Neal, Branden
PHONE : 817-***-****
E-MAIL : ac2mv9@r.postjobfree.com
LINKED IN : https://www.linkedin.com/in/branden-neal-25111987
DATE OF BIRTH : 20th June, 1986
PERMANENT ADDRESS : 4600 Elm Branch Dr. Arlington TX.
EMPLOYMENT STATUS : Unemployed since Oct 2017)
OBJECTIVE
Fulfill requirements for an Engineering position where excellent technical skills and experience will add to value operation. To integrate into the company, learn the art and succeed.
FIELD SPECIALTY AREAS
Drawings, Project Costing Analysis, Project Planning, Cost Effectivity
Sustaining Engineering, Digitization, Detailed Product Usage Analysis, ECR’s & NCR’s, Process Optimization, Engineering Documentation Creation, Part Number Creation
EDUCATIONAL DETAILS
Course
College/University
Year
Bachelor of Science in Aerospace Engineering
University of Texas Arlington
2008 - 2011
Associate in Arts
Tarrant County College
2006 - 2008
ADDITIONAL CERTIFICATIONS, SKILLS, AND AWARDS:
-2000+ Solidworks 2015 & 2016 hours
-Solidworks Associate certificate earned
-Completion of Drawings Professional Solidworks Course
-Completion of Surface Modeling Professional Solidworks Course
-Completion of Weldments Professional Solidworks Course
-Completion of Sheet Metal Professional Solidworks Course
-Completion of Advanced Assemblies Professional Solidworks Course
-Completion of Essentials Professional Solidworks Course
-200+ Solidworks EPDM vault management hours
-3000+ Catia V6 hours
-2500+ Catia V5 hours
-500+ Enovia hours
-GD&T courses completed and experience
-Static and Dynamic Structural Analysis
-Extensive Excel skills and Automated Macro Scripting Experience
-HTML & VBA computer coding language experience with emphasis on spreadsheet optimization
-Extensive Overall IT knowledge. Computer and network Building is hobby.
-Exceptional Communication Skills. Diplomacy and Tactful Professional Communication.
-Phi Theta Kappa International Honor Society Scholarship, Maverick Scholarship, and Hope Scholarship recipient for 3 consecutive years
MOST RECENT WORK HISTORY
Fellfab Corporation
www.fellfab.com
Lead Engineer
Feb 2014 – Oct 2017
3 yrs 7 mos
Fort Worth Area
-Promoted to Lead Engineer after 13 months
-Started at 55K and ended at 74K
-Laid off for economic downturn of airline
-Perform detailed costings of products and determine manufacturability of the products
-Create digital cut files and optimized material usages
-Manage digital filing system for all company drawings and engineering processes within the
Solidworks Electronic Product Data Management (EPDM) platform
-Responsible for all of TX facility engineering processes and sustaining engineering
-Provide costing for newly developed designs within the airline Industry through the use of
technical drawings and specifications
-Perform durability testing on airline interior designs to support warranty, customer safety
and satisfaction
-Search for cost effective and efficient methods to produce fire retardant interior and exterior
aircraft applications
-Develop & maintain Bill of Materials
-Ensuring that every TSS line is balanced, has standardized goals, and identify bottlenecks
-Customer and supplier support during projects (National and internationally)
-Aid in machine/tooling selection and development for new and existing products to maximize
Efficiency
-Create & Assign part numbers in SYACC (MRP)
-Determine cost estimates for new Request for Quotations and Engineering Changes
-Process Engineering Change Requests
-Develop, Maintain & Issue kit list and any special/unique product packaging requirements to
Production
-Maintain Engineering documentation & records (ex: product specifications, specification revisions issued internally & externally)
-Modify and/or make improvements to existing drawings on repeat orders
-Create new drawings from supplied samples, drawings or sketches
-Reverse engineer products when given supplied sample
-Design & develop, patterns using the Investronica system for repeat orders and new designs using
AutoCAD, and Solidworks as well as Optitex cad systems.
-Set up Drawing master log & maintain record of current revision level
-Provide backup support for customers, including the printing and organization of drawings and kit
-assemblies
-Manage, Coordinate & communicate sample build requirements & timing to Pattern
-Design and develop manual patterns and digitize if required
-Calculate pattern dimensions, determine pattern orientations, and make adjustments as required
for maximum yields
-Develop & maintain markers as required
PAST WORK HISTORY
Bell Helicopter Inc.
www.bellhelicopter.com
Associate Engineer
Aug 2010 – Feb 2013
2 years 7 months
Fort Worth Area
-Started as an intern in 2010.
-Worked as a Material Review Board Engineer during the internship
-Reviewed parts that were outside of acceptable tolerances and inspected under microscopes to determine if a deviation to the tolerances was considered acceptable for the part at hand.
-Promoted to Associate Drive Systems Design Engineer in 2012
-Mechanical component design in a team oriented position.
-Drive train motor minor component design such as transmission fluid pumps with considerations to seals, bearings, O-rings, and engineering tolerances pertaining to the mechanical design of drive train components.
-Created detailed 3-D & 2-D drawings using Catia V5 & V6 alongside Enovia.
-Laid off for economic recession
UT Arlington
www.uta.edu/uta
Work Study
Aug 2009 – Feb 2010
2 years 7 months
Arlington Area
-Work study position overseeing printing center
-Maintain the printers and replace ink and paper as required
-When not attending students or printers, studying is encouraged
-Left this position to focus senior year and graduate
Tarrant County College
www.tccd.edu
Math Lab Tutor
April 2007 –June 2008
1 year 2 months
Grand Prairie Area
-Math lab instructor helping students with Math from Algebra level through advanced Calculus
-Left this job to go to UTA full time
Printpack inc.
www.printpack.com
Plastics Mfg Operator
June 2005 –Jan 2007
1 year 7 months
Grand Prairie Area
-Left to pursue full time college education
-Operated four story Computerized blown film manufacturing machines
-Verify quality as line runs
-12 hour graveyard shifts
-Lab verification of density and specimen thickness testing