RESUME

ONKAR RAJENDRA GOLANDE

A) QUALIFICATIONS:

1. Educational Details

Bachelor Of Engineering in Instrumentation & Control

(June 2013)

2. Total Experience 4 Years experience in FAS,ACS,CCTV & BMS. B) SKILLS PROFILE:

1. FAS/ACS/CCTV/

BMS System

FAS-Honeywell XLS-1000,XLS-3000.’

BOSCH-FPA5000

TYCO-Simplex 4100ES,4100U.

GE-EDWARDS-EST3,EST3X.

Ravel-125GR.

FAS Suppression-TYCO Inergen 200 Bar,FM 200.

Vesda-Xtralis-VLP,VLF .

CCTV-Analog/Digital Camera-TYCO-ADT,BOSCH,Hikvision. ACS-BOSCH-BIS,TYCO-Software House,CEM,Rossalare.

Building Management System- Honeywell TREND,Automated Logic VAV Controller.

Other- Water Leak Detection-VAMPEX,Sonic. Rodent

Repellent System, Public Address System.

2. PLC/DCS SCADA

Honeywell PLC-ML200,Safety Manager

Honeywell DCS-C300(HARDWARE)

Honeywell HMI Display Builder

3. Interfaces MODBUS, BACNet .

4. Field Instrumentation

Engineering / Packages

Usage

Installation, Testing & Commissioning of,

- Fire & Gas System

- Building Management System

- Access control System

- CCTV System

Page 2 of 11

5. Process Domains

Gas & Oil Processing plants,Cement Industries,Defence Sector, Data Centre, Corporate Buildings, Chemical Industries Govt Refineries.

6. Databases MS Excel.

7. Productivity &

Continuous

Improvements

Eager to learn new systems platforms.

Page 3 of 11

C) EXPERIENCE DETAILS (In chronologically reverse order): C4> Vaibhav Tech Solutions PVT Lmtd Pune April-2017 - Till Date Project: Adlabs Imagica

End User Imagica

Work Location: Khopoli Duration: Jul-2017 Position: Design Engineer Platforms BOSCH Fire Alarm System

Responsibilities

Addition of Fire Alarm device in BIS Platform

Addition of Fire Alarm device in OPC Platform.

Addition of Fire Alarm device in Naiagara Platform. Special Aspects

of the

Project/Work

Successfully completed site activity with timeline

.

Project: BCT-Muldwarka,Gujarat

End User Ambuja Cement Ltd

Work Location: Pune Duration: May-2017 Position: Design Engineer Platforms BOSCH Fire Alarm System

Responsibilities

Site Survey

Study client inputs

Detailed Engineering design and documentation for Fire Alarm System

Preparation of Technical offer

Special Aspects

of the

Project/Work

Successfully delivered all the documents with timeline

.

Project: ARDE

End User ARDE,Pune

Work Location: Pune Duration: Apr-2017 Position: Design Engineer Platforms BOSCH CCTV System

Responsibilities

Site Survey

Design of CCTV with help of Google Earth

Detailed Engineering design and documentation for CCTV

Preparation of Technical offer

Special Aspects

of the

Project/Work

Successfully delivered all the documents with timeline

.

Page 4 of 11

C3> G K Controls PVT Lmtd Pune Oct-2015 - Till Date Project: DYNA Filters Pvt. Ltd .Pune

End User Bharat Electronics Limited,Bangalore

Work Location: Banglore Duration: Jan-2016 Position: Project Engineer Platforms

Honeywell Trend SET (System Engineering Tool )

Responsibilities

Detailed Engineering design and documentation for Building Management System.

Prepared Bill of Material as per I/O Summary Requirements Prepared following deliverable as per customer requirements

Detail Wiring Diagram.

Creating IO Points in Trend System Engineering Tool

Develop Logic as per sequence of operation

Graphics for AHU on Trend Supervisor 963.

Special Aspects

of the

Project/Work

Successfully delivered all the documents with timeline

BMS Integration with Fire Alarm System.

Successfully Complete Site Acceptance Test on Time

.

Project:

Kuwait Natural Petrochemical Company (KNPC-MAA-FAR) CFP on F& G Systems

End User Kuwait Natural Petrochemical Company (KNPC) Work Location: Honeywell

GS-HPS, Pune.

