Post Job Free

Resume

Sign in

Mechanical Engineering Engineer

Location:
Pomona, CA
Posted:
October 10, 2017

Contact this candidate

Resume:

Riano RodríguezChino Hills, CA ***** 818-***-**** cell ac2oy4@r.postjobfree.com/in/riano-a-rodriguez-19576122

Education: Polytechnic University of Puerto Rico, Hato Rey, PR BSME of Science in Mechanical Engineering 2011

School of Electricians Isabela, P.R. Refrigeration Degree 1999

Professional Electrical School Manati P.R. Electrical Degree 1995

Technical Vocational School in Manati, P.R. Associate Degree in Instrumentation 1992

Certifications Colegio De Peritos Electricistas de Puerto Rico (CPPR)College of Electricians Experts of Puerto Rico Collegeprovidesseminars in sensors, PLC, Generators, and certificationeveryyearourcolligationwith new seminars in solar cells and renewableenergy.

Colegio De Técnicos de Refrigeración y Aire Acondicionado de Puerto Rico (CTRA) College of Refrigeration and Air Conditioning Technicians College provides seminars in Chillers, A/C portable & domestic Units and changes in refrigerant.

Short Summary 2013 to todayCame to the USA the end of 2013 after Pfizer sold the Puerto Rico to Neolpharma. Declined lower level position offered and accepted severance package. Recruited by Randstad for two-year contract in southern California starting in January 2014 working for Trojan Battery in Sante Fe Springs, Amazon in Moreno Valley, Electrorack Enclosure in Anaheim and Johnson& Johnson in LA and at the end of two-year contract, Randstad offered a temporary position with Braun Medical in Irvine.

Neolpharma tax breaks for former Pfizer-owned plant in Puerto Ricowww.in-pharmatechnologist.com/Ingredients/US-mulls-Federal-Trade-Zone-status-for-Neolpharma-Puerto-Rico-plant

Jan 2014 to present Randstad EngineeringSouthern California

Maintenance Supervisor-3 – Jan 2017 to presentB. Braun MedicalIrvine, CA

Manage 15 skilled trades over Packaging and Filling process assisting change over and line start up running 24\7 to maximize OEE (Overall Equipment Effectiveness). Working close with technicians, help meet the challenges to organize machine shop and update PLC skills. Improvedrepair\spare parts working closely with planners and SAP to update and maintain database to facilitate Preventive Maintenance.

Pursued conveyor speed adjustments for operational timing to ramp speed of boxes feeding downstream of the robot palletize systems.

Machine Shop was organized and 5s to achieve faster deployment of our work resources

Conveyors were improved adding sensors and interacting with AB VFD to improve flow at Different lines dedicated to selected box sizes.

PM program was modified to develop predictive actions documents to replace bearings and chains to slow downtime ruptures with minimum quantities of spare parts and backups of PLC and Panel view password login levels.

Maintenance Team LeaderOct 2015 to Dec 2016Johnson & JohnsonLos Angeles, CA

Scheduled 30 skilled trades and applied lean management tools to focus on OEE improvement to equipment creating slowdown or obsolescence of missing Parts Room and to support CMMS database. Successfully revised Preventive Maintenance Program for every piece of equipment, arranged by breakdown enabling meetings to identify flaws and gaps in the PM process. Developed Maintenance Department one-on-one meeting to designated personnel with subject-matter expert (SME)experience and create one point lessons during PM’s or equipment set up failures.

Applied 5s process in Machine Shop to identify stockroom parts and created virtual PDF of Mechanical and Electrical Schematics.

Created PLC Lab to transfer troubleshooting skills with Allen Bradley, Siemens & Mitsubishi, Automation Direct, VFD controllers

Global Change Control to specify like for like parts not existing and replaced for new and similar brand.

Employees One on One to see maintenance achievement with individual associates and their points of views inside the organization.

Facilities ManagerJan 2015 to Nov 2015 Electrorack Enclosure Products Anaheim, CA

Manufacturing server cabinets having responsibility to improve OEE during the assembly process by unifying conveyors with the infeed stages to the washing station, painting areas and the end process to assembly department. Linked systems through installation of smart sensors and installing new level sensors at the final Washing stage to prevent overflow of tanks, monitor water hardness with input sensors hard-wired to PLC software.

Facilities EngineerControl Systems SpecialistJul 2014 to Dec 2014 Amazon, Moreno Valley, CA

TroubleshootingDematic Slam conveyors with Printer applicators started up by HMI guides to delivery packages properly and all done through RS Logix 5000 and Cognex Dataman software.

Visualization Software used for troubleshooting and HMI C-More 2.77 used to drive Slams and AB 1500 for Routing Mergers and Sorter.

Conduct training on RSLogix 5000 Shipping Sorters and Routing Conveyors with subroutine programming creating new tags with photo eyes monitoring the upstream and downstream.

