Post Job Free

Resume

Sign in

Power Plant Safety

Location:
City of Balanga, Central Luzon, Philippines
Salary:
25000.00
Posted:
October 20, 2017

Contact this candidate

Resume:

JOVIN PARRERA VINZON

Dasmariñas St. Doña Maria Subd., Tenejero, Balanga City, Bataan, 2100

Mobile no.: +639*********

Telephone no.: (047-***-****

Email: ac2u26@r.postjobfree.com

• Capable of adopting easily to a new environment and maintain critical thinking skills essential to providing competent safety procedures.

• Seeking a career within a company wherein I could improve my skills and knowledge regarding safety and be a proficient contributor of the organization in its venture to safety and success. Tertiary

Course: Bachelor of Science in Nursing June 2006 – March 2010 Bataan Peninsula State University – Balanga Campus Don Manuel Banzon Ave., PoblacionBalanga City, Bataan Secondary

Tomas Del Rosario College June 2002 – April 2006

Capitol Drive,San Jose Balanga City, Bataan

Primary

Tomas Pinpin Memorial Elementary School June 1996 – April 2002 Abucay, Bataan

Power Zaver Techno Services Corporation

Tongonan Geothermal Power Plant June 13, 2017 – July 13, 2017 Leyte

HSE Officer

Unit 3

- Turbine Retrofitting Works

- Generator Rewinding Works

Tongonan Geothermal Power Plant April 29, 2017 – June 7, 2017 Leyte

HSE Officer

Unit 2

- Turbine Retrofitting Works

- Generator Rewinding Works

Petron Bataan Refinery March 15, 2017 – April 27, 2017 Limay, Bataan

HSE Officer

- Overhauling of C-550 hydraulic pump and C-700 Turbine Prod A Block.

- Replacement of Boiler tubes and Pad welding Activities.

- Repair/Replacement of Boiler tubes.

OBJECTIVES

EDUCATIONAL BACKGROUND

RELEVANT EXPERIENCE

Cebu Energy Development Corporation February 3, 2017 – March 12, 2017 Toledo City, Cebu

HSE Officer

Unit 3

- Overhaul Inspection/Repair of Main Turbine, Bearings and Valves. Aboitiz Davao Light December 12, 2016 – February 01, 2017 Davao City

HSE Officer

- Inspection and Replacement of Furnace nozzles.

- Repair/Replacement of Boiler Tubes.

Tongonan Geothermal Power Plant October 2016 – December 2016 Leyte

HSE Officer

Unit 1

- Turbine Retrofitting works.

- Generator Rewinding Works.

Mauban Quezon Power Plant November 06, 2016 – December 10, 2016 Mauban Quezon

HSE Officer

- Overhaul & Maintenance of PAF A&B, FDF A&B and IDF A&B.

- Inspection & Repair of Submerged Drag Chain (SDC).

- Inspection & Repair of SDC moving parts.

Team Energy Sual Power Station August 2016 – November 04, 2016 Sual, Pangasinan

HSE Officer

ANNUAL OUTAGE 2016

Unit 2

- Major Overhaul of LP1/LP2 Turbine Cylinders, Main Generator/Exciter, Bearings #1 to #9 & Thrust Bearing & Auxiliaries.

- Annual Preventive Maintenance of Boiler Burner Assemblies / Fans and Dampers.

- Coal Mills A&B & Auxiliaries Annual Preventive Maintenance Servicing.

- pulveriser Coal Mills C&B Annual Preventive Maintenance Servicing.

- Cleaning of Intermediate, Cold-end and Cleaning & Replacement of Hot-end Baskets of Airpreheaters A&B.

- Air Heater A&B Basket Annual Inspection, Cleaning & Repair of Hot, Intermediate and Cold-end Baskets.

- Inspection /Overhaul of U2 KSB Boiler Circulating Pump / Motor C.

- Repair works at Submerged Scraper Conveyor (SSC).

- Installation of Scaffoldings at Boiler Furnace.

- Inspection & Repair of CW Travelling Bandscreen A/B (02-CFI-FLTD-501/551).

- Tube Cleaning of Condenser A&B by Bullet Shot Method.

- Rehabilitation of Eroded Coal Mill D Hot & Cold Air Duct. Unit 1

- Major Overhaul of LP1/LP2 Turbine Cylinders, Main Generator/Exciter, Bearings #1 to #9 & Thrust Bearing & Auxiliaries.

- Annual Preventive Maintenance of Boiler Burner Assemblies / Fans and Dampers.

- Coal Mills A&B & Auxiliaries Annual Preventive Maintenance Servicing.

