3% of the actual order intake without significantly impacting the supply chain.

Track the overall plant and departmental metrics while reporting them to senior management and starting improvement projects when metrics indicate they are needed.

Review safety stocks, lot sizes and other planning parameters at our distribution center for all Ladysmith produced finished goods. Approximately $4 million in stocked inventory.

Rockwell Automation Ladysmith, WI

Production Control Analyst 8/2009 - 12/2010

Schedule and maintain production for assembly and fabrication areas within the plant.

Collaborate with suppliers and all functional areas within the plant (i.e. engineering, quality, supervision and management) to solve problems and support operations.

Communicate expected ship dates and production delays to sales, managers and customers.

Monitor material lot size, safety stocks and re-order points to minimize short material while also minimizing inventory values.

Milwaukee Machine Works Milwaukee, WI

Buyer/Planner 9/2006 - 6/2009

Coordinate the flow of materials from suppliers, through the plant, to customers.

Work with suppliers, the quality department, the engineering department and supervisors on various issues that arise.

Communicate with customers to service any questions or needs they may have.

Oversee and manage all of the logistics functions within the company.



Contact this candidate