Duration: Nov-2016 to Till

Date

Position: Project Engineer

Platforms Honeywell XLS 3000

Responsibilities

Detailed Engineering design and documentation for Fire Alarm System & Gas Suppression System (GSP) .

Input Study, Raising Technical Queries.

Prepared following deliverable as per customer requirements

Update IO Assignments as Per Updated Block Diagram &Layout.

Update SLC Loop Drawing as Per FAT Comments/Markups

Update General Arrangement &Wiring as Per FAT/SIT Comments/Markups

Update Communication Page as per Updated Fiber Connection Drawing

Special Aspects

of the

Project/Work

Scope of the Projects include 25 Fire Alarm (XLS3000) &Gas Suppression System(XLS0140-2) Panels

Integration with Fire Alarm System with Gas Suppression System.

Integration with HVAC,Safety Manager

All are in XLS Network

Page 5 of 11

Project: Fire Alarm Control Systems-Zuluf

End User Saudi Aramco

Work Location: Honeywell

GS-HPS, Pune.

Duration: Oct-2016 to Nov-

2016

Position: Project Engineer

Platforms Honeywell XLS 3000

Responsibilities

Detailed Engineering design and documentation for Fire Alarm System .

Input Study, Raising Technical Queries.

Prepared following deliverable as per customer requirements

Instrument Loop wiring Drawing- Typical Installation wiring For Each Device,Modules.

Battery Calculation- As per FAS panel devices load, required battery backup calculated for stand by 24 hours operation as per NFPA Standards.

.Cable Schedule-For Field Device and Inside Cabinet Signal and Power Cable

SLC Loop Drawing- Detailed device to device loop and wiring details prepared with all Smoke Detectors,Modules .

Preparation of FAT Procedure

Special Aspects

of the

Project/Work

Scope of the Projects include 5 Fire Alarm (XLS3000) Panels

Dual redundant Modbus network with MFACP.

All are in XLS Network

Integration with DCS System

Project:

Kuwait Natural Petrochemical Company (KNPC-MAB1) CFP on F& G Systems

End User Kuwait Natural Petrochemical Company (KNPC) Work Location: Honeywell

GS-HPS, Pune.

Duration: April-2016 to Till

Date

Position: Project Engineer

Platforms Honeywell XLS 3000

Responsibilities

Detailed Engineering design and documentation for Fire Alarm System .

Input Study, Raising Technical Queries.

Prepared following deliverable as per customer requirements

IO Assignment- Study Cable Block loop Diagram,Detection Layout and Cause &Effect Matrix for Preparation.

Battery Calculation- As per FAS panel devices load, required battery backup calculated for stand by 24 hours operation as per NFPA Standards.

Bill of Material – Document prepared for 19 nos. of XLS 3000 panel by considering all the devices, PSU’s, third party integration devices and all required accessories.

SLC Loop Drawing- Detailed device to device loop and wiring details prepared with all Smoke Detectors,Modules

Preparation of Datasheets for Device

Preparation of Function Design System

Preparation of Factory AccepetanceTest Procedure Page 6 of 11

Special Aspects

of the

Project/Work

Scope of the Projects include 19 Fire Alarm (XLS3000) Panels

Dual redundant Modbus network with MFACP.

All are in XLS Network

Integration with Safety Manager

Project: Closed Circuit Television(CCTV)

End User Super Auto India Ltd

Work Location: Chakan Pune Duration: Jan-2016 Position: Project Engineer Platforms GEBIX Analog DVR

Responsibilities

Survey the Site and Analyse End user Requirement

Supervise site installation activity & provide guidance to technician team for installation of CCTV system.

Commissioning of CCTV System Commissioning Dome

Camera,Bullet Camera Configuration,DVR Configuration. Special Aspects

of the

Project/Work

Successfully completed the site acceptance test within a time. Project:

Kuwait Natural Petrochemical Company (KNPC) HALON on F& G Systems

End User Kuwait Natural Petrochemical Company (KNPC) Work Location: Honeywell

GS-HPS, Pune.

Duration: Nov-2015 Position: Project Engineer

Platforms

Honeywell XLS 3000

Honeywell VESDA System

Responsibilities

Detailed Engineering design and documentation for Fire Alarm System.

Input Study, Raising Technical Queries.

Prepared following deliverable as per customer requirements

IO Assignment- Study Cable Block loop Diagram,Detection Layout for Preparation.

