CV
Alex (Egypt)
Phone +201********* (imo + call)
ac29hd@r.postjobfree.com
ac29hd@r.postjobfree.com
Skype: nafeagomaa
https:www.linkedin.com/in/nafea-gomaa-99ab9531
Nafea Gomaa Ismail
QA/QC (Mechanical)
Construction EPC PROJECTS
Personal Information:
Name: Nafea Gomaa Ismail
Age: 05/09/1975
Nationality: Egyptian
City : Alexandria
Brief Overview & Key Elements Contributing My Career Prospects Sir as you can see in the enclosed CV, I have about 16 years of work experience in the field of QA/QC, Welding / Piping / Painting inspection and NDT (construction power plant, pump station, water tanks and inspection) activities.
Certificate of Attendance : Inspection of Welding Joints [EWA]
Certified welding inspector CSWIP 3.1 Cert No -46466\2
Certified American Welding Society AWS Cert. No-110511154
Certified ISO 9001/2015 Leader QMS QC1 IRECA 6041937
Course ISO 18001 OHSAS
Certificate of Attendance: Jubal Industrial College ( welding inspector)
Prepare API 570 Piping in service and Prepare API 510 Power plant inspector
Familiar with ASME section B31.1, B31.3, B31.4, section IX, section II (A, B,C),Sec V
Familiar with API Standard 650, API 1104, 5L
Familiar with PMI (Positive Material Identification) & Hardness Test HT
Course Welding Metallurgy
Driving License from : EGY - KSA
License of Safety Radiation from Atomic Energy Authority [AEA] And Ministry of health
Nondestructive testing NDT level 2
SNT-TC-1A Liquid T Penetrate testing. LEVEL II
SNT-TC-1A Magnetic Particle Testing. LEVEL II
SNT-TC-1A Visual Testing. LEVEL II
SNT-TC-1A Ultrasonic Testing. LEVEL II
SNT-TC-1A Radiographic Testing. LEVEL II
Experience certification from
SWEC the first IWPP in the kingdom IN SHUAIBAH III PP
SIEMENS AG during constructions IN SHUAIBAH III POWER PLANT 900MW
SIEMENS AG for shutdown IN SHUAIBAH III POWER PLANT 900MW
ENCOCORP –SAUDI-LEBANESE IN SHUAIBAH III, and ras al khair
SSEM & ILF IN SHUAIBAH II
COMIBASSAL INT.
SESCO INT. Damietta projects LNG
PETOJET EGYPTIAN LINEAR ALKYL BENZENE
SWCC RAS AL KHAIR PROJECT PUMPS& POWER
ILF @ RAS AL KAAIR PROJECT
SSEM @ RAS AL KHAIR
Royal commission RC/BECHTEL - JUBAIL WATER TANKS
ORASCOM/SIEMENS @burullus power station Egypt 4800MW Professional Experience In Reverse Chronological Order: Presently working in: March 2017 up now
Company: orascom/intermaint
Project: Burullus power station 4800 MW
Eight Combustion Turbine
Generators (CTGs) Frame (H)Gas Fired
Client: MDEPC
Consultant: SIEMENS AG
Position: QA/QC& WE
Tasks & Responsibility
Monitored welding / visual inspection of materials like Cs, Ltcs (low temperature carbon steel), different grades of Martenstic &Austenitic Stainless steels(410,304L,304H,310,316L) Cr-Mo alloys(P11,P22&P91), Cu-Ni alloys, used for critical piping applications(Cracking furnace’s).
Conducted/Reviewed PMI (Positive Material Identification) & FN (Ferrite Number) analysis. Visual inspections of field joints on pressure piping, reactors, regenerators, fractionators and heat exchangers.
Witnessed Destructive Test of welded specimen for WPS approval. Line check, preparation of punch list and assist in test pack preparation. Witnessed Hydro test, Leak test, Pneumatic test, Pad leak test, Flushing Conducted repair reduction and welder performance improvement programmes. Reviewed NDT procedure and monitored NDT activities like RT, MT, PT, HT, Pmi&ht Monitored Pre Heat/PWHT (Post Weld Heat Treatment) and Reviewed PWHT charts in accordance with client procedure and specification. Ensured implementation of QCP (Quality control plan), procedure and ITP (inspection & test plan).
Issuance of Quality Alert/DR (discrepancy report), NCR (non conformance report) and action for timely closing.
Weekly welding database follow up and record keeping. Field verification and confirmation of field mismatch report(FMR),request for technical information.
