Name: Heinrich
Surname : Brune
Marriage Status: Single
ID No: 640**********
Qualifications: Olifantsfontein Trade Test A+ (Boilermaker)
NTC3 Welkom Technical College
Tel No: 083*******
Work History
1.Harmony Gold Mine
1981 - 1987
Position: Apprentice until 14-05-85 thereafter, boilermaker
Maintenance of conveyors, chutes, pump stations on Number 2 shaft.
Shaft sinking: Installation of steelwork in Harmony 4 shaft.
2.Boart Exploration Services
1988-1989
Position: Supervisor then night shift foreman
Supervision of 12 underground diamond drilling teams, and responsible for logging of all shaft and geology reports.
Responsibilities included: Exploration core drilling, cover drilling for shaft sinkers, sealing of fissures with high pressure pumps.
3.Cullinan Refractories
1989 - 1991
Position: Boilermaker.
Boilermaker, maintenance on rotary kilns, chutes, hoppers, skips and workshop work.
4:Ruto Mills
1991 – 1994
Boilermaker and do fitter jobs.
Maintenance of silo, elevators, conveyor belts and screens.
Silo management, grain grading, fumigation course done while working at ruto mills.
5.Diamond Works
LUO PROJECT ANGOLA
1996 - 1997
Position: Construction and maintenance foreman, 2IC to P Wright
Renovation & commissioning of existing 120 TPH pre-treatment plant, construction & commissioning of new 50 TPH DMS & Recovery plant.
After final commissioning, responsible for spares forecasting & maintenance of entire plant until transferred to Yetwene Project as 2 IC to W Pienaar
YETWENE PROJECT ANGOLA
Position: Construction and maintenance foreman 2IC to W Pienaar.
Construction & commissioning of new 120 TPH Pre-treatment plant; 50 TPH DMS plant; Containerized X Ray Recovery plant ; and Plant Water supply pump station with all associated pipework.
After final commissioning, responsible for spares forecasting & maintenance of entire plant reported to mine manager Alan Thomas.
.
6. Eicon Engineering
1998 for 5 months to build plant
6 months to build plant with material on site.
Position: Construction foreman Angola
Construction of 40 tph Pretreatment plant at Luzamba Angola,
Maintenance of 100 tph Pretreatment and 20 tph DMS plant at Cuango,
7. Venetia De Beers
1999 - 4 months to refurbish final recovery
Position: Boilermaker.
Maintenance of 80 tph final recovery plant at Venetia mine Messina
8. Bateman
2000 - 6 months to build plant and commision.
Position: Construction supervisor Supervised the construction & commissioning of the third 200 tph DMS plant to be built in Siberia, Russia for Bateman.
9. DRA
Position: Supervisor (working)
2000 - 3 months to get construction back on schedule for plant.
Fabrication of all pipework (Steel and HDPE pipes) routing and installation of all pipelines for a100 TPH Feed-prep and 50 TPH DMS plant.
10. SKELTON & PLUMMER
2001 - 2003
Position: Supervisor later Site Manager, appointed 261 responsible person for site.
South Deep Shaft: Construction and commissioning of clarification plant.
Turfontein Shaft, Anglo Rustenburg: Construction and commissioning of new 1km long conveyors.
Anglo Rustenburg,: Construction and commissioning of Reagents Plant.
Waterval smelter, Construction of Phoenix Reagents plant.
Rustenburg Base Metal Refineries: Construction of building for boiler no 6 and installation of boiler pipe work.
11. Diamond Works/Koidu Holdings
2003-2004
Koidu Kimberlite project Sierra Leone
Position: Site foreman (Working)
Construction and commissioning of pretreatment crushing plant, high separation media plant, and final recovery plant in Sierra Leone.
12. ADP Projects
2006 - 6 months to build and commission plants.
Sierra Leone
Position: Site Foreman (Working)
1 Construction of final recovery and three mobile washing plants in Koidu Sierra Leone.
13. Amandla / Metix Malaysia
2015 – 2016 Construction furnace in Malaysia
Position: Supervisor workshop fabrication and rectifying steelwork and dayworks, later site work to finish project.
Senior supervisor Theo Swanepoel 072*******