Post Job Free

Resume

Sign in

Architect, construction

Location:
Dammam, Eastern Province, Saudi Arabia
Posted:
November 11, 2017

Contact this candidate

Resume:

MOHAMED AL BARSHOUMY

Date of birth: **/**/****

Kingdom of Saudi Arabia

009***********

Email: ac29dp@r.postjobfree.com

Objective: To obtain a rewarding and challenging position in a reputable company that will fulfill my desire to succeed and continue to expand my knowledge of the field.

Language Proficiency : Arabic- (Mother Tongue) & English- (Fluent). Academic Qualifications : B.Sc. in Architecture, (1999-2004),

-Faculty of Fine Arts Architecture department, Alexandria University, Egypt. Graduation project: (Fish cultivation development researches institute) grade-Very Good.

- Certificate of appreciation from the society of Egyptian architects, UIA Egyptian national section for participating in the competition ''celebration of cities'' organized in cooperation with union of international architects UIA/ PARIS, the project represented Egypt in UIA/Istanbul, July 2007.

The project title: Renovation of access gate no. 10- port of Alexandria-Customs District, Alexandria.

- Projects Executed:

1. San Stefano Grand Plaza Complex and the Four Season Hotel, Alexandria, Egypt. ( Alexandria construction company) Tallat Mustafa Group, Site Architect.

2. The American University Cairo’s New Campus Project in New Cairo, Egypt. (Samsung construction), Site Architect. 3. Al Medina Haram Hotel & Shopping Center (phase 3 western), Medinah, KSA. (Saudi Bin Laden Group), Senior site Architect. 4. Prophet's Mosque Piazza Shading and Storm Water Drainage, Medinah, (Saudi Bin Laden Group). Technical office Architect. 5. Addition of 14 Gates, Doors and Casting 4 Main Staircases as Entrances for the Prophets' Mosque, Medina, (Saudi Bin Laden Group) Technical office manager.

6. Restoration for the Artificial Stones in the Prophet's Mosque, Medinah, KSA. (Saudi Bin Laden Group). Project Architect 7. The General Presidency of Prophetic Mosque Affairs Building, Medinah, KSA. (Saudi Bin Laden Group, Technical office manager).

8. DAR AL-QIBLA PROJECT (Zamzam Pullman Medinah Hotel), KSA. (Saudi Bin Laden Group) Finishing manager. 9. Private Palace (Jeddah shate district), KSA (Saudi building construction management), Project manager. 10. Office building, Powerhouse, truck’s scale, control room, guard rooms and asphalting roads & store yard (Mekkah, bahra cables company) KSA (Bin Bunayan group, Technical Director). Relevant Courses:

Architectural Design

Building Construction

Basic Design

Describe Geometry

Mathematics

Properties Of Building Materials

History Of Art

Theory Of Structure

Strength Of Materials

Theories Of Architecture

Soil & Foundations

Survey

Quantities & Specifications

Environment & Climate

Lighting & Ventilation

Landscape Design

Geometrical Perspective

Reinforced Concrete

Building Legislation

History Of Architecture

Town Building

Working Drawings

Steel Construction

Sanitary Design & fixtures

Technical Equipments

WORKING EXPERIENCE:

Bin Bunayan Group, Jeddah (K.S.A) (from: Dec 2015 up to date)

- Projects: Office building

- Consultant & Designer: Nu architecture development.

- Cost: (3.5 Million) SAR.

- Total built up area: (460m2).

- Clint: Electric House Company

The project is located in Jeddah Baldiah Street, Azizia district, the project is composed of 4 floors with total area of 460 m2, a fully automated Building.

-Project: Powerhouse, scale for trucks, control room, guard rooms & Asphalt road, store yard.

- Total built up area: (100.000m2) -Cost: (4Million) SAR.

- Clint: Bahrah Cables Company

-The project is located in Makah- Bahrah, The project is composed of an industrial building consists of switchgear, generators, transformers and plant room.

- Scale for trucks with the control room.

- 2 Guard rooms at the entrances with toilets and septic tanks.

- Position & Job Description: Technical Director: Since Dec 2015 up to date,

-Tender study, budgeting, quoting, estimating and contracting with sub contractors, manage procurements and cost control reports, Review all drawings submitted by subcontractors, Managing/supervising execution from the excavations till the handing over coordinating with site construction engineers, suppliers, sub-contractors and consultant representatives,, Attending meetings with Consultant, Designer’s representatives, sub-contractors, construction Engineers and quality control representatives. Saudi building construction management, (SBCM) Jeddah (K.S.A) (From: May 2015 to Dec 2015)

- Project: Private palace.

- Cost: (43,000,000) SAR.

- Total built up area: (6,105m2). The project is located in Jeddah near Hilton, shate district.