Ensure all modifications to works are recorded on ‘as built’ drawing. Inspection of shop floor fabricaandtion as per applicable codes and project specifications. Conduct quality surveillance on sub contractor’s project execution during construction at site and shop.
Co-ordinate with construction department and client in all stage of process to avoid unnecessary woerks
July. 2016 up Feb 2017
Company: ENCOCORP – SAUDI LEBENES
Project: SUBDIVISION & DEVELOPMENT OF SUPPORT INDUSTRIES ZONE
PHASE2 - 4 TANKS potable water tanks constructions
Client: Royal commissioning RC
Consultant: Bechtel ksa
Position: QA/QC& WE
Tasks & Responsibility
4 CONSTRUCTIONS WATER TANKS
ITP prepared and tender work BOQ PO for supplier
Upgrade company with ARAMCO standards SAP pre qualification WPS/PQR,s prepared and witness
Welding inspection and made reports
Paining following process shop and site and made reports testing measurements such as Blast profile, Wet Film and Dry Film Thickness, Pin hole detection, Adhesion test and Pull- Off test forsurfaces as specified.
workshop and erection site supervision,
All documents required by client and consultant.
Monitoring Randomly the Welding Parameters (Welder Identity, Preheat Temperature, Inter Pass Temperature, Issue & Use Of Consumables, Check Root Pass Quality, Post Heating and Post Weld Heat Treatment As Applicable). Monitor the Daily Welding Records with Traceability of Welding Consumables Ensure That Follow Up Of Defective Weld Corrective Action Is Implemented Review the technical aspects of the construction/erection procedures and methods to assure that they comply with and satisfy the requirements of codes, standards, issued NCR and follow CAR
HT and final dossier to client
From: Nov 2010 up to July 2016
Company: S.S.E.M (Saudi Services for Electro Mechanic Works )
Project: RRWTS –RAS AL KHAIR
Client: Saline Water Conversion Corporation(SWCC)
Consultant : ILF ENGINEERING
Position: QA/QC IN CHARGE PS1 & deputy Manager in hall project Tasks & Responsibility
Implement QA/Qc Activities Including Those of Sub-Contractors Works In Accordance With Maintain Records Of Calibration, Inspection And Testing Equipment. Start project BOQ, PO as per drowning AFC drawing and issue MRIR request inspection and follow up MEP sys. FF, HVAC, utility's systems, cooling water, sewage treatment plant, oil separator, and closed punish list related Provide Sufficient Feed Back To Concern On The Day To Day Quality Issues. Heating and Post Weld Heat Treatment as Applicable). Prepare all PWS/PQRs and do test with AL HOTY company 3 party ksa Inspection at vendors shop facilities and work-sites, on fabricated pipes, steel structure, blasting, painting works LE FBE,testing measurements such as Blast profile, Wet Film and Dry Film Thickness, Pin hole detection, Adhesion test and Pull-Off test for surfaces as specified.
Follow-up on corrective action of non-conforming products. . Develop and maintain Procedure for Pre-Fabrication, erection, installation, Inspection and pre commissioning of static and rotating equipment’s for 20 pumps "Zulzer UK" company and VALVE ITALIA and PIPVISSI
Perform inspection at site for the equipment’s comply with Company Specification and Code
Prepar final dossier Package
Raised RFI inspection, prepare hydro test requirement, following punish list points until closed, pre commissioning piping systems
From: April 2010 to Oct 2010
Company : SESCO INT. work shops
Position : QA/QC Leader
Project : LNG Damietta
Country : DAMIETTA- Egypt.
Tasks & Responsibility
Responsibilities to check the material certificate chemical composition and the physical properties.
Confirm the material against the material certificate. To check the material surface condition, thickness, diameter and length. To monitor the welding activities as per Project spec and Procedure. Review the subcontractor Daily Weld Report.
Advice the Sub contractor fulfill the NDE requirement Review the subcontractor Weld data prior to test
Responsibilities to check the documents related to the work as follows Drawing, welding Procedure, Welder Qualification and Project Specification. To check the Pipe size, Thickness and Surface condition prior to fit/up. To check the fit/up as per the project Specification
Fabrication for Heat Exchanger and vessel (still stripping Column, Amine Flash Tank, Outlet Gas Scrubber, Amine Contactor, Lean/Rich Amine Exchanger, Amine Still Re boiler, Amine Particle Filter, Amine Charcoal Filter, Inlet Gas Separator, Still Overhead Reflux accumulator, Condensate surge/ De aerator Drum), piping spool, and heaters From: Dec. 2009 to Jan. 2010.
