RESUME
ONKAR RAJENDRA GOLANDE
A) QUALIFICATIONS:
1. Educational Details
Bachelor Of Engineering in Instrumentation & Control
(June 2013)
2. Total Experience 4 Years experience in FAS,ACS,CCTV & BMS. B) SKILLS PROFILE:
1. FAS/ACS/CCTV/
BMS System
FAS-Honeywell XLS-1000,XLS-3000.’
BOSCH-FPA5000
TYCO-Simplex 4100ES,4100U.
GE-EDWARDS-EST3,EST3X.
Ravel-125GR.
FAS Suppression-TYCO Inergen 200 Bar,FM 200.
Vesda-Xtralis-VLP,VLF .
CCTV-Analog/Digital Camera-TYCO-ADT,BOSCH,Hikvision. ACS-BOSCH-BIS,TYCO-Software House,CEM,Rossalare.
Building Management System- Honeywell TREND,Automated Logic VAV Controller.
Other- Water Leak Detection-VAMPEX,Sonic. Rodent
Repellent System, Public Address System.
2. PLC/DCS SCADA
Honeywell PLC-ML200,Safety Manager
Honeywell DCS-C300(HARDWARE)
Honeywell HMI Display Builder
3. Interfaces MODBUS, BACNet .
4. Field Instrumentation
Engineering / Packages
Usage
Installation, Testing & Commissioning of,
- Fire & Gas System
- Building Management System
- Access control System
- CCTV System
Page 2 of 11
5. Process Domains
Gas & Oil Processing plants,Cement Industries,Defence Sector, Data Centre, Corporate Buildings, Chemical Industries Govt Refineries.
6. Databases MS Excel.
7. Productivity &
Continuous
Improvements
Eager to learn new systems platforms.
Page 3 of 11
C) EXPERIENCE DETAILS (In chronologically reverse order): C4> Vaibhav Tech Solutions PVT Lmtd Pune April-2017 - Till Date Project: Adlabs Imagica
End User Imagica
Work Location: Khopoli Duration: Jul-2017 Position: Design Engineer Platforms BOSCH Fire Alarm System
Responsibilities
Addition of Fire Alarm device in BIS Platform
Addition of Fire Alarm device in OPC Platform.
Addition of Fire Alarm device in Naiagara Platform. Special Aspects
of the
Project/Work
Successfully completed site activity with timeline
.
Project: BCT-Muldwarka,Gujarat
End User Ambuja Cement Ltd
Work Location: Pune Duration: May-2017 Position: Design Engineer Platforms BOSCH Fire Alarm System
Responsibilities
Site Survey
Study client inputs
Detailed Engineering design and documentation for Fire Alarm System
Preparation of Technical offer
Special Aspects
of the
Project/Work
Successfully delivered all the documents with timeline
.
Project: ARDE
End User ARDE,Pune
Work Location: Pune Duration: Apr-2017 Position: Design Engineer Platforms BOSCH CCTV System
Responsibilities
Site Survey
Design of CCTV with help of Google Earth
Detailed Engineering design and documentation for CCTV
Preparation of Technical offer
Special Aspects
of the
Project/Work
Successfully delivered all the documents with timeline
.
Page 4 of 11
C3> G K Controls PVT Lmtd Pune Oct-2015 - Till Date Project: DYNA Filters Pvt. Ltd .Pune
End User Bharat Electronics Limited,Bangalore
Work Location: Banglore Duration: Jan-2016 Position: Project Engineer Platforms
Honeywell Trend SET (System Engineering Tool )
Responsibilities
Detailed Engineering design and documentation for Building Management System.
Prepared Bill of Material as per I/O Summary Requirements Prepared following deliverable as per customer requirements
Detail Wiring Diagram.
Creating IO Points in Trend System Engineering Tool
Develop Logic as per sequence of operation
Graphics for AHU on Trend Supervisor 963.
Special Aspects
of the
Project/Work
Successfully delivered all the documents with timeline
BMS Integration with Fire Alarm System.
Successfully Complete Site Acceptance Test on Time
.
Project:
Kuwait Natural Petrochemical Company (KNPC-MAA-FAR) CFP on F& G Systems
End User Kuwait Natural Petrochemical Company (KNPC) Work Location: Honeywell
GS-HPS, Pune.