- Position & Job Description - Project Manager: Since May 2015 up to Dec 2015,

- Managing/supervising all the finishing work activities, Organize activities of subordinates to ensure field operations are match/coordinated in between different materials and endorse the materials selection, Coordinating and synthesizing technical and functional requirements of finishing's and disciplines into responsive architectural solutions. Plan, coordinating with site construction engineers, suppliers, sub-contractors and consultant representatives, Review all drawings submitted by subcontractors, guide construction Engineers and quality control representatives in order to solve issues and to keep development process proactive. Provides guidance to contractors, Coordinating and synthesizing technical and functional requirements of finishing's and disciplines into responsive architectural solutions. Saudi Bin Laden Group (SBG) Medina (K.S.A) (from: June 2007 to March 2015)

- Project: DAR ALQIBLA PROJECT ( Zamzam Pullman Madinah Hotel).

- Consultant: Zuhair Fayez Partnership

-Construction Cost: (409,345,978) SAR.

- Total built up area: (126,741m2).

- Management: PROJACS

The project is located in Al Madina Al Munawarah, 300m away from the front of the Holy Prophet’s Mosque in Al-Medina Al Munawarah. The project is composed of two towers, A & B with total area of 8,173m2 and total built up area of 126,741m2, a fully automated Building .The two towers consists of 5 basements with 526 parking spaces, Ground and Mezzanine floors, 2 restaurants and coffee lounge, 10 typical floors with 834 studios and suites, roof and upper roof with 2 restaurants and a pent house.

- Position & Job Description: Finishing Section Head: Since March 2014 to March 2015,

- Managing/supervising all the finishing work activities and Technical office duties. Organize activities of subordinates to ensure field operations are match/coordinated in between different materials and endorse the materials selection. Coordinating and synthesizing technical and functional requirements of finishing's and disciplines into responsive architectural solutions. Analyze complex engineering problems and offer effective resolutions. Plan, organize and control the activities of the technical office department from start to finish, Submitting materials to the consultant, Provide guidance to contractors regarding schedule, procedures, scope of work and technical requirements. Coordinating and synthesizing technical and functional requirements of finishing's and disciplines into responsive architectural solutions. Perform other duties as assigned by the project manager such as decorative modifications.

- Project: The General Presidency of Prophetic Mosque Affairs Building.

- Consultant: DAR AL-HANDASAH

- Cost: (157,300,000) SAR.

- Total built up area: (2040sq. m.).

The project consisting of administration building located at the west area around the Holy Prophet’s Mosque in Al-Medina Al-Munawarah., The building consisting of: 2 Basements, Ground Floor + 6 Floors and roof as a highly sophisticated building systems including central air-conditioning, fire alarm and fire fighting systems, a fully automated, the sixth floor consists of special luxurious decorated offices.

- Position & Job Description: - Technical Office Manager: Since May 2012 to March 2014,

- Plan, organize and control the activities of the technical office department from start to finish, Review all drawings submitted by subcontractors. Preparing coordination shop and as built drawings using software applications, Submitting materials to the consultant. Attending meetings with Consultant, Designer’s representatives, sub-contractors, construction Engineers and quality control representatives, Landscape, installing pipelines and electrical cables, etc. Provides guidance to contractors regarding schedule, procedures, scope of work and technical requirements, Coordinating and synthesizing technical and functional requirements of finishing's and disciplines into responsive architectural solutions, quantity surveying and doors & hardware schedules, design the false ceiling decorative modifications, assist architectural finishing work activities, Review activities of subordinates to ensure field operations are match/coordinated in between different materials and endorse the materials selection.

- Project: Restoration for the Artificial Stones in the Prophet's Mosque.

- Consultant: Dar al-handasah

- Construction Cost: (11.30) million SAR.

- Total built up area: Whole the Second Extension of The Prophet's Mosque.

- The project was re-fixing the coloured artificial stone works in the second Saudi extension for Holy Prophet’s Mosque in Al-Medina Al-Munawarah; to brace the artificial stone's two colored layers by injecting anchor screws through the precast pattern to hold the constancy of the decorated imposed carving layer, restoration for the damaged carvings.

- Position & Job Description

Senior Project Architect (Day shift and night shift): Since July 2010 to May 2012.

- Plan, Organize, direct, evaluate and control construction works, Responsible for all restoration works, Observe work in progress, assess, Manage the subcontractor and a crew of supervisors, skilled fixers and workers, Perform working drawings, solve problems that can phase in site construction, Survey the replaceable carvings and coordinate with the artificial stones factory to recast, Prepare progress reports and issue progress schedules, Represent company on matters such as main contractor meetings and negotiations, Coordinating the architectural artwork to form the required shapes, Emphasis the restoration works to match the existing carvings. Project: Addition of 14 Gates, Doors and Casting 4 Main Staircases as Entrances for the Prophets' Mosque.- Consultant: Dar al-handasah, - Cost: (39.50) millions SAR. The project consists of opening 14 double doors in the outer skeleton by cutting the reinforced concrete walls and replaces a steel frame as reinforcement to the existing wall. Install the artificial stone templates welded in the reinforcement steel bars then cast the concrete in place, installing the carpentry works. And cast 4 main reinforced concrete staircases with separate foundations from the existing, cladding with granite tiles matching the existing. Project: Prophet's Mosque Piazza Shading And Storm Water Drainage.