- pulveriser Coal Mills C&B Annual Preventive Maintenance Servicing.

- Cleaning of Intermediate, Cold-end and Cleaning & Replacement of Hot-end Baskets of Airpreheaters A&B.

- Air Heater A&B Basket Annual Inspection, Cleaning & Repair of Hot, Intermediate and Cold-end Baskets.

- Inspection /Overhaul of U2 KSB Boiler Circulating Pump / Motor C.

- Repair works at Submerged Scraper Conveyor (SSC).

- Installation of Scaffoldings at Boiler Furnace.

- Inspection & Repair of CW Travelling Bandscreen A/B (02-CFI-FLTD-501/551).

- Tube Cleaning of Condenser A&B by Bullet Shot Method.

- Rehabilitation of Eroded Coal Mill D Hot & Cold Air Duct. Team Energy Pagbilao Power Plant April 26, 2016 – July 31, 2016 Pagbilao, Quezon

HSE Officer

ANNUAL OUTAGE 2016

Unit 2

- 442 MVA Westinghouse Generator.

- Inspection and Repair of Fans Internal (FDF, PAF & IDF) including Alignment.

- Preventive Inspection & Repair/Replacement of BFP-T & M-BFP parts needed to be replaced.

- Overhauling Inspection and Repair of Main Turbine HP-IP and LP Cylinder.

- Overhauling Inspection of, Cleaning and Repair of BCWBP A& B / BCWBP Suction Strainers and BCWBP A/B Inlet & Outlet Piping & its cooler piping.

- Overhauling Inspection of, Cleaning and Repair of BCWBP A & B / BCWBP Suction Strainers and BCWBP A/B Inlet & Outlet Piping.

- Installation and Removal of Scaffoldings at Boiler Furnace SH & RH Tubes paints and Economizer Area.

- Overhauling Inspection of Main Turbine RSV and ICV including its servomotors / Overhauling Inspection of Main Turbine GV and MSV including its servomotors. Unit 1

- 442 MVA Westinghouse Generator.

- Inspection and Repair of Fans Internal (FDF, PAF & IDF) including Alignment.

- Preventive Inspection & Repair/Replacement of BFP-T & M-BFP parts needed to be replaced.

- Overhauling Inspection and Repair of Main Turbine HP-IP and LP Cylinder.

- Overhauling Inspection of, Cleaning and Repair of BCWBP A& B / BCWBP Suction Strainers and BCWBP A/B Inlet & Outlet Piping & its cooler piping.

- Overhauling Inspection of, Cleaning and Repair of BCWBP A & B / BCWBP Suction Strainers and BCWBP A/B Inlet & Outlet Piping.

- Installation and Removal of Scaffoldings at Boiler Furnace SH & RH Tubes paints and Economizer Area.

- Overhauling Inspection of Main Turbine RSV and ICV including its servomotors / Overhauling Inspection of Main Turbine GV and MSV including its servomotors. Cebu Energy Development Corporation April 12, 2016 – April 22, 2016

(Global Business Power Corporation)

Toledo City, Cebu

HSE Officer

Unit 3

- Repair/Replacement of Boiler Tubes.

March 11, 2016 – March 30, 2016

Unit 1

- Repair/Replacement of Boiler Tubes.

Panay Energy Development Corporation February 11, 2016 – March 08, 2016

(Global Business Power Corporation)

Lapaz, Iloilo City, 5000 Iloilo

HSE Officer

- Overhauling Inspection & Repair of Generator.

- Overhauling Inspection & Repair of Main Turbine.

- Overhauling Inspection & Repair of Boiler Tubes. Cebu Energy Development Corporation January 27, 2016 – February 09, 2016

(Global Business Power Corporation)

Toledo City, Cebu

HSE Officer

Unit 2

- Repair/Replacement of Boiler Tubes and Guide Nozzles. Panay Energy Development Corporation January 16, 2016 – January 26, 2016

(Global Business Power Corporation)

Lapaz, Iloilo City, 5000 Iloilo

HSE Officer

Unit 2

- Overhauling/ Replacement of Furnace thin or damaged tube and Super heater tubes. United Pulp & Paper Company December 04, 2015 – December 24, 2015 Calumpit, Bulacan

HSE Officer

- Inspection, Removal & Replacement of Main Turbine HP-IP and LP Cylinders.

- Overhauling Inspection & Repair of Boiler Tubes. Asia Pacific Energy Corporation November 26, 2015 – December 03, 2015 Mabalacat, Pampanga

HSE Officer

- Replacement of 8pcs. Expansion Bellow.

- Repair & Replacement of Boiler tubes.

