Post Job Free
Sign in

Project Manager Management

Location:
Norwalk, CA, 90650
Posted:
October 13, 2017

Contact this candidate

Resume:

Steven Ebert

***** ***** ***

Norwalk, Ca. *****

850-***-****

**********@*****.***

S ENIOR P ROJECT M ANAGER

Technical Sales ~ Project Management ~ General Management ~ Estimating Senior Project Manager professional with 35 years experience in leading, executing, and overseeing projects consisting of Aluminum Curtainwalls, Storefronts, Aluminum Entrances, Pre- Manufactured Windows and Doors, Automatic Doors, Custom Glass, Bullet Resistant Products, Fire Rated Glazing, Hollow Metal / Wood Doors and Frames. Experienced and goal oriented with a track record of continually meeting or exceeding established goals and objectives related to management of projects. Extensive experience with Coastal Impact Products, Blast Mitigation, Military Specs, High Rise, Condominium and Hotel Work, Design Build Coordination with Architects and Designers, and Overseas Contracts and Logistics. Possesses excellent communication skills on all levels and demonstrates additional strengths in:

P&L Responsibility Negotiations Installation

Project Management Bidding / Estimating Team Leadership

Contract Management Take-offs / Cut Lists Field Supervision

Sales / Sales Management Final Project Closeouts Job Control / Scheduling C AREER A CCOMPLISHMENTS

1755 Argyle – Los Angeles, Ca ($4 Million) 201*-****-** Story Residential – 6800 Linear Ft Decorative Glass Railing – Window Wall – Sliding Glass Doors = Automated Herculite Entrances - Interior Storefront – Complicated geometric railing was bid all- inclusive with a railing supplier located in Midwest – material logistics would have been prohibitive schedule-wise. Shipping expenses on incidental replacement of glass and multi-angle welded top rails were potentially prohibitive. I located local glass, welded railing and miscellaneous brake metal cladding suppliers and substituted via change orders at an actual savings to the budget. All individual glass and railing issues became manageable. At 90% completion the job is well within budget and virtually on schedule. Glass issues are at less than 20 pcs. out of over 1600. Maneuver Center - Building 4 – Ft. Benning, Ga ( $2.3 Million) 2009-2013 USACE/DOD Project - 25,000 sq ft – Blast Rated Radius Top Curtainwall installed in retrofitted steel and pre-cast substrates. First opening ready to measure in Dec 2010 / First frame set Jan 2011. Despite harsh winter and constant delays by precedent trades, The main tower was complete and turned over to the Army on Aug 1, 2011. Facade featured over 60 Individual 30’ Curtainwalls separated by 18” custom radius columns that we re-designed to be glazed into the system, eliminating tens of thousands of dollars in steel columns and clips for the customer. On schedule and on budget despite an unprecedented level of schedule and design complications.

Page 1 of 4

Redstone Arsenal, Al – ATF Training Center ( $ 750,000.00) 2008-2010 High Security Installation –Design Build- 6,000 sf Curtainwall and Storefront Job was on schedule and under budget despite over 90 weather days in 14 months. Worked directly with architects in redesigning fixed windows using CW framing to incorporate oversized glass daylights at all fixed windows. Worked with corps engineers to redesign overlooked transition between a free-standing vestibule and an already completed main curtainwall. Outstanding rating from ATF after completion.

Sheraton Atlantic Beach Atlantic Beach, NC ( $1.4 Million) 2008-2009 Replaced 216 doors in occupied hotel in 6 months from shop sign offs in December to June 1 completion. The project was completed at 10% under budget with minimum impact to hotel operations and occupancy. Redesigned door jambs to incorporate free-standing .250 jamb tubes to eliminate rebuilding vertical substrates for anchors. The hotel took a direct hit from Hurricane Irene in August 2011. All doors were intact after storm. Insurance inspectors assigned all major water intrusion to roofing and surrounding stucco walls. Said doors passed with “flying colors”. Rose Hall Resort and Country Club Montego Bay Jamaica ($1.1 Million) 2007-2008 Despite severe overseas shipping and customs delays, a job evacuation for Hurricane Dean and 2 dropped crates of glass by Air Jamaica,which required an emergency change order for polycarbonate temp material, this job came in under budget and the hotel opened on time.