Amazon had its AFE Amazon Fulfillment Engine based on conveyance system via profibus and troubleshooting done through static IP address connection.

Parameter modifications at HMI to configure screens and drive VFD drive.

Breakdowns and or Control issues were achieved in an excel list and some modified during low season and others needed immediately.

Cognex Cameras and Sick scanners modified in resolution and scanning performance.

Back up of Data done in a punch list including date modification and revision changes.

Zebra Printers were programmed through Slam-u-lator program

Maintenance Supervisor Jan 2014 to Jun 2014 Trojan Battery Company Santa Fe Springs, CA

Projects involving conveyors upgrades and HMI actualizations to update menu functions to achieve more recipes. Modifications of line laser systems and Battery Melter machine validated to improve production OEE and reduce production costs.

Riano RodríguezChino Hills, CA 91709 818-***-**** cell

ac2oy4@r.postjobfree.com/in/riano-a-rodriguez-19576122

Page Two

1998 to 2013 PfizerCaguas, Puerto Rico

Mechanical Engineering Supervisory

Project Development Engineer

Process Technician

Advanced within engineering department to a position as a Project Development Engineerimproving Equipment and CAPA (corrective action / preventive action) minimizing downtime for production schedules and any breakdown situations.

Lean Management tools were used to improve OEE

Validation team (Giis) Global Industry Integrated Services, to supervise the Engineering projects at Prilosec new expansion,

SOP qualification documents generated to proceed in Installation Qualification and Operational Qualification for New Prilosec Expansion area. Start up in FBGD Fluid Bed Granulator Dryer

Validation at Prilosec including Vasotec and Fosamax. Sugar Coating pans were validated on RPM velocity and PID measures were tested for conversions of parameters for lectures at new displays of parameter indications eliminating old display and placing new touch screens.

Kuka Robot Palletizer and Cyclops wrapper machine servo drives.

PLC troubleshooting at PLC-5 and Allen Bradley 500 and updating controllers and I/O signals. PLC Backups and ladder configuration of Rs-linx ports. Identify ladder diagrams components and consulting blueprints or schematics to observe errors.

Panel View installation controlling SLC 504 and ladder creation to latch replays.

Air Handling Unit troubleshooting for instrumentation temperature setting values and Differential Temperature Transmitter Installation for accurate PID Process Instrumentation Diagram settings.

PLC troubleshooting such as PLC-5 and Allen Bradley-Slick 500 and related in outputs and input ladder signals experience such as communicating with PLC Backup and ladder identification Software Rs-linx interface program with Allen Bradley & Omron, Reliance and troubleshooting with input sensors or relays and motor outputs. Ladder diagrams modified consulting blueprints or schematics.

Troubleshooting with electrical contractors and 3 phase motors and generators and RPM rings were installed with red lion display meter. Variable Frequency Drivers installation and programming.CTC Custom tech with application manager connection via PS/2 to troubleshoot touch screen.

Reliance, Omron and Mitsubishi PLC connections and troubleshooting via PS/2.

Sugar Coating Pans & (MG2 76, 120, 140 Korsh Tablet Press 800, IMA Capsule filler and Precisa capsule check weight unit machine

Metal detectors such as Safe line, Loma IQ inside their components and blueprints

Fitz mill, Comill, Blenders & AMF Bowl Grals, Chart recorders

FBGD Fluid Bed Granulator Dryer such as Vector and Aeromatic brands.

Cooling Belts and extrusion process such as Berndorff.

Lasetec validation, Resina Capper, Lakso Filler Allen Bradley panel view 300 installations, Omega Unscramble PLC upgrade rungs

Weiler Label systems (Systech) reject solenoid implementation. And Lasetec validation, Resina Capper, Lakso Filler Allen Bradley panel view 300 installations, Omega Unscramble PLC upgrade rungs added.

Uhlmann Carton thermoforming machine packaging set up.

Experience with inductive, capacitive, reflective sensors installation etc.

LOTTO (Lock out Tag out) Energy control program. For any energy supplied at equipment.

HMI Human Machine interface panel installation General Electric Fanuc.

Pro Engineer basics to extrude parts were used; Solid Works was inquired further before Auto Cad 14 Mat lab and basics of C++.

Cleaver & Brooks Boilers modification of Control System with overhaul in Touch Screen and deliver all instrumentation inputs to PLC the PID process verified in details for accurate temperatures and signal processing outputs simulated 4 to 20 MA and signal for control valves.

Trainings with Electricians and Mechanical technician’s improving skills and meet expectations of equipment progress among operational associates, these trainings based in certifications done to see progress of colleagues using Method M1 and M4 based on yellow-belt achievements.

OSHA training.

ISO 9001 regulatory requirements

SAP database work orders verification and Preventive Maintenance Records overview.



Contact this candidate