SLC Loop Drawing - Detailed device to device loop and wiring details prepared with all device.

Quality Check of Vesda Drawings from IDP File.

Special Aspects

of the

Project/Work

Successfully delivered all the documents with timeline

Dual redundant Modbus network with MFACP.

All are in XLS Network

.

Page 7 of 11

C2> Organization Name: Tyco Fire & Security (I) Pvt. Ltd (Payroll-Cosmos Innovations) September 2014-August 2015

Project: Integrated Building Management System

End User Allstate Solutions Pvt. Ltd.,Pune

Work Location: Pune

Duration: May-2015 to

August 2015

Position: Project Engineer

Platforms

GE Edward-Est-3X Fire Alarm System, Tyco CEM 300 Access Control System, Sony CCTV system.

Responsibilities

Procurement Follow up with Procurement Team.

Supervise site installation activity & provide guidance to technician team for installation of FAS,ACS and CCTV System.

Commissioning of FAS EST3X System with 2 Loops,100+ Devices in each Loop,Integration with ACS,HVAC,PA System.

Commissioning of ACS- CEM 300 configuration server with CEM Controller,Door Confuguration,Access Card Configuration.

Commissioning Support for Sony IP CCTV System with Dome Camers, NVR, Network Switch.

Preparation for As Built Drawing for FAS,ACS,CCTV System. Special Aspects

of the

Project/Work

Successfully completed the site acceptance test within a time.

Integration of FAS With ACS,HVAC,PA System

Project: Integrated Building Management System

End User Accenture Services Pvt. Ltd, Pune

Work Location: Pune

Duration: Nov-2014 to June

2015

Position: Project Engineer

Platforms

GE Edward-Est-3 Fire Alarm System, Tyco Software House Access Control System, Tyco ADT CCTV System,Honeywell Trend BMS System,Vampex WLD System,Tyco Inergen System,Bosch Plena PA System.

Page 8 of 11

Responsibilities

Procurement Follow up with Procurement Team.

Supervise site installation activity & provide guidance to technician team for installation of

FAS,ACS,CCTV,BMS,Inergen,WLD System

Commissioning of FAS EST3 System 4 FACP each 3 Loops,1200+ Devices .Integration with ACS,HVAC,PA System.Networked All FACP.

Commissioning Support and Testing ofACS- Tyco Software House Controller Configuration,Reader Configuration.Preparation of Commissioning Sheet,IP Configuraation of Controller.

Commissioning Support and Testing for Honeywell Trend BMS System For 14 AHU,28 DDC Panel,Modbus Integration with UPS,PAC,Energy Meter.

Commissioning of Tyco ADT CCTV System, 135 Dome Camera,12 DVR Configuration,Integration of DVR to Network,Display all Cameras in RMS Software.

Commissioning and Testing of Tyco Inergen System with Ravel 125GR FAS System,Pressure Testing of Inergen

Sytem,Integration with GE-EST3 FAS Sytem.

Commissioning of Vampex WLD Sytem with 4 Zone Panel.

Preparation for As Built Drawing for

FAS,ACS,CCTV,BMS,WLD,INERGEN System.

Special Aspects

of the

Project/Work

Successfully completed the site acceptance test within a time.

Integration of FAS With BMS,ACS,HVAC,PA System

Modbus Interface For BMS Integration of UPS,PAC,Energy Meter.

Project: Fire Alarm System

End User CIPLA

Work Location: Kurkumbh Duration: Sep-2014 Position: Project Engineer Platforms

Tyco Simplex 4100 ES Fire Alarm System

Bosch Plena Public Address System

Responsibilities

Supervise site installation activity & provide guidance to technician team for installation of FAS system, PA System.

Installation of Explosion Proof Device

Commissioning of FAS System Tyco 4100ES,Integration with PA System

Preparation Final As Built Drawings.

Special Aspects

of the

Project/Work

Successfully completed the site acceptance test within a time.

FACP Integration with Pubic Address System.

Page 9 of 11

C1> Organization Name: Horizon Automation-August 2013-August 2014 Project: Fire Alarm System

End User CARGIL India

Work Location: Kurkumbh Duration: Jul-2014 Position: Project Engineer Platforms

Tyco Simplex 4100 ES Fire Alarm System

Bosch Plena Public Address System

Responsibilities

Supervise site installation activity & provide guidance to technician team for installation of FAS system, PA System.