Company : ENCOCORP.
Project : Shuaibah.III. IWPP
(Steam Turbine Shutdown-Unit 10, 20, 30 – Capacity 900MW).
Main contractor : SIEMENS AG (POWER GENERATION).
Owner : SHUAIBAH WATER AND ELECTRICITY COMPANY (SWEC).
Position : QA/QC Engineer
Country : KINGDOM OF SAUDI ARABIA
Tasks & Responsibility
QC for all mechanical works described in our scope of work. Provide assistance to the Project Engineers to assure that the applicable requirements for QA, NDE, welding, PWHT, etc. Are incorporated into the Job Instructions Review and approve Job Instructions for QA, NDE, and welding requirements and prepare them for distribution, Review RFQ specifications for QA, NDE and welding requirements when requested by the estimating department
From: Feb. 2009 to Oct. 2009.
Company : ENCOCORP.
Project : Shuaibah. II.WTS
(Pump Station-Mina & Quiz a) (Two Potable Water Storage Tanks144, 000 M3).
Main contractor : Consortium a.Hak-SSEM-RTCC.
Owner : SALINE WATER CONVERSION CORPORATION (SWCC).
Position : QA/QC Engineer
Country : KINGDOM OF SAUDI ARABIA
Consulting : ILF ENGINEERING
Tasks & Responsibility
Mechanical works including the following:
[Piping Installation, Piping supports Fab. / Install., Erection / Alignment for Stationary
[Piping fabrication and installation inside the well head / manifold fence, Manifold skid piping supports and light steel works, Painting:
Inspection of materials Carbon, Alloy, Stainless steel by PMI machine Supervision the application of the approved welding procedure specification. Welding inspector for piping during fabrication and installation. Welding inspector for steel structure fabrication. Supervision of pipe lines construction.
Mechanical punch list for hydrostatic test loops.
Interpretation and supervision of N.D.T. methods RT, UT, MPI, DP, H.T, VT, PMI From: April 2008 To February 2009.
Company : ENCOCORP.
Project : Shuaibah.III. IWPP (Steam Turbine –capacity 900MW). Main contractor : SIEMENS AG (POWER GENERATION).
Owner : SHUAIBAH WATER AND ELECTRICITY COMPANY (SWEC).
Position : welding Engineer
Country : KINGDOM OF SAUDI ARABIA
Tasks & Responsibility
Welding processes, materials types listed below:
1. Welding Processes:
a. Gas Tungsten Arc Welding (GTAW)
b. Gas Metal Arc Welding (GMAW) including flux and metal cored wires c. Shielded Metal Arc Welding (SMAW)
d. PWPH 760c, f. HT & PMI
2. Materials:
a. C. Mn. (Structural) steels b. (Low temperature) steels c. Austenitic Stainless Steels d. ( low alloy steel ) From: Feb 2007 to Sep 2007
Company : PETROJET ( branch north)
Position : QA/QC Engineer
Country : ALEXANDRIA
Project : EGYPTIAN LINEAR ALKYL BENZENE
Tasks & Responsibility
Prepare Job specific Welding Procedure Application Lists for each Job that includes the WPS’s that are acceptable for use on the Job and any special welding requirements. Prepare Weld Maps or other welding documents for each Job when required by the Job Specifications
Review Filler Metal Mill Test Reports for Code and Contract compliance when applicable Maintain and control the distribution of the Welding Procedure Manuals Supervise welder performance qualification weld tests Write and maintain the Welder’s Performance Qualification Records Update, maintain, and distribute the welder qualification summary Maintain the weld reject percentage report and input the data into the corporate report Initiate corrective actions for welders with a weld reject rate >3% and maintain records of the corrective actions
Develop and prepare new welding procedure specifications as required by Contract or to implement the use of improved welding equipment, consumables, or techniques Supervise welding procedure qualification weld tests From: April 2003 to April 2008
Company : COMIBSSAL INTERNATIONAL COMPANY 3party
Position : inspection Engineer
Country : ALEX- Egypt.
Tasks & Responsibility
for all inspections related to piping, tanks, vessel pressers, welders qualifications. WPS, PQR, NDE,Mechanical test, heavy equipment inspections and issue valid certificate, materials inspections before using,
Computer Skills
(Microsoft office 2007)
ICDL Word – Excel – Power Point - Outlook – primavera Finally,
I hope that my C.V. gets your approval and meets your requirements and acceptance. Prepared by
Nafea Gama Ismail