Team Energy Sual Power Station August 06, 2015 – November 15, 2015 Sual, Pangasinan

HSE Officer

ANNUAL OUTAGE 2015

Unit 2

- Annual Preventive Maintenance of Boiler Burner Assemblies / Fans and Dampers.

- Coal Mills A&B & Auxiliaries Annual Preventive Maintenance Servicing.

- Coal Mills C&D & Auxiliaries Annual Preventive Maintenance Servicing.

- Cleaning of Intermediate, Cold-end and Cleaning & Replacement of Hot-end Baskets of Airpreheaters A&B.

- Pulveriser Coal Mills C&B Annual Preventive Maintenance Servicing.

- Inspection /Overhaul of U2 KSB Boiler Circulating Pump / Motor C.

- Major Overhaul of LP1/LP2 Turbine Cylinders, Main Generator/Exciter, Bearings #1 to #9 & Thrust Bearing & Auxiliaries.

- Repair works at Submerged Scraper Conveyor (SSC).

- Installation of Scaffoldings at Boiler Furnace.

- Inspection & Repair of CW Travelling Bandscreen A/B (02-CFI-FLTD-501/551).

- Tube Cleaning of Condenser A&B by Bullet Shot Method. Unit 1

- Annual Preventive Maintenance of Boiler Burner Assemblies / Fans and Dampers.

- Coal Mills B&C & Auxiliaries Annual Preventive Maintenance Servicing.

- Coal Mills A&D & Auxiliaries Annual Preventive Maintenance Servicing.

- Cleaning of Intermediate, Cold-end and Cleaning & Replacement of Hot-end Baskets of Airpreheaters A&B.

- Pulveriser Coal Mills C&B Annual Preventive Maintenance Servicing.

- Inspection /Overhaul of U2 KSB Boiler Circulating Pump / Motor C.

- Major Overhaul of LP1/LP2 Turbine Cylinders, Main Generator/Exciter, Bearings #1 to #9 & Thrust Bearing & Auxiliaries.

- Repair works at Submerged Scraper Conveyor (SSC).

- Installation of Scaffoldings at Boiler Furnace.

- Inspection & Repair of CW Travelling Bandscreen A/B (02-CFI-FLTD-501/551.

- Tube Cleaning of Condenser A&B by Bullet Shot Method.

-

Team Energy Pagbilao Power Plant June 2015 –August 2015 Pagbilao, Quezon

HSE Officer

ANNUAL OUTAGE 2015

Unit 2

- Preventive Inspection & Repair/Replacement of BFP-T & M-BFP parts needed to be replaced.

- Overhauling Inspection of, Cleaning and Repair of BCWBP A & B / BCWBP Suction Strainers and BCWBP A/B Inlet & Outlet Piping.

- Overhauling Inspection of Main Turbine RSV and ICV including its servomotors / Overhauling Inspection of Main Turbine GV and MSV including its servomotors.

- Installation and Removal of Scaffoldings at Boiler Furnace SH & RH Tubes paints and Economizer Area.

- Inspection and Repair of Fans Internal (FDF, PAF & IDF) including Alignment.

- Inspection /Repair Burner, Wind box and Damper.

Unit 1

- Preventive Inspection & Repair/Replacement of BFP-T & M-BFP parts needed to be replaced.

- Overhauling Inspection of, Cleaning and Repair of BCWBP A & B / BCWBP Suction Strainers and BCWBP A/B Inlet & Outlet Piping.

- Overhauling Inspection of Main Turbine RSV and ICV including its servomotors / Overhauling Inspection of Main Turbine GV and MSV including its servomotors.

- Installation and Removal of Scaffoldings at Boiler Furnace SH & RH Tubes Paints and Economizer Area.

- Inspection and Repair of Fans Internal (FDF, PAF & IDF) including Alignment.

- Inspection /Repair Burner, Wind box and Damper.

- 442 MVA Westinghouse Generator.

GNPowerMariveles Coal Plant LTD. Company January 2015 – March 2015 Mariveles, Bataan

HSE Officer

POWER PLANT OUTAGE 2015

Unit 1

- Generator Inspection / Turbine Bearing 1 & 4 Thrust Bearing Inspection.

- BFPT Driven A & B, Main Pump& Booster Pump Inspection.

- Internal Inspection of HP Heaters 1, 2 & 3 / Unit 1 HP Heater Valve.

- Inspection of LP Turbine.

- LP Turbine Inspection.

- Inspection/Repair of Bag House.

- Turbine Deck (HP Heater #1) Inspection and Repair of Heater #1. Unit 2

- Steam Turbine Bearing 1 & 4 Thrust Inspection / Generator Inspection.

- Generator Pull-out.

