Himanshu Swami (Cell) 646-***-**** *****************@*****.***
http://www.linkedin.com/in/himanshuswami6079
SUMMARY
Experienced Executive with a demonstrated history of working in Design, Manufacturing and Industrial Field. 6+ Years of Experience working with Oil & Gas, Automobile and Lighting Fixture Manufacturing industry. Strong Team Management, Multitasking, Project Planning-Scheduling and Project Management Skills. Business development professional with Mechanical Engineering Degree 4 Years Program.
Skill Set:
Experience with Multiple CAD Software
PDM, PLM, ERP
2D Drawing, GD&T - ASME Y14.5-2009
Blueprint generation and reading
Assembly welding detail drawing
Concept design, Validation and Release
BOM Generation, Validation & Release
Electro-Mechanical Assembly
Reverse Engineering, Prototype
KAIZEN, KANBAN, 5S, SMED
ABC Input Data Analysis
HIGH Mix - LOW Volume
Team Building and Management
Working with multiple stakeholders
Lean manufacturing, OEE
Waste reduction techniques
Time & Work Management
Value Engineering
Gap Analysis, Data Analysis
As-Is Analysis, VA-NVA Analysis
Statistical Process Control
Strong Communication and
Interpersonal skills
Strong Multitasking skills
Experience with Mfg. processes
Visio, Excel, PowerPoint, Word
EDUCATION
The Maharaja Sayajirao University of Vadodara, India June ’07 - June ‘11 Bachelor of Engineering in Mechanical Engineering
EXPERIENCE
1.) Full-Time Employer: Larsen And Toubro Technology Services Ltd April ’14 – Present
Consultant at Focal Point Lights, Chicago, IL July ’17 – Present Manufacturing Design and Industrial Engineer
Managing High Mix-Low volume production line, Day to day Trouble-shooting on line, Root cause analysis
Training Team members, Operators and Supervisors, Experience with Plastic laser cutting machine, 3D Printing
Planning for ABC Data Analysis and VA-NVA Analysis for Press shop to Optimize the existing processes
Managing and Leading Value Engineering projects, Validating BOM for Electro-Mechanical Assemblies used for testing lighting fixtures
Validating 2D fabrication and machining drawings, 3D models in SolidWorks, AutoCAD files for laser cutting
Managing team for Sheet-Metal design, validation, drafting, designing Jigs for paint line and fixtures for machining
Creating-Implementing Nomenclature for Press shop Die Tooling for standardization
NPD for lighting fixtures, APQP for the upcoming product launch, Managing and setting up line as per throughput time
Implementing 5S, continuous improvement activities, Updating plant layout, Creating process flow diagrams in Visio
Work instruction / SOP for process standardization
Consultant at McNeilus Truck Mfg., Dodge Center, MN June ‘16–July ‘17 Manufacturing Design and Industrial Engineer
Managed Time and Motion study Project for existing process of Chassis Preparation line, Mixer Drum Fabrication Line, Refuse truck body line and improved productivity by Waste elimination techniques
Implemented KANBAN, 5S, KAIZEN, Gemba Meeting on Assembly line of Mixer Truck and Troubleshooting
Managed and Lead Time study for paint line, Created Nomenclature for Paint Schemes, Validated costing process
Managed offshore Team from Onsite to Design welding and paint jigs
Created 2D Engineering Drawing and 3D Model on SolidWorks for Sheet-metal parts
ECN / ECR activities for Existing drawing files in AutoCAD and SolidWorks
Validated Assembly welding detail drawings for mixer drum and refuse truck body
Achieved Line balancing of Chassis preparation line, Front discharge mixer drum line as per the takt time
Drafted performance requirements for engineering projects and product development
Implemented root cause analysis and 5 why technique
(Cell) 646-***-**** *****************@*****.***
http://www.linkedin.com/in/himanshuswami6079
Consultant at Halliburton Energy Services (Offshore Support), India April ‘14–June ‘16 Manufacturing Design Engineer
Managed team for Concept Design and Validation of Sand Hopper arrangement in sand transfer system
Designed Sheet-Metal parts, 2D drawing, 3D Modeling, Assembly welding detail drawing for Sand Transfer system
Managed team for Testing and Subsea, Drafting practice standardization, ECN / ECR Activity. Implemented customized design solutions, Time and work management
Managed project leading Multifunctional team (10 Members: 5 Electrical, 3 Electronics, 2 Mechanical) Delivered 5 prototypes of ESP Test Box Successfully to client based in Houston, Texas Facility Designed concept And Validated, New Product Development for ESP Test Box (Electro-Mechanical assembly) used for logging Oil Well Data and should function in the temperature range of -40 C to +85 C. Finalized Enclosure, Damping Material, Designed Sheet-metal parts inside assembly, wire routing for connectors, Designed Panel Decals. Applied DFM-DFA-DFMEA for New Design. Created Work Instruction for Assembly Procedure.
Managed and Executed Reverse Engineering for ATS Station (Electro-Mechanical Assembly)
Designed concept and validated Sheet-metal parts for Multilateral Drilling Test Equipment used to simulate actual drilling scenario at In-house facility and designed shrouds for wastewater collection system 2.) GEA Process Engineering India Pvt. Ltd, India Nov ‘11–April ‘14 Design Engineer
2D Drafting, 3D modeling with AutoCAD, Inventor and Micro-Station, BOM generation and verification, GD&T, ECN/ECR activities for Tanks, Evaporators, Agitators, Heat Exchangers, Cyclone spray dryer
Valve Skid Fabrication and assembly drawing, General Arrangement drawing for Tanks, Pressure Vessels
Pipe Routing in 3D Plant Layout, Reading P&IDs
Nozzle Placement Drawings for Tanks and Pressure vessel 3.) SETCO Automotive Ltd, India July ‘11–Oct ‘11
Production Engineer
Managed production-assembly line and inventory for different size and types of clutches of heavy duty vehicles
Performed process improvement methods
Performed Time and Motion study of the process and reduced waste in terms of time
Achieved daily production targets and managed machine handlers on clutch assembly line
Managed heat treatment shop
ACHIEVEMENTS:
Designed Sand Hopper For Sand Transfer system in My First project in Halliburton
Delivered 5 Prototype for ESP Test box Working with Halliburton to Houston Facility in TEXAS Leading Team from offshore in India with Client Satisfaction 96%
Implemented New Drafting Standard for Halliburton in Testing and Sub-Sea PSL; reduced number of ECN / ECR by 30% caused due to drafting error. Reduced cost by $17,600
Reverse Engineering for ATS Station (Electro-Mechanical Assembly), Client satisfaction 90%
Implemented Nomenclature by categorizing Trucks by Colors and Complexity at McNeilus Truck Mfg., Reduced errors while costing by 36%
Reduced Mixer Drum Fabrication cost by $1560 at McNeilus Truck Mfg.
Designed Paint jig for 8 Feet long Lighting fixture at Focal Point Lights, Efficiency has been increased by 300%
Implemented SMED in brake press area
Implemented Standardized Engineering Drawing Practices at Focal Point Lights, Production cost reduced by $4106