CURRICULUM
Pratap Vihar Ghaziabad UP.
Mobile – +91-965*******
e-mail : **********@*****.***
***************@**********.***
Mohammed Mustaque
OBJECTIVE
Seeking a MEP Coordination position in your reputed with willingness to take up challenges.
To associate with progressive organization that gives. Me scope to apply my knowledge skills along with my hard patience.
To work in the competitive world with zeal to excel and the temperament to succeed,
Utilize my ability and my confidence for the benefit of the organization.
ACADEMIC QUALIFICATION :
Examination Passed
Name of Board
Year
Division
BA Passed
JP Univercity,Chapra Bihar
1996
Ist.
TECHNICAL QUALIFICATION
1In 1991- ITI in Mech. Draughtsman ship from Khedan Prasad yadav govt. polytechnic Marhoura chapra Bihar.
2Passed Diploma in Mechanical Engineering from Govt. Polytechnic, Muzaffarpur, Bihar in the year 1999
Software Skills
AutoCAD 2007, 2008 & 2016, Mac Quay : Duct & Pipe Sizing
Good knowledge of Microsoft excel & word
First Aid Training from Dubai
MEP REVIT Ver.2015 Basic
Job Responsibilities(Design & Drafting)
Preparation of MEP Coordination Drawings
preparation sectional details &Schematic Drawing of MEP Services.
Preparation of MEP Builder work .
Preparation of Equipment installation Details / Plant’s layout / foundation / support Details.
Preparation of HVAC/ Electrical /Plumbing / Fire Freighting Drawing.
Chilled Water Schematic & VRV Schematic Diagram,
Chilled Water Plant room Layout. Equipment selection,
Calculation for Lift Lobby & lift well Pressurization Diagram,
Heat Load Calculation (HAP 4.5)
Duct Design as per SMACANA.
Bill of QTY & Bill of Metrical of MEP .
CSD Drawing (Combined Service Drawing)
Preparation of Lighting Layout
Preparation of cable Tray and rench Layout
Security System Layout
Preparation of soil and waste pipe Layout
Preparation of Fire Fighting Layout
Preparation of Lighting Layout
Fire Detection & Alarm system Layout
DG Room Layout
Electrical Single Line Diagram
Design & Preparation of Electrical sub-station layout
Calculation Stair case pressurization Diagram,
All type Ventilation of ducting layout,
Strong technical and Methodical aptitude with ability to analyze & Coordinate with related department / Services
Grill & Diffuser selection, Proper distribution of air, Preparation of tender drawings for air conditioning system,
Preparation of BOQ HVAC System.
Preparation schematic HVAC System, Sectional drawings,
Builder works drawings & As- built drawings.
Designing & Drafting HVAC system Drawing,
Principle Accountability For MEP Coordinator
* To Coordinate With other discipline Engineering staff and Contractor’s MEP
Coordinator’s/ Engineering Staff on all aspects of MEP work, to ensure proper
coordination among different MEP Discipline and also with Architectural &
Structural.
To supervise and monitor the preparation of Co-ordination Drawing to ensure that all services are coordinated with orther and also with building structure, Architectural features and Interior finishes.
To supervise and monitor the preparation of builder’s work drawing to ensure that provisions for all services are incorporated and coordinated with each other and also with building structure and Interior finishes
Monitor & timely advice the project Manager / Project Engineer on any anticipated conflict / Coordination Problems.
Preparation of as built coordination drawings on completion of works in Respective areas.
Monitor of MEP CAD Team and solve problem in cad/ Technical issue/ quality of drawing.
Maintain of CAD Standard .
PROJECTS HANDLED
Proposed software park for AZTECH Soft(A Mind Tree Company)
Proposed IT Building at Unitech IT Park, Gurgaon.
Medicity Hospital, Gurgaon.
Fortis Hospital, Gurgaon
Integrated Health Center & Workers Hospital, Doha Qatar
Doha Qater Airport
Kapenski Hotel Oman.
KAMPAC OIL M.E FZCO PO BOX 61396 DUBAI UAE
Riyadh Under Ground Metro Project (3F1)
LMRC Under Ground Metro Project – Chaoudhary charan Singh Station
Existing Plan of W.H.O Building at Indraprastha, New Delhi.
Carrefour Mall,Gurgaon.
Carrefour Mall,silampur New Delhi
Carrefour Mall,jaipur
Carrefour Mall, Agra.
Haiderghardhsugger mill.
MRC, Chennai
Wave Estate, Mohali
DLF Magnolia-2, Gurgaon
BNRI,Calcutta
DLF Magnolia’s,Gurgaon
Ascends IT Park,Pune
EXPERENCE PROFILE 14+year (Incl. 6 year in Gulf)
MEP System for various Project. Residential/Commercial Building, Metro Project, Hospital, Complex, I.T Building, Shopping Mall & Hotel. Car parking Power projects,
Corodex Group, Noida UP
Designation for: - MEP Coordinator Cum Team Leader MEP CAD
From 30 August 2016 to Till Date
M/S VOLTAS OMAN LLC
Designation for: - MEP Coordinator ( Contract Base-8month)
From 28 april .2016 to 26 DEC. 2016
M/S M ercury Mena Electromechanical Doha Qatar
Designation for: - MEP Coordinator ( Contract Base-1Year)
From 7th March. 2015 to 27 april .2016
M/S MEINHARDT INDIA PVT. LTD. (MEP PLANNING & ENGINEARING)
CONSULTANT SECTOR – 16 NOIDA UP
Designation for: - MEP Draughtsman \Cum Team Leader HVAC
From 7th Sep. 2011 to 1March 2015 date
Worked With M/s Engineering Solution HtBurda Media Ltd, Greater Noida (sister Concern of Liebert Germany .As A MEP Draughtsman
From 10th. Oct.2009 To 6 th/September 2011
Worked with M/s Spectral Services Consultants Pvt.Ltd,(Aecom) Noida 62 As A Sr.Hvac Draughtsman From 10/04/2008 to 08/10/2009
Worked with M/s McQuay International Dubai UAE As a Sr. HVAC Draughtsman From 12/04/2004 to 01/04/2008 For Kampac OIL M.E FZCO offshore company
Worked with M/s Larson & Toubro, Kasturba Gandhi Marg New Delhi As Hvac Draughtsman From 15/04/2003 to 05.04.2004
PERSONAL DETAILS:-
Name : Mohammed Mustaque
Father’s Name : Mr. Mohammed Jan
Date of birth : 9th Nov. 1977
Nationality : Indian
Passport No. : M2629900
Date of Expiry : 24/09/2024
Marital status : Married
Total Experience : 14Years
Gulf Experience : 6 Years
Indian Experience: 8 years
SKYPE ID : must_1973
Notice Period : 0
I KINDLY REQUEST YOU TO LOOK INTO MY APPLICATION AND GIVE ME A CHANCE TO WORK IN YOUR PRESTIGIOUS ORGANIZATION.
THANKING YOU,
(Mohammed Mustaque)