NARASIMHA DEVARAJ
*** ****** ****** *****, **-***04
PH: 810-***-****
E-mail: ********@*********.***
OBJECTIVE:
To obtain a Manufacturing or Industrial Engineering job to apply my skill and knowledge.
EDUCATION:
Master's in Engineering Management at Kettering University, Flint. (Oct 2015 - March 2017)
Bachelor of Science in Mechanical Engineering at Anna University, Chennai. (August 2010 - April 2014)
COURSE WORK:
Kettering University, Flint, MI (October 2015- March 2017)
Marketing Management, Quality Assurance and Reliability, Strategy, Supply Chain Management, Project Management, Economics, Marketing Concepts and Applications, Financial Management, Managing People and Organizations, Energy Environment Systems & Design, International Business.
Anna University, Chennai, India (August 2010 – April 2014)
Engineering Mathematics, Statistical and Numerical Methods, Fluid mechanics, Thermodynamics, Design of Machine Elements, Dynamics of Machinery, Gas Dynamics and Jet Propulsion, Finite element Analysis, Total Quality Management.
CORE COMPETENCIES:
SOFTWARE: Minitab, ANSYS, AutoCAD, CATIA, Microsoft Office (Expert Level).
5S, Value Stream Mapping, Time Studies, Labor relations, Work Instructions, SPC, Problem Solving, Error Proofing, PFMEA, PPAP, APQP, DFSS, 8D, 5WHY, DOE, Gauge R&R, Line Balancing, Layout Readings, Enterprise Resource Planning.
Six Sigma Green Belt certification.
PROFESSIONAL EXPERIENCE:
CHENCOL Industries - Chennai, Tamil Nadu, India
Quality Engineer (Production Department) May 2013 – January 2015
Prepared work instructions and PPAP documents for the production process of the grinding wheels.
Prepared and maintained quality charts such as I- charts and Pareto charts and help in identification and analysis of the most common problems for the process, and help in maintaining 0 PPM.
Generated 8D’s and formulated the corrective measures that need to be taken for the defective parts that were shipped and made sure that the same was not repeated in the future.
Performed time studies and implement layout changes which reduces walking and other NVA activities.
Identifying root cause analysis for failure of Grinding Wheels like Dimensional Error, Weight Error, Grain Combinations, Rotational speed and locate imperfections.
Perform incoming inspection for the grinding wheels and compare it with the standards developed and give approval for the parts.
Implemented standard signage throughout the plant for easy material flow and identification by material handlers.
Analyzed demand data and came up with layout changes thereby saving unwanted WIP spots.
Worked with Materials department in implementation of FIFO and first-time quality.
Monitoring the products to make sure they meet specified standards.
Facilitating Supplier meetings for quality.
Contributes to the Continuous Improvement Project (CIP) to help drive costs down and improve the overall plant performance.
Address any quality issues faced daily.
Implementing the concepts of SPC, PDCA, GD&T on grinding wheels.
Observe and conduct a Time and Motion Study of the production line to maximize productivity.
Evaluate dimensional analysis reports of Gauge R&R Studies.
Validating the 8 D’s, PPAP’s sent by the supplier.
Analyzing the KPI’s and PPM’s of the plant and suppliers.
Maintained Product Control Plans and Floor related documents.
Review of ordering data, supplier quality assessments, process audits and product inspections.
Nelcast Private Limited., - Chennai, Tamil Nadu, India
Quality Controller - (Production Department) February 2015 – April 2015
Worked in developing a business development tool to help the customers to connect and make connections with different people.
Was a Quality Controller for 3 months, as was to make sure that the quality of the work was checked.
We mainly worked on the six degrees of separation model, so that building networks and doing business was a lot easier.
PROJECT WORK:
Billing Testing Optimization using DMAIC Process
Term paper project to reduce the system testing cycle effort, schedule vibration and Reducing the time in system testing reduces the cost for testing, Process Optimization results in increased productivity and Increase in team morale and reduces attrition.
Automation Systems- Use of Programmable Controllers (PLC’s) in Cold Test of Engines
Investigation of how PLC frameworks are utilized as a part of Engine Pallet trafficking to and from Cold Test cells, interface between Test framework and part introduction machine control, Engine Tracking inside the generation framework in view of Engine Unique Number (EUN) and Dynamic change of Test parameters considering the present model of the Engine test.
ORGANIZATION:
Member of Society of Automotive Engineer.