Duration: Nov-2016 to Till
Date
Position: Project Engineer
Platforms Honeywell XLS 3000
Responsibilities
Detailed Engineering design and documentation for Fire Alarm System & Gas Suppression System (GSP) .
Input Study, Raising Technical Queries.
Prepared following deliverable as per customer requirements
Update IO Assignments as Per Updated Block Diagram &Layout.
Update SLC Loop Drawing as Per FAT Comments/Markups
Update General Arrangement &Wiring as Per FAT/SIT Comments/Markups
Update Communication Page as per Updated Fiber Connection Drawing
Special Aspects
of the
Project/Work
Scope of the Projects include 25 Fire Alarm (XLS3000) &Gas Suppression System(XLS0140-2) Panels
Integration with Fire Alarm System with Gas Suppression System.
Integration with HVAC,Safety Manager
All are in XLS Network
Page 5 of 11
Project: Fire Alarm Control Systems-Zuluf
End User Saudi Aramco
Work Location: Honeywell
GS-HPS, Pune.
Duration: Oct-2016 to Nov-
2016
Position: Project Engineer
Platforms Honeywell XLS 3000
Responsibilities
Detailed Engineering design and documentation for Fire Alarm System .
Input Study, Raising Technical Queries.
Prepared following deliverable as per customer requirements
Instrument Loop wiring Drawing- Typical Installation wiring For Each Device,Modules.
Battery Calculation- As per FAS panel devices load, required battery backup calculated for stand by 24 hours operation as per NFPA Standards.
.Cable Schedule-For Field Device and Inside Cabinet Signal and Power Cable
SLC Loop Drawing- Detailed device to device loop and wiring details prepared with all Smoke Detectors,Modules .
Preparation of FAT Procedure
Special Aspects
of the
Project/Work
Scope of the Projects include 5 Fire Alarm (XLS3000) Panels
Dual redundant Modbus network with MFACP.
All are in XLS Network
Integration with DCS System
Project:
Kuwait Natural Petrochemical Company (KNPC-MAB1) CFP on F& G Systems
End User Kuwait Natural Petrochemical Company (KNPC) Work Location: Honeywell
GS-HPS, Pune.
Duration: April-2016 to Till
Date
Position: Project Engineer
Platforms Honeywell XLS 3000
Responsibilities
Detailed Engineering design and documentation for Fire Alarm System .
Input Study, Raising Technical Queries.
Prepared following deliverable as per customer requirements
IO Assignment- Study Cable Block loop Diagram,Detection Layout and Cause &Effect Matrix for Preparation.
Battery Calculation- As per FAS panel devices load, required battery backup calculated for stand by 24 hours operation as per NFPA Standards.
Bill of Material – Document prepared for 19 nos. of XLS 3000 panel by considering all the devices, PSU’s, third party integration devices and all required accessories.
SLC Loop Drawing- Detailed device to device loop and wiring details prepared with all Smoke Detectors,Modules
Preparation of Datasheets for Device
Preparation of Function Design System
Preparation of Factory AccepetanceTest Procedure Page 6 of 11
Special Aspects
of the
Project/Work
Scope of the Projects include 19 Fire Alarm (XLS3000) Panels
Dual redundant Modbus network with MFACP.
All are in XLS Network
Integration with Safety Manager
Project: Closed Circuit Television(CCTV)
End User Super Auto India Ltd
Work Location: Chakan Pune Duration: Jan-2016 Position: Project Engineer Platforms GEBIX Analog DVR
Responsibilities
Survey the Site and Analyse End user Requirement
Supervise site installation activity & provide guidance to technician team for installation of CCTV system.
Commissioning of CCTV System Commissioning Dome
Camera,Bullet Camera Configuration,DVR Configuration. Special Aspects
of the
Project/Work
Successfully completed the site acceptance test within a time. Project:
Kuwait Natural Petrochemical Company (KNPC) HALON on F& G Systems
End User Kuwait Natural Petrochemical Company (KNPC) Work Location: Honeywell
GS-HPS, Pune.
Duration: Nov-2015 Position: Project Engineer
Platforms
Honeywell XLS 3000
Honeywell VESDA System
Responsibilities
Detailed Engineering design and documentation for Fire Alarm System.
Input Study, Raising Technical Queries.
Prepared following deliverable as per customer requirements
IO Assignment- Study Cable Block loop Diagram,Detection Layout for Preparation.
