Post Job Free
Sign in

Electrical Engineer

Location:
Kochi, KL, India
Posted:
October 08, 2017

Contact this candidate

Resume:

DHINU RAJAN

Contact: 009***********, 009***********

009**-********

E-Mail: dhinurajan@gmailcom, **********@*****.***

JOB OBJECTIVE

Seeking assignments in Construction Management, Site Management and Project Management with a reputed organisation, preferably in Middle East and India

PROFILE SUMMARY

A performance driven professional with 26 years of experience in Construction Management, Site Management and Project Management

Proficient in managing EPC Contracts, preparing Budgets, manpower control, Quality control, site safety management, material management, project planning, estimation, drafting Bills and administering Cost Estimation & Control activities

Deft at conducting Rate Analysis & organising Work Orders for the Sub Contractors

Experienced in handling civil works involved in the execution of various electrical & pipeline projects

QA / QC of the electrical activities of the project

Planning the execution and installation of various type buildings, kitchens, gas system, and fire alarm system

Possess the permit to work inside hydrocarbon facilities, near existing pipelines and live gas hot tapping lines

An analytical thinker with excellent interpersonal, people managements & problem solving skills

Experience in:

oPower Plant construction experience

o500MW HVDC project experience

oSubstations up to 400KV experience

oHV Cabling up to 33KV,66KV and 220 kV

oLV cable laying and installation

oOHL exp up to 400 KV

oOil field maintenance experience

oInstallation and commissioning of oil field electrical works

oOil and Gas & Construction Field

oCathodic protection system installation

oTemporary facility construction and camp construction up to 10000 people

oPower transformers installation up to 200MVA

oGIS indoor switchgear installation 33KV,66KV and 220KV

oGIS switch gear outdoor up to 400 KV

oLV switchgear installation experience

oControl and relay panel installations

oInstallation of Temporary power for camps up to 12MW

oExperience in utilities maintenance at petrochemical and steel plant

oWorked as an electrical shift in charge for 10000 M3 oxygen plant

oWell experienced with MEW electrical works in Middle East

oMEP estimation and design

oSupporting to estimation department during tendering

ORGANISATIONAL EXPERIENCE

April 2015 to till the date. TOCO Oman (Interserve Group), as a construction Supnt.

Jan 2013 Nov 2014 JB Engineering co India

Feb 2010-Aug 2012 Hyundai Engineering Co, Abu Dhabi as Electrical Engineer

Jan’06 – Sep’09 TOCO (Willbros, USA), Oman as industrial Engineer (Electrical)

Jun’05 – Dec’05 CAE Control and applications Emirates, UAE as Engineer (Site Engineer)

Jul’04 – May’05 Melcon Engineers Pvt Ltd, India as Electrical Superintend

Sep’03 – Feb’04 Alkomed LLC, Bahrain as Electrical Supervisor

Apr’98 – Feb’02 Al Hassan Engineering Co SAOG, Oman as Electrical Supervisor

Mar’95 – Mar’98 Hofincons Ltd, India as Sr Technician

Jan’93 – Feb’95 P&D Enterprises, RIL Gujarat as Engineer

Jun’92 – Dec’93 Reunion Ltd, L&T Gujarat as Engineer

Jan’91 – Feb’92 Belma Engineers, Essar Steel Gujarat as Supervisor

Key Result Areas:

Handling the planning, execution activities and administering overall supervision for the installation of:

oPower plant 128MW, Gas Turbine

o400 KV substations and yard

oTransformers up to 200 MVA

oReactors up to 30 MVA 220 kV, 66 KV & 21 KV

o220KV, 33KV and 66 kV GIS switchgears

o220 kV and 66 KV Cabling,

oControl and relay Panel Installation and Termination

o HV & LV Cables up to 220KV laying and termination

oHV sub stations up to 400KV

o33KV and 220 KV OHL Installation

oLV switch board installation

oCamp construction up to 8000 peoples

oMEP design for 8000 people camp

oCP system installation

oShift in charge for 10000 M 3 oxygen plant

oUtilities maintenance experience.

oPipeline construction.

oTemporary facilities construction.