Perdido Sun Condominium Perdido Key, Fl ($ 1.3 Million) 2007-2008 The Hurricane Ivan repair was completed at 5-10% under budget and on schedule despite major undisclosed substrate damage. Worked directly with architect and engineer from initial damage inspection and assessment in choosing retrofit products that would meet new coastal codes with mimimal reconstruction of existing substrates. Gross profit was 27%. P ROFESSIONAL E XPERIENCE

GOLDEN GLASS Fullerton, CA

Senior Project Manager 2016-2017

As Sr. Project Manager for Golden Glass, my responsibilities consist of: Contract management, shops and submittals, material orders and tracking, schedule of value and continuation sheets, billing, lien releases, on-site management, direct contact with GC’s, Engineers and Architects on design build work. Created my own excel spreadsheets for consistent management, calculation and tracking of glass and welded railing for an extremely complex railing system. INDEPENDENT CONTRACT Austin, TX 2014-2016

Private Project Management for Dutch Investors

Construction of Home and Storage Units on Cedar Creek Ranch / Austin Handled International Shipping and Logistics

Page 2 of 4

HIGH PERFORMANCE GLASS Panama City, FL 2007-2013

Senior Project Manager

As Sr. Project Manager for High Performance Glass, my responsibilities consist of: Take-offs, estimating, contract negotiation and management, shops and submittals, material orders and tracking, schedule of value and continuation sheets, billing, lien releases, on-site management, direct contact with GC’s, Engineers and Architects on design build work.

Products consist of:

ATFP Blast Resistant Windows, Curtainwall and Storefront for Military applications, Wind- Borne Debris Codes and Coastal Hurricane Impact, Bullet and Fire Resistant Glazing, Automatic Doors, Louvers, Sunshades, ACM

GULF COAST GLASS CONTRACTORS, CONTRACTORS Fort Walton Beach, FL 2006-2007 Managing Partner / Senior Project Manager

As Partner / Sr. Project Manager for Gulf Coast Glass Contractors, my responsibilities consisted of: Shop management, take-offs, estimating, contract negotiation and management, shops and submittals, material orders and tracking, schedule of value and continuation sheets, billing, lien releases, on-site management, direct contact with GC’s, Engineers And Architects on design build work

Products consist of:

Standard Storefront and Curtainwall, ATFP Blast Resistant Windows, Curtainwall and Storefront for Military applications, Wind-Borne Debris Codes and Coastal Hurricane Impact, Bullet and Fire Resistant Glazing, Automatic Doors

Completions:

$2.8 million over 18 months / Several local and Military contracts: Eglin AFB Hospital, Hangar Work, Officer’s Club, Local Civilian Contracts (Typical Size: $50K - $800K) GLASS ONE, ONE Ft. Walton Beach, FL 2002-2006

As Contract Manager for Glass One, my responsibilities consisted of: Dept. management, take-offs, estimating, contract negotiation and management, shops and submittals, material orders and tracking, schedule of value and continuation sheets, billing, lien releases, on-site management, direct contact with GC’s, Engineers and Architects on design build work.

Products consist of:

Standard Storefront and Curtainwall, ATFP Blast Resistant Windows, Curtainwall and Storefront for Military applications, Wind-Borne Debris Codes and Coastal Hurricane Impact, Bullet and Fire Resistant Glazing, Automatic Doors, Mirrors, HM Doors and Frames

Completions:

$ 1-2 Million per year / Contracts Local Contractors and Military work at Eglin AFB and Hurlburt Field

(Typical Size $30-500K)

Page 3 of 4

BRANDON DOOR AND GLASS, GLASS Nashville, TN 1996-2001

As Contract Manager for Brandon Door and Glass, my responsibilities consisted of: Project management, estimating, job take-offs, detail work, shop drawings, submittals, daily contact with Job Supers, Customers, GC's and Architects.

Approx. $1-1.5 Million per year (Typical Local Contracts. $10K-$500K.) Extensive work with Wood, Hollow Metal Doors and Frames, Hospital Work CUTLER RIDGE WINDOW CO.CO ., Miami, FL

As Sales and Installation Manager for Cutler Ridge Window Co., my responsibilities consisted of:

Complete oversight of sales, management and field supervision of residential and commercial jobs including estimating, material orders, shop drawings, permits, punchlists, contract closeout and collection.

Extensive coastal impact code experience for 4 years following Hurricane Andrew. Technical Experience

Proficient in MS Word, Word Perfect, MS Excel (Spreadsheet Design), MS Office Project Planswift, GDS Estimating Software, Vistavison, YKK Proprietary Software, Torgo PM Software E DUCATION & T RAINING

Nashville Technical Institute, TN

Blueprint and Project Management

Cleveland Institute of Electronics

FCC 1st Class License

Washington University, St. Louis, MO

Some Course Work Completed

Clayton High School, St. Louis, MO

Page 4 of 4



Contact this candidate