APPLICATION FORM
Main information
Position:
Construction Piping Engineer
Current type of Work Site:
Polimer Plant (PP & HDPE)
Full Name:
DAVUD ISMAYILOV SEYFELI
Available from:
01.05.2017
Citizenship:
AZERBAIJAN
Date of birth:
24.08.1980
Phones:
Place of birth:
AZERBAIJAN NAKCHIVAN
Email address:
*****.****.**.**@*****.*** *****.*********@*****.***
Country of residence:
AZERBAIJAN
English level:
GOOD
Full Address:
Garadag region Sahil settlement A.Gulbabayev building 14 home 24
Passports / Smbk
Date of issue
Place of issue
Date of expire
Offshore passport
15.05.2015
Baku
15.06.2019
International passport
25.12.2012
Baku
25.15.2022
Diplomas
Date of issue
Place of issue
Valid up
Baku Technical Collage
25.05.2005
Baku
Unlimited
Certificates
Company
Date of issue
Place of issue
Valid up
Pipe-fitter Course
Azfen - Tekfen Alliance
2003 One Month
Azerbaijan
Unlimited
Pipe-Fitter Craft Training Course
McDermott M.C.C.I
2003 14 - 31 July
Azerbaijan
Unlimited
BP’s Safety Immersion Training
BP
2004 One Day
Azerbaijan
Unlimited
English Language Course
McDermott M.C.C.I
2004-2005
Azerbaijan
Unlimited
Fall Prevention Training
McDermott M.C.C.I
2005 One Day
Azerbaijan
Unlimited
Galperty Assembly Procedure Training
McDermott M.C.C.I
2006 One Day
Azerbaijan
Unlimited
Safety in the Use of Abrasives Training
McDermott M.C.C.I
2006 One Day
Azerbaijan
Unlimited
Quality Awareness Training
McDermott M.C.C.I
2006 One Day
Azerbaijan
Unlimited
Supervision Safety Leadership Training
McDermott M.C.C.I
2007 One Day
Azerbaijan
Unlimited
Bolt Torque Course
KENTECH
2008 One Day
Russia
Unlimited
OPITO BOSIET Course
HERTEL (OPITO)
2011 Three Days
Azerbaijan
2011 May 2015 June
Performing Authority Course
HERTEL (Casp.Safe)
2011
Two Days
Azerbaijan
2011 September 2013 September
COSHH Course
SDL (FALCK)
2014 One Day
Azerbaijan
2014 October 2016 October
Manual Handling Training
SDL (FALCK)
2014 One Day
Azerbaijan
2014 October 2016 October
Control of Work PA level
BP (UNIFY)
2014 One Day
Azerbaijan
2014 October 2016 October
Authorized Gas Testing–Level 3
SDL (OPITO)
2014 One Day
Azerbaijan
2014 October 2016 October
Web learn ISSOW Level 1
SDL (BP)
2014 One Day
Azerbaijan
2014 October 2016 October
OPITO FOET Course
AMEC FW (OPITO)
2015 One Day
Azerbaijan
2015 May 2019 June
PA-English Course
AMEC FW (BP)
2015 One Day
Azerbaijan
2015 February 2017 February
First Step Safety Leadership Course
AMEC FW
2015 Two Day
Azerbaijan
Unlimited
Carrier
Position
Name of Company
Country
Project
From - Till
Construction Piping Engineer
Kinetics Technology
Azerbaijan
Polimer Plant “PP & HDPE” Project (Client SOCAR)
2016
Present
Accountable for personal safety and ensuring that all activities are performed in a safe, environmentally responsible manner with integrity. Provide input in the design and direction in the layout, fabrication, assembly, installation, test and pre-commissioning of onshore piping and facilities, rotating and static mechanical equipment, to ensure compliance with the agreed scopes of work and project schedule. Provide engineering support to construction and commissioning activities. Development of work packs including detailed job card man-hour estimating and compilation of WBS’s.
Provide assistance in the contracting activities, including preparation of tender enquiry documents, preparation of responses to tenders requests for technical clarifications; and plays an active role in the evaluation of tenders from a technical point of view according to WG policies and procedures. Maintain the required technical quality of work. Ensure that work output complies with the relevant procedures. Provide technical assistance to Construction Manager and other members of the team as required. Ensure as far as practically possible all assigned work is carried out in compliance with agreed budget and schedule . Keep up-to-date with technical developments, national and international standards and legislative requirements related to the scope of the discipline .Review work/work output of discipline assigned staff as required. Prepare estimates and assist in the review of proposed schedules. Liaise with client technical authority when needed for approval of procedures. Assist the Construction Manager, when requested, in the execution of their responsibilities and duties
Position
Name of Company
Country
Project
From - Till
Offshore Construction Supervisor
AMEC Foster Wheeler
Azerbaijan
Brownfield CAT”B” & CAT “C” Projects (Client BP)
2015-2016
(1 years 8 month)
Construction Mechanical-Piping-Structural Supervisor at AMEC FW .
