Post Job Free

Resume

Sign in

Construction Engineer

Location:
Batangas, CALABARZON, Philippines
Posted:
September 22, 2017

Contact this candidate

Resume:

Curriculum Vitae

AMADO S. LASTRA

Hinabuyan, Villaba, Leyte

Mobile # 094********

Position Desired : Plant Operator / or any position that fits my qualification

Objective : To accept all assignment and instruction of my superior

Qualifications : 12 years experience in Civil Construction.

15 years experience Boiler Plant Operation

WORK EXPERIENCE:

1.Site Engr. (Sept 2015 up to August 11, 2016)

VT Laguyo Construction Incorporated

Field Office: Salcedo, Eastern Samar

UNDP Project: Mercedes, Eastern Samar

Responsible to check the exact lay out of the project as per foundation plan. Inform to superiors about the manpower utilization scheduling, tools utilization schedule, construction methods before the start up of the construction. Estimates the quantity of the construction materials such as cement, sand gravel, steel bars, coco forms, plywood, nails, tie wires and etc. Closely monitoring the workers about their job assignment to clarify their ability. Make daily accomplishment reports. Conduct meeting to create good relation to workers, Safety and Housekeeping-reports. Conduct meeting to create good relation to workers, Safety and Housekeeping-follow and obey the company rules and regulation.

2.Project incharge (July 10, 2013 to April 30, 2014 S.I.S Marketers/builders, 2nd floor Starmall, Albang, Muntinlupa City

Ocular inspection of the project site elevation, to clarify the exact amount of the Housing Project. Make estimates for materials needed for the start up the construction; cement, sand, gravel, steel bars, chb, etc. Advice foreman about the manpower scheduling, tools utilization; Safety. Rules and Regulation of the Project Site. During lay out, plans specification. Make accomplishment report for progress billing. Estimate target completion date. During turn over, see to it that the client must satisfy their project. Leave work area in a proper housekeeping.

3. Construction Foreman (Feb. 2013 to June 2013)

JMT/EEI (uptown mall project)

Responsible and maintain exact dimension of form works, Scaffolding, Aluma metal framing, Penolic for slab form.

Monitoring of carpenters capability to ensure the specific plans form condition.

Inspect the tightening of Aluma clamp.

Responsible to make forms of beams, girders at exact methods.

Columns & Beams must be fix & tight with tie rod.

Before pouring, see to it that all areas are clean and permanent shoring install while curing period of slab.

Proper Housekeeping.

4. Proprietor / Supervisor (Amado S. Lastra Construction)

(2001 up to 2011)

Attend bidding any Government Projects, school buildings, road concreting, box culvert and submit estimates lower than the approved budget cost of the Municipal Engineer.

Make estimates of the construction materials needed such as sand, gravel, cement, steel bars, hollow blocks especially in building construction.

Responsible to give instruction, observation of the skilled workers about the construction methods, seminars, supervision, leadership to create good productivity and relationship to others.

Supervise the carpenters, mason, welders and laborers their efficiency to do their job assignments plastering, carpentry, welding.

Make a diagram for the target of the project completion for labor cost budgeting. So that I know the percentage of the profit.

Leave work area with proper housekeeping.

5. Boiler Control Room Operator Duties and responsibilities

1997-1999 (Philphos Corporation)

Entries the logbook the manpower on duty in the shift operation

Check the control panels pilot light, Pressure indicator, Temperature indicator controller, Flow indicator, if found different field indication of field instruments, instrument technician is responsible to repair.

Responsible to start up/shutdown of the boiler.

Monitors all process variable in Boiler Operation.

Maintain high pressure steam at 41 kg/cm g – at 380 c, so that no condensate hammering inside the steam line.

Maintain exact pressure to drive turbine for start-up of Sulfuric Acid Plant.

Responsible to maintain dearator and upper drum level when Boiler is operated.

Regulate firing of fuel oil maximize coal firing to minimize fuel cost.

Fired boiler with an excess air to avoid air pollution.

Informed Supervisor for the equipment abnormalities.

Follows Company Rules and Regulation.

Record the boiler water consumptions, fuel, and steam production, as required for our superior about the production report.

Hourly monitoring of the boiler water analysis at lest 8.5 – 10.5 ph, to prevent corrosion and scaling of the boiler bank tubes

Coordinate the fieldmen about the problem of operation so that they closely monitoring the equipment of instruments at the field area

Leave work area when properly relieve

6. Utilities Water Treatment (Lime as Neutralizing agent)

Sea Water is the cooling medium of the Plant Operation, therefore it is our duties to maintain the sea water return at exact p. h. to avoid pollution at sea water. Every shift of operation, be sure to know the result from the Quality Control about the sample of the Sea Water return. During operation, contract workers maintain the pouring of Lime manually at 60 bags/hr. as recommended by the Quality Control, to be pour at the sea water return. Hourly coordinate the p. h. at sea water return to prevent pollution at sea water, so that increase/decrease the dosage of lime needed. Monitor closely the worker how they perform the job at the exact quantity of lime to be pour at the screen mess, top to canal of the sea water return line. Sampling point should be located near the seashore return line, so that it can be easily determine how the lime reacts well Safety goggles and gloves necessary when handling this material, to prevent damage any art of the body.

7. Boiler Field Operator Duties and Responsibilities

1984-1987

Check desecration process.

Check fans operation.

Monitor BFW pumps operation.

Responsible to check fuel oil heating station/electric heater.

Operate coal handling facilities.

Responsible to light on the burners.

Responsible to start stoker grate operation.

Conduct intermittent blow down when boiler water is acidic and more silica content.

Coordinate control room operator the situation of field instruments.

Conduct sampling.

Maintain chemical injection to upper drum water and boiler feed water.

Assist maintenance for mechanical repairs.

Maintain good housekeeping in the work area.

8. Apprentice Marine Engineer (Gabisan Shipping Lines)

March 1981-May 1983

Responsible to record start/ stop engine operation.

Entries log sheet engine parameters.

Check Cooking System of an Engine.

Refill oil lubrication for engine.

Check propellers alignment.

Engine operation trouble shooting.

Assist mechanic in engine overhauling.

PERSONAL DATA

Age : 54 year old

Sex : Male

Height : 5’2”

Weight : 130 lbs.

Birthday : March 11, 1961

Govt. Exam Passed : Fourth Marine Engineer

Board Rating : 79.1%

Date Taken : September 1990

SEMINARS ATTENDED

1.Phase I – College Refreshers Course (September 1983)

2.Phase II – Manpower Source Training Development Program (November 1983- February 1984) PHILPHOS Training Center.

3.NALCO’s Course for boiler Operator. PHILPHOS Training Center

4.FIRSTY AID AND SAFETY SEMINAR – March 1985. PHILPHOS Complex

5.Plant Visit Seminar – March 5 – 10, 1985. National Power Corp. Naga, Cebu City

6.TEAM BUILDING SEMINAR – August 1985 PHILPHOS Complex.

REFERENCES

1.Gilda Aragon

Brgy. Chairwoman, Hinabuyan, Villaba, Leyte

2.Ciriaco T. Honor

Shift Supervisor PHILPHOS

3.Orlando Romero

Municipal Engr, Villaba, Leyte



Contact this candidate