- Inspection/Repair of Bag House.

AES Masinloc Coal Power Plant December 3, 2014 – December 20, 2014 Masinloc,Zambales

HSE Officer

Unit 1

- Overhauling of Air Heater 1A & 1B Seals Replacement.

- Inspection/Repair Burner, Wind Box & Dampers.

- Boiler Circulating Pup Motor 2B Repair.

Unit 2

- LP Turbine Overhaul /LP Turbine Re-blading.

Team Energy Sual Power Station September 9, 2014 – December 1, 2014 Sual, Pangasinan

HSE Officer

ANNUAL OUTAGE 2014

Unit 2

- Annual Preventive Maintenance of Boiler Burner Assemblies / Fans and Dampers.

- Coal Mills A&B & Auxiliaries Annual Preventive Maintenance Servicing.

- Coal Mills C&D & Auxiliaries Annual Preventive Maintenance Servicing.

- Cleaning of Intermediate, Cold-end and Cleaning & Replacement of Hot-end Baskets of Air Preheaters A&B.

- pulveriser Coal Mills C&B Annual Preventive Maintenance Servicing.

- Inspection /Overhaul of U2 KSB Boiler Circulating Pump / Motor C.

- Major Overhaul of LP1/LP2 Turbine Cylinders, Main Generator/Exciter, Bearings #1 to #9 & Thrust Bearing & Auxiliaries.

- Repair works at Submerged Scraper Conveyor (SSC).

- Installation of Scaffoldings at Boiler Furnace.

- Inspection & Repair of CW Travelling Bandscreen A/B (02-CFI-FLTD-501/551).

- Tube Cleaning of Condenser A&B by Bullet Shot Method. Unit 1

- Annual Preventive Maintenance of Boiler Burner Assemblies / Fans and Dampers.

- Coal Mills B&C & Auxiliaries Annual Preventive Maintenance Servicing.

- Coal Mills A&D & Auxiliaries Annual Preventive Maintenance Servicing.

- Cleaning of Intermediate, Cold-end and Cleaning & Replacement of Hot-end Baskets of Air preheaters A&B.

- Pulverisers Coal Mills C&B Annual Preventive Maintenance Servicing.

- Inspection /Overhaul of U2 KSB Boiler Circulating Pump / Motor C.

- Major Overhaul of LP1/LP2 Turbine Cylinders, Main Generator/Exciter, Bearings #1 to #9 & Thrust Bearing & Auxiliaries.

- Repair works at Submerged Scraper Conveyor (SSC).

- Installation of Scaffoldings at Boiler Furnace.

- Inspection & Repair of CW Travelling Band screen A/B (02-CFI-FLTD-501/551).

- Tube Cleaning of Condenser A&B by Bullet Shot Method. AES Masinloc Coal Power Plant June 15, 2014 – August 28, 2014 Masinloc, Zambales

HSE Officer

ANNUAL OUTAGE 2014

Unit 1

- Air Heater 2A& 2B Hot and Cold-end Baskets & Seal Replacement.

- Air Heater 1A & 1B Installation of Sector Plates Assembly, Healing Elements (Filter Basket), Seal Assembly & Static Seal for Cold-end Sector Plates.

- Burner Inspection & Repair and Wind Box linkages Inspection & Repair.

- Overhauling of Air Heater 1A & 1B Seals Replacement.

- Inspection/Repair Burner, Wind Box & Dampers.

- Boiler Circulating Pup Motor 2B Repair.

- LP Turbine Overhaul /LP Turbine Re-blading.

Unit 2

- Major Inspection of HP-LP Turbine.

- Burner Inspection & Repair and Wind Box linkages Inspection & Repair.

- Overhauling of Air Heater 1A & 1B Seals Replacement. Chicago Bridge and Iron Company (CBI)September 2013 -April 2014 Jr. HSE Officer – CBI (Philippines) Inc. JGC,

Simlong, Batangas

Duties and responsibilities of position include:

• Plan and coordinate the training and certification of personnel for safety.

• Working with project personnel, resolve safety problems which require safety expertise.

• Maintain and control all safety oriented documentation.

• Ensure that all site activities adhere to federal, state and local rules and regulations.

• Establish and maintain good working relations with the customers.

• Conduct Toolbox Meeting Daily

• Checking of Permits and Job Safety Analysis if it is complete before start of any work.

• Keep records of safety meeting.

• Conduct daily routine inspection at site (e.g.. inspection of all scaffold, ladders, shackle, slings, rigging tools or materials, etc..)

• Monitor all workers if they wear complete Personal Protective Equipment especially those who are hooked their harness to the safety line to avoid any Falling Hazards.