BP Client representative that supervise construction activities. Control and supervise offshore site construction/installation of multiple projects of assigned discipline and ensure that the work is carried out in a safe manner and in compliance with scope of works, approved engineering standards and specifications. Review contractor’s construction plans, schedules and method statements including offshore logistics. Coordinate and control mobilisation and demobilisation of contractors, sub-contractors and vendors to offshore sites following the contract award. Facilitate issuance of necessary permits and gate passes when required by Contractors. Update daily and weekly construction progress reports for assigned projects and verify contractor’s progress statements for accuracy. Check, inspect and test completed project work and/or arrange appropriate pre-commissioning inspections and tests. Verify and endorse “as built” drawings. Interact and interface with other contractors, projects, departments regularly to identify and resolve all construction related matters. Initiate Mechanical Completion certificates on line. Review and accept all relevant contract documentation from contractor and prepare commissioning completion and hand-over certificates. Pipe spools and supports installation, erection, modification, structural installation and pre shutdown hook up activities in Well Head Platforms assigned in Offshore . Flange Management and Punch clearance prior for MC and RFC. Implement company HSE policy, procedures, regulations and objectives of the Company. Follow up with ECMS contractors the construction planning and progress on daily basis. Anticipate potential problems, analyse and recommend solution or corrective action. Review dossiers prior for Mechanical Completion. Follow project Quality and HSE management system. As a Performing Authority on BP ACG Project my responsibilities are to issue Cold & Hot Work and Breaking Containment permits for the contractors. Ensure contractor follow the Permit to Work system, Risk assessment & JSA and perform additional activities as per superior’s direction .Also written every day Daily report, POB and Time Shit for the contractors and AMEC FW workers. Attend daily PTW meetings.
Mechanical & Piping Supervisor PA
SDL Denholm Limited Company
Azerbaijan
Offshore TAR Project (Client BP)
2014 (5 month)
I have been Piping Construction Supervisor at the TAR project on the SDL. I worked offshore on the AGT region ACG project CA PDQ & PCW platform with SDL . My role includes planning and coordinating for the forthcoming TAR, overseeing of all day-to-day construction activities, ensuring the successful completion of construction scopes safely and on budget. Also planning manning requirements, material requests, time keeping as well as all other activities involved within supervising an offshore construction team. I take great pride in promoting safety and environmental issues whilst offshore.
Fabrication Supervisor
Construction Repair Company
Azerbaijan
Fabrication & Installation (Client Holcim & Norm)
2014-2015 (1 y-r 1 month)
Lead and managed fabrication and assembly projects for Mechanical/Piping and Structural unit . Adhered to all client specifications and met deadlines. Directed a complete plant relocation project . Responsible for fabrication and assembly of all Pipe spool,pipe support,pipe rack and different Structural unit in the fabrication workshop . And to drive and maintain a rapid production line within the workshop, to ensure that all components and parts are correct and that assembly is been done according to drawing and specifications . Was the Fabrication Supervisor for the piping upgrade and also the tank modification, my duties were to ensure that all equipment & material was available for the team, planning for the shut downs & change over, supervision, liaise with the client on milestones to be reached, site QA / QC, safety including audits . Supervised up to 45 employees on a daily basis.
Advanced Mechanical/Piping and Structural Specialist(Supervisor)
Hertel Engineering Industrial Service
Azerbaijan
Fabrication & Installation Brownfield Project ( Client KCA RDS)
2010-2014 (4 years)
Practiced all piping work, fabrication, installation and construction of Onshore & Offshore Mechanical/Piping and Structural in oil, gas and petrochemical projects. Good teamwork and time management ability. Supervise the preparation of feasibility studies, surveys, and reports. Comprehensive knowledge of piping design codes and standards such as ASME B31.3, ASME B31.4, ASME B31.8, etc, particularly their interpretation. Organizing estimating and calculating the activities to be implemented . Analysing Pipe Spool & Piping Support and Structural Drawings and ordering works based on drawings .Preparing look ahead schedules and updating it after client approval. Inspecting and monitoring works carried out. Controlling the usage of materials, test of Pipe spools and repair Support & Steel work . Controlling repair and test of Spools & Piping Supports. Calculating materials needed for repair of Spools & Piping Supports and Structural Unit. Controlling installation of all types of Spools & Piping Supports at site. Supervising Fitters & Welders of work activities. Analysing PID, Isometric Pipe spool & support and Structural Drawings. Preparing. Daily Reports and other documentation regarding Piping and Structural work.
Pipe-fitter & Piping Foreman
SWIFT Engineering Network LTD
Azerbaijan
Fabrication Brownfield Project (Client KCA RDS)
2008-2010 (1 y-r 4 month)
I have been responsible for the co-ordination of Piping, Mechanical & Structural Construction and Pneumatic /Hydro Testing, Commission activities with Client Management and Supervision during Construction activities, for Installation to Pre-Commissioning and Mechanical completion/Punch List Clearance and Handover of Systems to Client. Was acting as a Construction Superintendent.