Providing adequate testing & commissioning, as and when required

Ensuring preventive maintenance of Beam Pumps, Shipping Equipment & other Rotating Equipment, Pumps and Sub Stations & Oil Stations

Managing installation of CP Cathodic protection System for Well Heads, Pipe lines

Performing quality control of the projects and handling tasks including preparation of Test Packs, Quality Procedures & Formats, ITP

Conducting all the Quality Control Tests on different specimens

Highlights:

Successfully handled the Sub Station assignments involving

oErection of Single Phase 400 KV, 200MVA Transformers, 400 KV Isolators, Circuit Bakers, Shunt Reactors, Stringing, Towers, 500 MW Thyrister Valve Hall, Control & Relay System for 400 KV AC Yard

o500 MW Thyrister valve hall erection, Control and Relay system for the 400 KV AC yard and Thyrister valves

o220KV cabling, Control and Relay panel’s erection and commissioning assistance

oPlanning, Execution and overall supervision of Transformer installation up to 150 MVA, Reactor’s up to 30MVA, 220 kV, 66KV and 21kV GIS SWGR’S, 220 kV and 66kV cabling, Control, Relay and Scada panel installation and termination of HV & LV cables Testing and commissioning assistance

o128 MW Gas Power Plant Project works like electrical cabling, installation, Control and relay panel installation and termination, Transformer Installation, HV cabling

oTermination, gathering station up gradation electrical works, 220 KV OHL,33KV up to 220kV

oErection of Single Phase 400 KV, 200MVA Transformers, 400 KV Isolators, Circuit Bakers, Shunt reactors, Stringing and Tower erection

Dexterously managed

oInstallation, commissioning & testing of Cathodic Protection System for 18 KM Oil Line

oInstallation of CP system for well heads, Preventive Breakdown maintenance of sub stations & Oil stations Commissioning assistance

oInstallation of CATHODIC protection System for 18 KM Oil line, 36” 80 Km Gas line, 18” 103 Km gas line Work includes Installation, Testing and Commissioning

oErection and commissioning of 220 KV Cabling, Control & Relay Panel

oPreventive maintenance for Beam pumps, shipping and other Rotating Equipment pumps and other rotating equipment, well hook up

TRAININGS ATTENDED

PDO Approved HSE Trainings:

oPDO CEP (Competent Electrical Person) from NTI Oman

oPDO Permit Applicant Holder from NTI Oman

oPermit Holder from NTI Oman

oFirst Aid & CPR from NTI Oman

Training Courses conducted by National Training Institute, Oman

oSupervising Safety Course

oH2S Awareness & Escape Training

oDD3 - Defensive Driving Course

oFire Fighting Course in

Authorized H2S Gas Tester Training from NTI Oman and OXY Oman

HSE induction from PDO Oman, OXY Oman, ADGAS Abu Dhabi, Gasco Abu Dhabi and Bouroge Abu Dhabi

EDUCATION

1990 Diploma in Electrical Engineering from MTI Trichur, affiliated to Technical Board

PERSONAL DETAILS

Date of Birth: 14th February 1971

Address: Maliackal House, N Kuthiathode, Dist Ernakulum, Kerala, India, PIN 683594

Languages Known: English, Hindi, Malayalam, Arabic, Tamil and Guajarati

Nationality: Indian

Marital Status: Married

Number of Dependents: 2

Passport Details: No K-5983834, Place of issue: Cochin, Date of Expiry: 15/12/2022

Driving License: Indian, UAE and Oman

Location Preference: Middle East Countries and India

ANNEXURE

PROJECTS HANDLED

Title: Buroge-3 Temporary Facility Project

Client: Borouge, Abu Dhabi

Duration: 9 months

Designation: Site in charge

Description: The project involved constructing a site office for 600 people and accommodations for 2000 people