SLC Loop Drawing - Detailed device to device loop and wiring details prepared with all device.
Quality Check of Vesda Drawings from IDP File.
Special Aspects
of the
Project/Work
Successfully delivered all the documents with timeline
Dual redundant Modbus network with MFACP.
All are in XLS Network
.
Page 7 of 11
C2> Organization Name: Tyco Fire & Security (I) Pvt. Ltd (Payroll-Cosmos Innovations) September 2014-August 2015
Project: Integrated Building Management System
End User Allstate Solutions Pvt. Ltd.,Pune
Work Location: Pune
Duration: May-2015 to
August 2015
Position: Project Engineer
Platforms
GE Edward-Est-3X Fire Alarm System, Tyco CEM 300 Access Control System, Sony CCTV system.
Responsibilities
Procurement Follow up with Procurement Team.
Supervise site installation activity & provide guidance to technician team for installation of FAS,ACS and CCTV System.
Commissioning of FAS EST3X System with 2 Loops,100+ Devices in each Loop,Integration with ACS,HVAC,PA System.
Commissioning of ACS- CEM 300 configuration server with CEM Controller,Door Confuguration,Access Card Configuration.
Commissioning Support for Sony IP CCTV System with Dome Camers, NVR, Network Switch.
Preparation for As Built Drawing for FAS,ACS,CCTV System. Special Aspects
of the
Project/Work
Successfully completed the site acceptance test within a time.
Integration of FAS With ACS,HVAC,PA System
Project: Integrated Building Management System
End User Accenture Services Pvt. Ltd, Pune
Work Location: Pune
Duration: Nov-2014 to June
2015
Position: Project Engineer
Platforms
GE Edward-Est-3 Fire Alarm System, Tyco Software House Access Control System, Tyco ADT CCTV System,Honeywell Trend BMS System,Vampex WLD System,Tyco Inergen System,Bosch Plena PA System.
Page 8 of 11
Responsibilities
Procurement Follow up with Procurement Team.
Supervise site installation activity & provide guidance to technician team for installation of
FAS,ACS,CCTV,BMS,Inergen,WLD System
Commissioning of FAS EST3 System 4 FACP each 3 Loops,1200+ Devices .Integration with ACS,HVAC,PA System.Networked All FACP.
Commissioning Support and Testing ofACS- Tyco Software House Controller Configuration,Reader Configuration.Preparation of Commissioning Sheet,IP Configuraation of Controller.
Commissioning Support and Testing for Honeywell Trend BMS System For 14 AHU,28 DDC Panel,Modbus Integration with UPS,PAC,Energy Meter.
Commissioning of Tyco ADT CCTV System, 135 Dome Camera,12 DVR Configuration,Integration of DVR to Network,Display all Cameras in RMS Software.
Commissioning and Testing of Tyco Inergen System with Ravel 125GR FAS System,Pressure Testing of Inergen
Sytem,Integration with GE-EST3 FAS Sytem.
Commissioning of Vampex WLD Sytem with 4 Zone Panel.
Preparation for As Built Drawing for
FAS,ACS,CCTV,BMS,WLD,INERGEN System.
Special Aspects
of the
Project/Work
Successfully completed the site acceptance test within a time.
Integration of FAS With BMS,ACS,HVAC,PA System
Modbus Interface For BMS Integration of UPS,PAC,Energy Meter.
Project: Fire Alarm System
End User CIPLA
Work Location: Kurkumbh Duration: Sep-2014 Position: Project Engineer Platforms
Tyco Simplex 4100 ES Fire Alarm System
Bosch Plena Public Address System
Responsibilities
Supervise site installation activity & provide guidance to technician team for installation of FAS system, PA System.
Installation of Explosion Proof Device
Commissioning of FAS System Tyco 4100ES,Integration with PA System
Preparation Final As Built Drawings.
Special Aspects
of the
Project/Work
Successfully completed the site acceptance test within a time.
FACP Integration with Pubic Address System.
Page 9 of 11
C1> Organization Name: Horizon Automation-August 2013-August 2014 Project: Fire Alarm System
End User CARGIL India
Work Location: Kurkumbh Duration: Jul-2014 Position: Project Engineer Platforms
Tyco Simplex 4100 ES Fire Alarm System
Bosch Plena Public Address System
Responsibilities
Supervise site installation activity & provide guidance to technician team for installation of FAS system, PA System.