Ensuring project schedules were maintained monitoring the quality of Construction and ensuring compliance with both contractual and statutory requirements. Compiling job Cards and Test Procedures for piping systems, resolving clashes, restraints and incorporating them into the projects, Engineering design changes and modifications.
I have experience in the Onshore in the Oil and Gas Industry Piping,Mechanical and Structural, Both above and below ground Pipe work Process and Utilities, Pipe Racks, Oil and Gas Production Platforms and F.P.S.O Construction and Commissioning, Plants and Module Construction Yard.
Piping Supervisor
Sakhalin Energy Investment
Russia
Booster Gas Station (Client Sakhalin Energy)
2008 (5 month)
Started position as W Supervisor and progressed to Night shift Supervisor to take charge of three pre assembled units. My responsibility supervising overseeing the erection of Pipework, Pipe Support and Steelwork. On completion of each Isometric Drawing and checking that they were NDE clear, I was then responsible to start theprocess of signing off the work packs.
When I came erection Booster Gas Station as Day shift Supervisor I mostly looked after pipe work and supports on the boiler side. This consisted mostly of gas line and utility pipe work, but also included firewater and vapour evacuation pipe work. The recording of welds and progress and to liaise with other contractors was also part of my remit. I supervised the group of 2 Foreman and 30 men.
Piping Supervisor
Construction Company
Azerbaijan
Thermal Energy Plant (Client Siemens)
2008 (5 month)
Construction of Thermal Energy Plant,Supervised 20 men, pipe fitter and plate fitters and trades assistants.I was also responsible for the installation of different valves and pipe work on erection . Other duties include ensuring all NDE reports are completed and clear prior to hydro test of system and when completed I am required to sign off Mechanical Acceptance Certificates. Therefore Single Unit Shutdowns are ready to release back to operations to enable them to begin commissioning plant.
Supervisor
Company Stamford Building Services
Azerbaijan
Building Structural Project (Client Saipem)
2007-2008 6 month
Involved in fabrication, installation off all Civil Structural item . Involved in all structural activities including fabrication, installation and control off all structural items SBS Fabrication Shop. Steel structural estimates include pump shelters, access platforms, handrails, (cutting, rolling, bevelling, profiling etc. Also fabricated some different Structural unit . Drawing clarifications to the installation personnel (fitters, welders etc.). Responsible for delivery of fabricated Structural item to the worksite. Installation of Structural unit to the top of Building .Handover to the QC and Dimensional Control Groups . Supervising the group of 22 men.
Pipe-fitter Pipe Fitter/Chargehand
McDermott Caspian Contractors Inc.
Azerbaijan
ACG PDQ CA,WA,EA & DWG (Client BP)
2003-2007 (4 y-s 2 month)
During my time working on this jack up, I was part of a team who's task was upgrading and remedial works on various pipe, working from Isometric pipe support, pipe spool drawings and P&ID's for better understanding of the task in hand.
Towards the end of the project, there was a big push on to meet the deadline but with a lot of hard work, professionalism and consistent team work we managed to complete the project safely and within the agreed time frame.
My role is the allocation of work onsite to a team of up to 10 men and myself, focusing on the of Installation and the Fabrication and valve and pipe spool, pipe support on the Oil Platform . I'd be the first port of call for any onsite problems. I would ensure that all men under my supervision are working by health and safety procedure and guidelines. My team also installed. We made in the 5 years AGT Project four Oil Platform at Mc Dermott on the Azerbaijan.
Pipe-fitter
Azfen-Tekfen Alliance
Azerbaijan
BTJ Sangachal Oil Terminal (Client BP)
2002-2003 (1 year)
To ensure the fabrication installation of weld and sprinkler pipe work is fitted to a high standard, assembling and installing a variety of CS, LTCS, S.S, Duplex, S. Duplex and Chrome pipes and fittings connecting them using welded and threaded, grooved and flanged joints. Securing pipe work to structure with brackets, clamps and hangers. On completion of installs I would be required to for pneumatic pressure tests.
Additional info
Education: Baku Technical Collage
Knowledge of other languages: English, Russian,Turkish. Azeri.
Specialty: Mechanical, Piping & Structural
Driver license : Category B
Next of Kin
Next of kin: Father
Phone: +994-**-***-**-**
Name, Surname: Seyfeli Ismayilov Hesen
Address: app 17, A.Gulbabayev 18, Baku, Azerbaijan
Biometrical data
Sex: Male
Height: 165 cm
Overall size: 44
Eyes color: Green
Weight: 85 kg
Shoe size: 41
Mob: +994*********
Mail: *****.****.**.**@*****.***
Mail: *****.*********@**.**.***
Feel free to contact with me any time.
Thanks &Regards. Mr. Davud Ismayilov