- Consultant: Dar al-handasah- Total built up area: (365,800 sq. m.).

- Construction Cost: (808) million SAR.

The project consists of Installation of 182 Umbrellas with fixed ventilation fans including Mist system, storm water drainage systems, lightning protection net and rods, Rectifying piazza's slopes by removing the granite flooring tiles then cast a foam concrete sloping layer and Water proofing treatments. Project: Medina Haram Hotel & Shopping Center (Phase 3 western).

- Position & Job Description: -Technical Office manager: Since June 2009 to April 2011,

- Consultant: Dar al-handasah-Total built up area:(79,496 sq. m).- Cost: (235) millions Sr The project is a highly sophisticated building system including central air-conditioning, fire alarm and fire fighting systems, a fully automated Building, consisting of hotels in five buildings located at the western side of the Holy Prophet’s Mosque in Al-Medina Al-Munawarah.

- Position:- Technical Office Architect: Since March 2008 to June 2009,

- Consultant: Dar al-handasah- Total built up area :(79,496 sq. m Cost: (235) million

- Position - Senior Site Architect: Since June 2007 to March 2008,

-Responsible for all Finishing Works, Obligate inspectors and quality control programs and notices on construction, Prepare progress reports and issue progress schedules, Represent company on matters such as main contractor companies meetings and negotiations, Co-ordinate with other main contractors companies who are responsible for other majors such as electrical, HVAC, Pluming, etc. EGYPT PROJECTS:

- Samsung - Samcrete Joint Venture.

- Project: The American University Cairo’s New Campus Project in New Cairo.

- Consultant: Community Design Collaborative,

Interdisciplinary Design, Fluor international

Limited, ALI ABDEL- RAHMAN & ASSOCIATES

-Total built up area : Total site area: 1.8 million square feet.

- Construction Cost : $ 300 million.- The American University in Cairo (AUC) for its new 260-acre campus. Designed as a “City for Learning”, the campus was designed to serve a student central feature of the campus layout is the AUC Plaza, which serves as a commons around which the university buildings are grouped. Beyond the central area and academic and administrative buildings is the University Garden, which aesthetically separates the central campus from the physical plant and maintenance facilities and the desert that surrounds the campus. A continuous flow of movement occurs between the University Garden and the open space along the edge of the campus. Recreational facilities include sports facilities, a small indoor coliseum, soccer fields, and tennis courts. The 260-acre campus includes classrooms, administrative offices, a sports arena, a theater, dormitories, and a student center, with a total build out of 1.8 million square feet. Major components of the university AUC Park and Square School of Humanities and Social Sciences, School of Sciences and Engineering, School of Business, Economics, and Communication, Core Academic Program, Library and Learning Technologies, Campus Center, Athletics, Physical Education, and Recreation, Student Housing, University Administration, Student Services, Information Center, Physical Plant, Service and Utility tunnel, Presidential Housing Complex

- Position & Job Description: - Site Architect: Since May 2006 to June 2007,

-Stone works with 25% of construction cost at the cutting factory consisting of 3 huge stone automatic cutters, 10 manual cutters for small stones and a group of sculptors to form the special engraved and imposed carvings, Working as stone factory coordinator controlling the production of the sand stone and marbles (veneering nature stones) to provide the site with all the materials; by receiving the blocks and directing it to the stone cutters to fabricate the cutting lists resulted from the shop drawings, also to coordinate with sculptors to form the required carvings.- Alexandria construction company (Alexandria-Egypt)

- Project: San Stefano Grand Plaza Complex and the Four Season Hotel.

- Consultant: Dar al-handasah -Total built up area: (30,000 sq. m Construction Cost: (300) million LE.

- Contractor for main civil works: Murray & Robert Co.

- Contractor for finishes works: Alexandria Construction Co.

- Management: John Laing International limited.- DESIGNER: Webb Zerafa Menkes Housden Partnership (Canada)

San Stefano is built on an area of 30000 m2, with a 170-meter frontage alongside the beach, 45 meters of its total front faces the Corniche, the project consists of a building of mixed use 30 floors complex that comprises 3 underground parking floors, six floors for commercial and retail activities, the remaining floors are dedicated for 946 residential units, four seasons hotel, in addition to beach cabanas and marine work

- Position & Job Description: - Site Architect: Since May 2004 to May 2006,

- Work with ASTM for all the finishes works, Superintend and supervise activities, supervisors, skilled people, Prepare progress reports, Perform working drawings & solve problems that engineers can phase in site, Meet inspectors on site.



Contact this candidate