Post Job Free

Resume

Sign in

Telecom Engineer

Location:
Indore, MP, India
Salary:
200000-240000
Posted:
November 05, 2017

Contact this candidate

Resume:

CURRICULUM VITAE

Ram Patidar

At post sirsod/Tel. -Khandwa

Distt. Khandwa 450001

ac25ee@r.postjobfree.com

735-***-****

OBJECTIVE

To gain employment with a company or institution that offers me a consistently positive atmosphere to learn new technologies and implement them for the betterment of the Firm.

ACADEMIC PROFILE

Degree

Discipline/

Specialization

Institute

University/Board

Year

Percentage B.E

Electricle & Electronics

CDGI Indore M.P.

RGPV Bhopal

2017

6.2

HSC

PCM

SSVM, Khandwa M.P.

M.P. Board

2012

65

S.S.C

All Subject

SUBVA Somakhedi M.P.

M.P. Board

2010

70

ADDITIONAL QUALIFICATION:

PAHAL Techno Vision Certified Telecom & Wireless Professional Expert Training Program:

I have completed the “PAHAL Certified “Telecom & Wireless Professional Expert” Training Program from “PAHAL TECHNO VISION” of 240 Hrs duration.

Training Covers

• Optical fiber- Splicing, FTTH, PON, DWDM, CWDM

• Modulation & Multiplexing, Switching & Signaling.

• Evolution of communication-2G, 3G, HSDPA, HSUPA, HSPA+, 4G LTE, 3GPP Releases

• BTS maintenance & RF engineering- Drive Test (2G,3G,4G), Swap case analysis, Frequency Planning, HO planning, New site Planning, Customer Complaint Analysis,

KPI Analysis.

Data communication- Sub netting, Masking

• configuring routers & configuring routing protocols like OSPF, EGIRP, etc. on packet

Tracer.

• Implementing and troubleshooting Ethernet & virtual LANs, Etc.

PRACTICALTOOLS TRAINING EXPERIENCE

Tools: MAPINFO, TEMS15.1, COMMON, MIPT, ACTIX, MS-Excel, Magnetic Compass, Google Earth, Packet Tracer, Tilt meter, Altimeter, Automatic/Manual Frequency Planning, GPS etc..

PROJECT

BE Project Name

Solar water pump

Responsibilities

Idea Generation, literature survey and Testing.

Project Duration

Final year Engineering

Description: A solar water pump system is essentially an electrical pump system in which the electricity is provided by one or several PhotoVoltaic (PV) panels. ... The water is often pumped from the ground or stream into a storage tank that provides a gravity feed, so energy storage is not needed for these systems.

Project Name

Harmonic Reduction using Fillter

Responsibilities

Analysis, Design, Development and Testing. .

Project Duration

Mini Project at third year

Description: A. Description of DSP System Hardware.. system has been found capable of improving the power quality, voltage profile, power-factor correction, harmonic elimination and. It has been found that the AF system reduces harmonics in the voltage at PCC and the supply currents.

PERSONAL DETAILS

• Date of Birth : 13/06/1994

• Gender : Male

• Marital Status : Single

• Nationality : Indian

• Languages Known : English, Hindi

• Strength : Team worker, Positive thinking

• Hobbies : Playing Cricket, Visiting new places

DECLARATION:

The information furnished above is correct and true to the best of my knowledge.

Date: Yours Faithfully,

Place: Indore Ram Patidar



Contact this candidate