Resume
PRAKASH B. PAWAR
G-***, Durvas Complex,
Yashwant Viva Town Ship,
Near “D” Mart, Vasai ( East),
Pin : 401206.
Mobile No. 956******* / 956*******
Email ID – ***************@*****.***
CAREER OBJECTIVE
To be a part of an Organization which offers an unlimited opportunity for growth and also a sense of Challenge and utilize my technical as well as analytical skills towards mutual benefit.
PERSONAL INFORMATION
Date of Birth : 21st July 1973
Marital Status : Married
Gender : Male
Nationality : Indian
Religion : Hindu
Languages Known : English. Hindi & Marathi
Hobbies/ Interest : Playing Cricket
ACADEMIC QUALIFICATION
Examination
University/ Board
Year of Passing
Class
S.S.C.
Mumbai Board
1990-1991
1st
Diploma in Mechanical Engineering
Mumbai Board
1992-1996
IInd
ADDITIONAL QUALIFICATION
Completed Diploma in Mechanical Engineering (D.M.E) From Bombay University.
Experience:-Total In Hotel Industries: 8 Years, 05 Months.
Basic Knowledge of Computers
MS – Office WORK EXPERIENCE
Presently working with “ Krishna Palace Residency “ at Grant Road (West) as a
“Chief Engineer” from 08 June 2015.
Worked with “Ramee Guest Line Hotel” at Juhu as a
“ Chief Engineer ” from 02 June 2014 to 04 June 2015.
Worked with “The Beatle Hotel’’ Powai Hiranandani as a
“ Chief Engineer ” from 14 th July 2012. to 14 May 2014.
Worked with “SVENSKA DESIGN HOTELS” ANDHERI (W) as a “Engineering Manager” from 01rd June 2011 to 13 th July 2012.
Worked with “HYATT REGENCY” ANDHERI (E) as a Senior Engineer from 21st July 2006 to 31st May 2011.
PROJECT HANDLING.
Presently Handling the GOA Project for The “Beatle Hotel” at Madgoan, Installation & Commission of 250 TR Chiller – Make: Trane,
10 TR Hot Water Systems Installation -Make: STG, Installation of Fire Alarm & Sprinkler Systems, 1000 Kva DG Installation.
Handling 11 KVA Transformer Cabling, Capacitor bank Electrical cabling,
Handling Kitchen Equipments installation of Walk In, Deep, Dough Sheeter,
Dough Mixer, Under counter fridge,
TECHNICAL EXPERIENCES – IN HOTEL INDUSTRIES.
THE BEATLE HOTEL- (Powai, Hiranandani).
Looking after Operating & maintenances of Transformer (11KVA)
625 Kva DG maintenances & “B” check, AMC Renewal, Preparing Work Order,
64 HP VRV Make: Daikin handling maintenances such as Coil cleaning & Electrical Panel Ppm, Checking daily basis HLP unit & Water consumption,
Handling 7.5 & 10 Kva Ups panel & Battery maintenances, arranging manpower, for daily basis Electrical panel & Ac indoor & outdoor unit Ppm, Fire alarm & Sprinkler systems maintenances, Kitchen equipments such as Deep & Walk in outdoor & indoor unit coil servicing, Refrigerator maintenances. Preparing every month Ppm schedule chart & arranging man power for the same.
Reporting to General Manager & updating every day follow up in morning meeting.
SVENSKA DESIGN HOTELS (Andheri-w)
Working as Engineering Manager from 1st June 2011 to 13th July 2012.
Operation & maintenance of Transformers (315KVA)
11KV/440V.
RO plant, electrical Panels, motors, HVAC (VRV System), FCU, TFAU, Kitchen equipments, walking coolers, Fire fighting system.UPS
Man power planning
Daily HLP
Emergency shut down
Day to day Maintenance i.e Plumbing, FCU,, Ele, Mechanical
Consumption of water, gas, diesel, electricity etc.
Hydropenumatic System.
* CCTV
* Fire Fighting.
“HYATT REGENCY-( Andheri E
Worked as a Senior Engineer from 21st July 2006 to 31st May 2011)
. Operation & maintenance of 03 nos Screw Chiller (410 TR each), Transformers (2000 KVA) two nos.
11KV/440V, 6.6 KV/440V, generators, 1500KVA( two nos), cooling tower 2000 TDR, RO plant, electrical Panels, motors, HVAC AHU, FCU, TFA, Kitchen equipments, walking coolers, Fire fighting system.
*Man power planning
*Daily HLP
*Emergency shut down
*Day to day Maintenance i.e Plumbing, FCU, AHU, Electrical, Mechanical
*Consumption of water, gas, diesel, electricity etc
*Hydropenumatic System.
Daily report to Director of Engineering
*Changeover of system
* Fire Fighting Training
INDUSTRIAL EXPERIENCES.
Worked for “ VANSON ENGINEERING PVT. LTD.” Vasai (E) which is sister concern of “MARLAND ENGINEERING PVT LTD.” As a supervisor cum Service engineer from 1st January 1999 to 18th July 2006.
JOB PROFILE
At “MARLAND ENGINEERING PVT LTD.”my job involved looking after Tool Room activities as mentioned above and going on field and looking after Sales and Services activities of the Company
Worked for MEGA RUBBERS PVT. LTD., Vasai (E) as a Supervisor, Tool Room from 1st December 1996 to 31st December 1998.
Job Profile
At MEGA RUBBERS PVT. LTD. I worked as a Supervisor for Tool Room, My Job involved preparing Dies, Work to the workmen, Supervising their activation, purchasing Materials for the Tool Room, Inspection of Dies and Quality Control
Declaration
I hereby declare that the statements made above are true, complete and correct to the best of my Knowledge and belief
Place: Mumbai
Date : 4/10/17
( Prakash B. Pawar)