Post Job Free

Resume

Sign in

Engineer Power Plant

Location:
Wardha, MH, India
Salary:
10lakh
Posted:
November 02, 2017

Contact this candidate

Resume:

CURRICULAM VITAE

P.GANGA RAO (B.E- Mechanical)

S/o P.Umapathi Rao, H.no: LIG-1/943,

Housing Board, Industrial Area,

Bhilai, Durg,

Chhattisgarh-490026

E-mail: ac23ub@r.postjobfree.com,

ac23ub@r.postjobfree.com

Mobile: +91-866*******, +91-776*******

Objective

Seeking a challenging work as a Mechanical Engineer, Where I can grow along with the organization with greater responsibility and prove my skills with dedication.

Executive Summary:

A result driven professional with 8+years of experience in powerplant (Operation) as a Assistant manager (Turbo Blower incharge).

Knowledge of operation & preventive maintenance of Power Plant Turbine(15MW,2MW), boiler(75TPH,40TPH), Blower(0.388MPA/7.8MW,0.355MPA/7.5MW, Pumps, cooling tower).

Knowledge of start-up and shut down of power plant.

Certified boiler operation engineer having BOE certificate of Maharashtra .

An effective communicator with strong analytical, problem solving & organizational abilities.

Key Result Areas:

Operations & Maintenance

Planning & implementing the preventive & predictive maintenance schedules for improving the overall reliability and safety of plant equipment & machinery.

Reviewing history records of key machines for repeated breakdowns to analyze and carrying out necessary corrective actions using computerized maintenance management services.

Organizing activities for continual improvement & working towards cost reduction activities.

Erection & Commissioning:

Supporting erection and commissioning of new machines along with anchoring erection & commissioning of machines & equipments and ensuring completion of project in minimum turnaround time, effective resource utilization to maximize the output.

Achivement :

BOE (Boiler operation engineer) certified from maharashtra.

Safety captain from our department .

Zero Accident in the department.

Annual captive shutdown attended on Feb 2017 & Dec 2012 and be the part of complete overhauling of turbine in powerplant/turbo blower and successfully completed the job.

Implementing 5s and the part of 5s team.

Experience

CURRENT CTC 7.2 Lakhs per annum

ORGANISATION UTTAM GALVA METALLICS LTD, WARDHA (M.H)

PERIOD JULY 2011 to Till now

POSITION Assistant Manager

JOB PROFILE Being a mechanical engineer I am responsible for the power plant operation. following are my job responsibility during duty hours :

1.Overall boiler & turbine operation (15MW), routine and emergency operation of steam turbine and turbo generator,turbo blower, cooling tower and auxiliaries following “safe and standard operating procedures”.

2.Having shift responsibility for monitoring and controlling the operating conditions of an assigned power generating units in order to deliver power generation requirements in the most effective way. Responsible to ensure the availability of major standby equipment by following proper trial schedule.

3.Finalizing of pre-commissioning and commissioning procedures and verification against installed equipment/ line ups and configuration.

4.Assists in the orientation, training, development of O & M technicians to assure high work quality. Responsible for immediate action in emergencies like system failure, load throw, station blackout etc. to rectify problems and restore normal operation or shut down the plant or in extreme emergencies, to safeguard it from avoidable damage and to ensure the safety of personnel on the plant.

5.Assist in maintaining safety programs. Maintain close contact with operators on assigned units to ensure recording instruments are aligned and reflect actual operating conditions. Maximize plant efficiency and shareholder value without compromising personnel and equipment safety, environmental compliance or the long term commercial viability of the facility.

6.Coordinate the activities of Plant Operators in start-up, shut down and other major operational changes and makes adjustments to optimize operation.

7.Coordinate with maintenance personal in issuing work permits for carrying out maintenance and ensure that all company procedures are strictly followed.

8.Maintain logs and sheets for all shift operations and abnormal events. Include documenting, all relevant details and any problems encountered during work.

Previous Organization PRAKASH INDUSTRIES LTD. CHAMPA (C.G).

PERIOD JULY 2010 to JUNE 2011.

POSITION Engineer

ORGANISATION BHAVANI ERECTORS PVT LTD.

PERIOD MAY 2009 to JUNE 2010

POSITION Project Engineer

Educational Qualification

Examination

Board/University

Year of passing

% marks

B. E Mechanical

C.S.I.T /C.S.V.T.U/DURG-C.G

MAY, 2009

65. 25%

HSC (XII std)

C.G Board

MAY, 2004

67.40%

SSC (X std)

C.G Board

MAY, 2002

73.60 %

Personal Data

Name P.Ganga rao

Date of Birth 06-April-1987

Father s name Mr. P.Umapathi rao

Occupation Army ex-serviceman

Mother s name Mrs. P.Appalamma rao

Occupation Homemaker

Nationality Indian

Marital status married

Permanent address Hno: LIG-1/943, Housing Board, Industrial Area, Bhilai, Durg,

Chhattisgarh-490026

Passport no J9784993

Strength Positive thinking, Hardworking, good learner adopt all the

Strength to improve the Personality.

Weakness angriness

Language English, Hindi & Telugu.

Declaration

I here by declare that the above particulars given are true and faith to the best of my knowledge and belief.

Date: 03/11/2017

Place: BHILAI P.GANGA RAO



Contact this candidate