Installation of Explosion Proof Device

Commissioning of FAS System Tyco 4100ES,Integration with PA System

Special Aspects

of the

Project/Work

Successfully completed the site acceptance test within a time. FACP Integration with Pubic Address System.

Project: Fire Alarm System

End User CUMMINS INDIA

Work Location: Pune Duration: April-2014 Position: Project Engineer Platforms

Tyco Simplex 4100 S Fire Alarm System

Bosch Plena Public Address System

Responsibilities

Supervise site installation activity & provide guidance to technician team for installation of FAS,PAS system.

Commissioning of FAS System Tyco 4100ES,Integration with HVAC,Sprinkler System.

Commissioning of Bosch Plena PASystemWith Controller,Router.

Preparation Final As Built Drawings.

Special Aspects

of the

Project/Work

Successfully completed the site acceptance test within a time. FACP Integration with HVAC,Sprinkler System.

Project: Fire Alarm System

End User Panchshil Properties

Work Location: Pune Duration: Feb-2014 Position: Project Engineer Platforms

Honeywell XLS 1000 Fire Alarm System

Bosch Plena Public Address System

Responsibilities

Supervise site installation activity & provide guidance to technician team for installation of FAS,PAS system.

Commissioning Support and Testing of FAS System Honeywell XLS 1000,Integration with HVAC,Sprinkler System.

Page 10 of 11

Special Aspects

of the

Project/Work

Successfully completed the site acceptance test within a time. FACP Integration with HVAC,Sprinkler System.

Project: Building Management System

End User Synechron

Work Location: Pune Duration: Nov-2013 Position: Project Engineer Platforms

UTC-Carrier Race-Automatic Logic ZN141+ VAV Controller Bacnet Network.

Responsibilities

Supervise site installation activity & provide guidance to technician team for installation of VAV system.

Commissioning Support and Testing of VAV System Automatic Logic ZN141+ VAV Controller Configuration,Thermostat Configuration,VAV Controller Calibration,Troubleshooting.

Preparation Final As Built Drawings.

Special Aspects

of the

Project/Work

Successfully completed the site acceptance test within a time.

Total 140 VAV Controller and Thermostat work Bacnet MSTP Network.

Project: Mimic Panel for Simulator Box

End User Arya Omani Tollaway Services Ltd

Work Location: Pune Duration: Oct-2013 Position: Project Engineer Platforms Honeywell HMI Display Builder

Responsibilities

Design of Mimic Panel, Hardware / Panel Engineering (Panel wiring, Installation), Testing of Mimic Panel Devices.

Prepare Drawing Of Mimic Panel using Honeywell Display Builder Special Aspects

of the

Project/Work

Successfully completed the site acceptance test within a time. Project: Flare Gas Recovery System,

End User BPCL, Mumbai.

Work Location: Pune Duration: Sep-2013 Position: Project Engineer Platforms Honeywell C300 DCS

Responsibilities

Hardware Engineering (Cable Termination),Ferruling

Preparation of Ferrule for DCS System

Page 11 of 11

D) PROFFESSIONAL TRAININGS / WORKSHOPS / PRESENTATIONS ATTENDED: Workshop Details Organized By Location Year

Training Workshop on

TYCO Fire Alarm System

TYCO Fire & Security Pune 2014

Training Workshop on

TEXECOM Intrusion

System

TEXECOM Pune 2016

Training Workshop on

ROSSLARE Access Control

System

ROSSLARE Pune 2017

Training Workshop on

Design and Estimation

Fire Alarm System

BOSCH Banglore 2017

Training Workshop on

Hands on BIS

Platform(ACS,FAS,CCTV)

BOSCH Banglore 2017

Training Workshop on

Hands on BOSCH PAVIRO

DIGITAL PA SYSTEM

BOSCH Banglore 2017

E) PERSONAL DETAILS:

Date of Birth 31-08-1989

Gender Male

Nationality Indian

Marital Status Married

E-Mail ID ac2cp7@r.postjobfree.com, ac2cp7@r.postjobfree.com Passport Details

Passport Number Z2415600

Date of Expiry Jul-2024

Address

A/P Uruli-Kanchan, Near B G Shirke School,Tupe Wasti,

–Tal-Haveli Dist-Pune Maharashtra India.