Installation of Explosion Proof Device
Commissioning of FAS System Tyco 4100ES,Integration with PA System
Special Aspects
of the
Project/Work
Successfully completed the site acceptance test within a time. FACP Integration with Pubic Address System.
Project: Fire Alarm System
End User CUMMINS INDIA
Work Location: Pune Duration: April-2014 Position: Project Engineer Platforms
Tyco Simplex 4100 S Fire Alarm System
Bosch Plena Public Address System
Responsibilities
Supervise site installation activity & provide guidance to technician team for installation of FAS,PAS system.
Commissioning of FAS System Tyco 4100ES,Integration with HVAC,Sprinkler System.
Commissioning of Bosch Plena PASystemWith Controller,Router.
Preparation Final As Built Drawings.
Special Aspects
of the
Project/Work
Successfully completed the site acceptance test within a time. FACP Integration with HVAC,Sprinkler System.
Project: Fire Alarm System
End User Panchshil Properties
Work Location: Pune Duration: Feb-2014 Position: Project Engineer Platforms
Honeywell XLS 1000 Fire Alarm System
Bosch Plena Public Address System
Responsibilities
Supervise site installation activity & provide guidance to technician team for installation of FAS,PAS system.
Commissioning Support and Testing of FAS System Honeywell XLS 1000,Integration with HVAC,Sprinkler System.
Page 10 of 11
Special Aspects
of the
Project/Work
Successfully completed the site acceptance test within a time. FACP Integration with HVAC,Sprinkler System.
Project: Building Management System
End User Synechron
Work Location: Pune Duration: Nov-2013 Position: Project Engineer Platforms
UTC-Carrier Race-Automatic Logic ZN141+ VAV Controller Bacnet Network.
Responsibilities
Supervise site installation activity & provide guidance to technician team for installation of VAV system.
Commissioning Support and Testing of VAV System Automatic Logic ZN141+ VAV Controller Configuration,Thermostat Configuration,VAV Controller Calibration,Troubleshooting.
Preparation Final As Built Drawings.
Special Aspects
of the
Project/Work
Successfully completed the site acceptance test within a time.
Total 140 VAV Controller and Thermostat work Bacnet MSTP Network.
Project: Mimic Panel for Simulator Box
End User Arya Omani Tollaway Services Ltd
Work Location: Pune Duration: Oct-2013 Position: Project Engineer Platforms Honeywell HMI Display Builder
Responsibilities
Design of Mimic Panel, Hardware / Panel Engineering (Panel wiring, Installation), Testing of Mimic Panel Devices.
Prepare Drawing Of Mimic Panel using Honeywell Display Builder Special Aspects
of the
Project/Work
Successfully completed the site acceptance test within a time. Project: Flare Gas Recovery System,
End User BPCL, Mumbai.
Work Location: Pune Duration: Sep-2013 Position: Project Engineer Platforms Honeywell C300 DCS
Responsibilities
Hardware Engineering (Cable Termination),Ferruling
Preparation of Ferrule for DCS System
Page 11 of 11
D) PROFFESSIONAL TRAININGS / WORKSHOPS / PRESENTATIONS ATTENDED: Workshop Details Organized By Location Year
Training Workshop on
TYCO Fire Alarm System
TYCO Fire & Security Pune 2014
Training Workshop on
TEXECOM Intrusion
System
TEXECOM Pune 2016
Training Workshop on
ROSSLARE Access Control
System
ROSSLARE Pune 2017
Training Workshop on
Design and Estimation
Fire Alarm System
BOSCH Banglore 2017
Training Workshop on
Hands on BIS
Platform(ACS,FAS,CCTV)
BOSCH Banglore 2017
Training Workshop on
Hands on BOSCH PAVIRO
DIGITAL PA SYSTEM
BOSCH Banglore 2017
E) PERSONAL DETAILS:
Date of Birth 31-08-1989
Gender Male
Nationality Indian
Marital Status Married
E-Mail ID ac2cp7@r.postjobfree.com, ac2cp7@r.postjobfree.com Passport Details
Passport Number Z2415600
Date of Expiry Jul-2024
Address
A/P Uruli-Kanchan, Near B G Shirke School,Tupe Wasti,
–Tal-Haveli Dist-Pune Maharashtra India.
Contact Phone No. +91-878*******,902-***-****