Post Job Free
Sign in

Engineering Engineer

Location:
Houston, TX
Posted:
October 11, 2017

Contact this candidate

Resume:

Amanda Nilar Khaing

*********@**********.*** • 480-***-**** • 23407 Crescent Point Cir, Katy, TX (VISA: Permanent Green card)

Experiences

Gulf Interstate Engineering

(Houston, TX)

**** – 2016

Principal Process Engineering

Performed conceptual, FEED detail design for upstream and midstream oil & gas projects

Performed and provided oversight in the development of a project scope of work, engineering deliverables, operating philosophies, design-basis manual, equipment specifications, data sheets and material requisitions.

Performed hydraulic and flow assurance studies on a wide variety of gas and liquid production units and pipeline by using simulation software

Lead internal Process Quality Reviews of engineering deliverables

Participated in project and technical review meetings to set objectives and resolve potential design issues

Achievements

Designed FEED for 135 miles cross-country gas pipeline and operating facilities plant for Colombia-Arendal project, within 4 months to support 15% increase in production.

Implemented 50 miles oil pipeline installation for the maintenance purpose for Total-Uganda project, within 2 months to prevent the shut-down operation.

Analyzed reliability improvements of export pipeline facilities FEED layout at Jetty for Total-Angola project, within 3 months to increase the 20% facility exercises.

Universal Pegasus International

(Houston, TX)

2013 – 2014

Flow Assurance Engineer

Analyzed reliability improvements for pipelines and facilities units and provided new developed FEED design.

Evaluated the troubleshooting and economic impact of the process units ie. pressure surveys, temperature surveys, thermal hydraulic analysis and correcting potential problems

Supported the turnaround and maintenance activities of the operating plant including revision, technical performance cost and schedules, development of operating procedures and recommendations for maintenance.

Developed reports inclusive of mitigation and management of potential hydrate, wax deposition, slugging, gelling, and corrosion, start up, shut down, chemical injection, pigging and wax deposition analyses

Achievements

Developed and analyzed the 4982 ft. offshore gas pipeline network for ENI-Allegheny Project within 6 months to increase 40% of the production rate.

Designed the new process operating plant facilities’ equipment sizing to replace for Phillips 66 – Freeport project, within 3 months to add 20% more efficiency to operating units.

Participated in designing 600MMscf production capacity for Statoil-Cornerstone gas production pipeline and plant; and assisted in implementing and assuring process safety management compliance, within 4 months.

TOTAL E&P

(TOTAL FINA ELF)

Yangon, Myanmar

2010 – 2011

HSE and Contract Engineer

Lead in identifying hazards and weaknesses in process safety management,

Developed the HSE manual, emergency documents, the engineering process and production safety documents for the operating and process system.

Established the engineering audit team for HSE awareness on site and implemented the Detail cause tree analysis, Task risk analysis, HAZOP for all operations and business units.

Participated in activities associated with equipment and material procurement, permitting, subcontracting, reviewing vendor equipment documents and seeking discrepancy resolution.

Achievements

Edited and issued the HSE manual, the engineering process and production safety manual for the company operating system and process system within 6 months.

Cooperated in detailed engineering design for offshore and onshore gas plant by considering HAZOP, HSE concepts.

Checked and issued the operating and safety guidelines for units in gas plant including identifying hazards during equipment failures, process deviations, external events and operator errors

Developed the yearly KPIs in personnel development, resource utilization, regulatory interfaces and daily maintenance with respect to the project; which will increase productivity of both manpower and machine power for the company.

TOTAL E&P

(TOTAL FINA ELF)

Paris, France

2007 – 2009

Process Engineer

Planned and scheduled the time frame to accomplish the design units and cost calculations.

Integrated working with other departments to develop a long-term strategy for continuous improvement around safety, quality, productivity and capacity of the projects to deliver the safety and value data.

Provided assistance with process troubleshooting and optimization analyses that improve effectiveness, efficiency and area cost saving.

Achievements

Developed the cost effective new topside production facility sizing for Floating Production Storage and Off-loading (FPSO)

Designed the high pressure production loop development for low reservoir of oil and gas transport to on-land within 3 months.

Deliberate the pump installation and flow assurance across the production loop pipe lines for the time when the production rate is decreased – to find the best location for the pump to install, impact and capacity of the required pump for 5 months project.

Evaluated the blowdown valves sequence from the offshore production rig for emission tracking.

TOTAL E&P

(TOTAL FINA ELF)

Aberdeen, UK

2007 – 2007

Production Engineer - Intern

Worked with other departments to achieve the safety and engineering value data.

Assisted with process engineering supervisor to define and scope improvement as part of project selection process.

Participated in providing engineering support to ensure asset Integrity and process Safety in operation design.

Organized and issued the respective project documentation including progress updates, results outcomes and final reports.

Achievements

Developed the gas fact sheet to monitor in flaring and emission control for gas productions outlets.

Evaluated the blowdown valves sequence from the offshore production rig for emission tracking.

Designed and Stimulated the dry Nitrogen emerging into the pipelines project at the gas plant to control the flaring system and humidity control (to store the gas) within 5 months.

Education

Institute Français du Pétrole

Paris, France

2008 – 2009

University of Nottingham

Nottingham, UK

2005 – 2006

Yangon Technological University

2000 – 2004

Associate degree in Petroleum Engineering

Master of Science – Chemical Engineering

Research Thesis Paper – Flow Patterns and Phase Separations across T- Junctions, 2 mm diameter pipe, (gas/liquid flow)

Group project - Ozone treatment in Metal Working Fluid (MWF) to extend MWF use-life

Bachelor of Engineering – Chemical Engineering

Engineering Stacks

Skills

* Novice *Expert

Heat and material balance

Heat transfer / Thermodynamic

P&ID, PFDs, Block Diagram

Multiphase pipeline transport

Pump and compressor design and pant layout

Flow Assurance and Hydraulic analysis

API 510-520-570, API 14E

ASME B31, CFR 1910.119, CFR 192 and 195

Production facilities design (Separation, purification, distillation, etc. )

HAZOP

HSE Management

Risk awareness and Cause tree analysis

Contract and Internal Audit

Process safety management

Occupational health

Engineering Software Skills

* Novice *Expert

HYSYS

OLGA 5

PRO II

PIPESIM

PROMAX

PIPELINE STUDIO

Microsoft Access and Office

Contact

Amanda Nilar Khaing

(480) 747- 3836

*********@**********.***

23407 Crescent Point Circle, Katy TX 77494

https://www.linkedin.com/in/nilar-amanda-khaing-1804a94/



Contact this candidate