Responsibilities: Mep in charge for construction

Title: Habshan, IGD5 Facilities and Offsite Work Project

Client: Gasco, Abu Dhabi

Duration: 16 months

Designation: MEP in charge

Description: The project aimed at constructing a camp for 8000 people

Responsibilities:* Handled the Civil, MEP design and Telecom works

*Well experienced with ADDC regulations

* Involved in estimation and planning

Title: Kauther Pipeline Project, Safah maintenance contract, Mukhaizna service contract

Client: PDO Oman/OXY Oman

Duration: 43 months

Designation: Industrial Engineer

Description: The project involved laying a 36” Gas Line for 8020 km & an 18” Condensate Line for 104 km

Responsibilities:

Handled CP, Electrical, Mechanical, Civil, Instrumentation & Permit Co Ordination

Managed installation, commissioning & testing of Cathodic Protection System

Oil field construction works

Title: Das Island Power System Up-gradation Project

Client: Siemens UAE

Duration: 07 months

Designation: Construction Supnt

Description: Replacing of old 33 KV system

Responsibilities: Construction in charge

Title: 220 and 66 KV substations

Client: MEW Bahrain

Duration: 12 months

Designation: Electrical supervisor

Description: The project involved construction of nine 220 KV/66 KV GIS Sub Station and 220 KV Cabling

Responsibilities: Electrical in charge for HV installation

Title: Vizag 500 MW HVDC Project (400 KV back-to-back)

Client: ABB Sweden

Duration: 16 months

Designation: Site in charge

Description: Electrical installation for 500 MW HVDC, including 400 KV sub stations

Responsibilities: Overall in charge for construction activities

Title: 128 MW Gas Power Plant Project

Client: Petroleum Development Oman, Saihrawl, Oman

Duration: 12 months

Designation: Electrical Foreman

Description: Electrical foreman reporting to Project engineer

Responsibilities:

Administered the installation activities of the Electrical Cabling and supervised Control & Relay Panel installation & termination

Monitored installation of Transformers and termination of HV Cabling

Collated data on station up-gradation electrical works of 132 KV OHL, 33 KV

Title: Qarnalam Production Station Up-gradation Project

Client: Petroleum Development Oman

Duration: 8 months

Designation: Electrical foreman

Responsibilities: Expansion of 33 KV systems

Title: Burhan Electrification Project

Client: Petroleum Development Oman, Location

Duration: 12 months

Designation: Supervisor

Responsibilities: 45KM OHL, 132 KV new bay expansion and 33KV switch board expansion

Title: Al Ansab Primary S/S

Client: Ministry of Electricity and Water, Oman

Duration: 6 months

Designation: Supervisor

Responsibilities: Installation in charge for 33 KV cabling, transformers, termination and yard installation

Title: Dahira Region Expansion & Electrification Project

Client: Ministry of Electricity and Water, Oman

Duration: 09 months

Designation: Supervisor

Responsibilities: Installation of 12 KV substation, yard and OHL

Title: South Oman Service Contract

Client: Petroleum Development Oman

Duration: 08 months

Designation: Foreman

Responsibilities:

Routine maintenance for electrical system related to oil production, CP system installation,

Electrical installation for well heads

Title: Mukhaizna 18” Header Line Project

Client: Petroleum Development Oman

Duration: 07 months

Designation: Foreman

Responsibilities: CP system installation and commissioning

Title: Erection, operation and maintenance of HBI Material Handling System electrical works

Client: Hofincons industrial services, Surat, Gujarat

Duration: 18 months

Designation: Sr technician

Title: 10000 M3/H Oxygen Plant and Utilities Project

Client: Hofincons industrial services

Duration: 21 months

Designation: Electrical Shift In-charge

Responsibilities:

Operation and maintenance of oxygen plane, related utilities

Title: Temporary Electrical Construction Power Project

Client: Reliance Industries Ltd, Surat

Duration: 18 months

Designation: Electrical supervisor

Responsibilities:

Administered the construction of 66 KV Power Sub Stations

Handled the offshore deck electrification and Cracker Plant electrification work

Title: Electrical Maintenance Contract

Client: Indian Telecom

Duration 9 months

Designation: Electrical supervisor



Contact this candidate