• Ensure the health of the workers is in good condition while at job site.

• Make daily reports regarding safety on job site.

• Implement better housekeeping at job site.

BUMJIN Philippines Construction Inc. November 2012 - April 2013 HSE Officer – Petron Bataan Refinery

Limay,Bataan

Assignments have included:

• Package D Project

• Petron Bataan Refinery

Duties and responsibilities of position include:

• Conduct daily routine inspection at site.

• Make daily reports regarding safety on job site.

• Keep records of safety meeting.

• Monitor all workers if they wear complete Personal Protective Equipment.

• Make weekly reports regarding safety on job site.

• Ensure the health of the workers is in good condition while at job site.

• Implement better housekeeping at job site.

Chicago Bridge and Iron Company (CBI) September 2011 -June 2012 HSE Officer – Petron Bataan Refinery

Limay, Bataan

Assignments have included:

• Additional Pressurized Storage Facility

• Petron Bataan Refinery Limay Bataan

Duties and responsibilities of position include:

• Plan and coordinate the training and certification of personnel for safety.

• Working with project personnel, resolve safety problems which require safety expertise.

• Maintain and control all safety oriented documentation.

• Ensure that all site activities adhere to federal, state and local rules and regulations.

• Establish and maintain good working relations with the customers.

• Conduct Toolbox Meeting Daily

• Checking of Permits and Job Safety Analysis if it is complete before start of any work.

• Keep records of safety meeting.

• Conduct daily routine inspection at site (e.g.. inspection of all scaffold, ladders, shackle, slings, rigging tools or materials, etc..)

• Monitor all workers if they wear complete Personal Protective Equipment especially those who are hooked their harness to the safety line to avoid any Falling Hazards.

• Ensure the health of the workers is in good condition while at job site.

• Make daily reports regarding safety on job site.

• Implement better housekeeping at job site.

Deputized Safety Officer Training

Held in Sual Power Station, PangascasanSual, Pangasinan August 27 – 28, 2014

Mobile Crane Safety Training Program

Conducted at CBI Training Center, San PascualBatangas City First Aid Training (Philippine Red Cross)

Conducted at CBI Training Center, San PascualBatangas City Basic Life Support (Philippine Red Cross)

Conducted at CBI Training Center, San PascualBatangas City Supervisor’s Incident Prevention Program (SIPP)

HSE Training for Supervisor

Conducted at CBI Training Center, San PascualBatangas City Construction Occupational Safety and Health

Conducted at Daelim Training Center, Petron RMP2 Project Site, Limay, Bataan March 9, 10, 16 and 17, 2013

Confined Space Training Course

Conducted at Daelim Training Center, Petron RMP2 Project Site, Limay, Bataan February 28, 2013

Basic Occupational Safety and Health for Construction site Safety Officers Multi-Purpose Hall, Limay, Bataan

August 08 – August 12, 2011

Can use both English and Filipino languages.

Well organized and with strong work ethics.

Positive attitude with good communication skills.

Optimistic with a willingness to learn.

Direct care of patient.

Computer Literature (Windows Environment).

TRAININGS AND SEMINARS

COMPETENCIES

Date of Birth

Age

Place of Birth

Height

Weight

Gender

Civil Status

Nationality

Religion

Father’s Name

Mother’s Name

Dexter E.Nuñez

EHSSupervisor, World Safety Organization

090********

Simonette M. Olarte

Sr. HSE Supervisor, CBI Philippines Inc.

099********

Engr. Eligio B. Vinzon

Chemical Engr, Petron Bataan Refinery, Limay Bataan 092********

Geoffrey D. Vergara

Administration Superintendent,

099********

I hereby certify that the information stated above is true and correct to the best of my knowledge and belief.

PERSONAL PROFILE

CHARACTER REFERENCES

: May 18, 1990

: 27

: Balanga City, Bataan

: 6’1

: 184lbs

: Male

: Single

: Filipino

: Roman Catholic

: Joseph P. Vinzon

: Lea P. Vinzon

Nuñez

EHSSupervisor, World Safety Organization

Simonette M. Olarte

Sr. HSE Supervisor, CBI Philippines Inc.

Engr. Eligio B. Vinzon

Chemical Engr, Petron Bataan Refinery, Limay Bataan Vergara

Administration Superintendent, Power Zaver Techno. Services Corp. I hereby certify that the information stated above is true and correct to the best of my knowledge and CHARACTER REFERENCES

Chemical Engr, Petron Bataan Refinery, Limay Bataan Power Zaver Techno. Services Corp.

I hereby certify that the information stated above is true and correct to the best of my knowledge and



Contact this candidate