Post Job Free

Resume

Sign in

Manufacturing Sales

Location:
Middleton, MA, 01949
Posted:
November 01, 2017

Contact this candidate

Resume:

James Crowe

* ******** **.

Middleton, Ma *****

Ph:617-***-****

ac22wj@r.postjobfree.com

SUMMARY OF ACCOMPLISHMENTS

Working with Sales and Purchasing, generate daily sales order reports for Manufacturing, release and track work orders through Manufacturing along with helping the supervisors with any issues that arise.

Manage and Supervision groups of up to 50 employees, including Capital appropriation, Manpower requirements, Process and Quality improvements.

Member of the Material Review Board working with Quality Engineering and Purchasing on all MRB/MDR issues to insure a quick resolution.

Department Responsibility for ISO requirements and all related ISO/SOP procedures

Extensive experience working in Contract Manufacturing scheduling and planning the flow of work orders through the factory

Coordinating cycle count processes for large warehouse ($10 Million) and POU (point of use) storage carousels on manufacturing floor, maintaining 96% accuracy

Implementation Team for Oracle Material Requirements (MRP System) Responsible for mapping and writing training manuals for the Order Entry and Manufacturing Scheduling Module

Working with Engineering and Purchasing to develop Scheduling plan for Manufacturing to build NPI products

Develop and maintain forecast in Intuitive utilizing past sales and data provided by Sales.

Education: Wentworth Institute of Technology, Boston, MA

Bachelors of Science in Engineering Technology

Major in Electronics Engineering

Training Skills:

Microsoft Office Suite consisting of Windows, Excel, Word, PowerPoint

INTUITIVE MRP System

ORACLE MRP System

SAP MRP System

EPICOR ERP MRP System

BFT (Business Focus Team) Team leader Training

ISO9001 training for writing and maintaining Procedures

PROFESSIONAL EXPERIENCE

Paul K. Guillow Inc.

Manufacturing Scheduler/Buyer/Planner Oct-2013-July 2017

Responsible for scheduling the day-to-day requirements for the entire manufacturing floor.

Work with the Supervisors to insure all shipment requirements are completed in time for on time shipments.

Maintain the capacity for the manufacturing floor to meet 85% utilization and managing head count requirements.

Responsible for Buying and planning all instruction material utilizing the MRP system, Along with Buying all non-inventory items.

Generate daily sales order reports in Excel by exporting data from ERP system.

Utilize the Intuitive ERP system to release all work orders to the floor.

Built and maintain the 12-15 month Forecast for all products built in the factory based on last years sales and input from the Sales Group.

Responsible for running production meetings and production/ sales meetings.

New England Coffee April 2013-July 2013

Scheduler Planner (Contract)

Setting up Daily schedule for the manufacturing floor, utilizing JD Edwards MRP, Excel scheduling tools and headcount requirements

Update and report on daily stock outs in all warehouses

Insure all Critical list materials are completed in order to meet customer requirements

Satcon Technology Corp Sept 2010-April 2012

NPI Scheduler and Planner

Responsible for all orders for the New Products Introduction area, from receiving BOM’s on Spreadsheets and Creating work orders manually in the MRP system

Will help in Purchasing whenever they needed help.

Working with the Design Engineers insuring all materials have been created in EPICOR

Utilizing Reports generated out of EPICOR, create a daily material shortage report. & work with Purchasing and the warehouse to make sure all material are ordered, received and stocked in the warehouse for distribution

Coordinate daily meetings with Purchasing, Engineering and Manufacturing to ensure all are focused on getting the new products built, tested and ready for Compliance testing

Sanmina-SCI, Woburn, MA/ Manchester, NH July 2009-Sept 2010

Master Scheduler (Contract)

Responsible for taking new orders from the Program Management group and working with the Buyers to assure material will be available to meet the customer’s

Utilizing Oracle MRP systems planned schedule reports, release and track orders through the Manufacturing Operation

Work with the Buyers to meet material requirements for each customer Insure material will be available when required to release jobs/kits for Manufacturing pick, prep and build

Coordinate and facilitate weekly meetings with Program Managers, Schedulers and Buyers on material delivery dates for Proto and First piece build Generate daily Backlog reports for Production meetings

Bose Corporation, Framingham, MA June 2008-June 2009

Master Scheduler

Responsible for scheduling the day to day requirements of the Automation, Manual and Test of all PCB’s

Generating weekly schedules for each area along with working with the Manufacturing supervisors and managers to insure PCB’s are completed on time for the Final Assembly area to meet shipments

Run weekly Attainment reports for each area; work with the manufacturing floor to meet all completions

Work with purchasing team by generating material shortage reports to insure all material needed in house to meet weekly shipments

Set-up and maintain material masters for all Bill of Material (BOM) and Sub-BOM’s in SAP MRP system

EPE Corporation, Manchester, NH Jan 2008-June 2008

Stockroom Supervisor

Responsible for day to day operation of the Stockroom

Utilizing WINMAN inventory system, Print and Release work orders for the Manufacturing floor

Set up and maintain a Cycle-count process for the Stockroom Generate weekly reports on cycle-counting

Work with Purchasing and Vendors to set up POU Kan-ban system for all hardware used in Manufacturing

Sanmina-SCI, Woburn, MA/ Manchester, NH 2006- Jan 2008

Master Scheduler

Responsible for taking new orders from the Program Management group and working with the Buyers to assure material will be available to meet the customer’s

Utilizing Oracle MRP systems planned schedule reports, release and track orders through the Manufacturing Operation

Work with the Buyers to meet material requirements for each customer Insure material will be available when required to release jobs/kits for Manufacturing pick, prep and build

Coordinate and facilitate weekly meetings with Program Managers, Schedulers and Buyers on material delivery dates for Proto and First piece build

Generate daily Backlog reports for Production meetings

Suntron Corporation, Lawrence, MA 2004-2006

Master Scheduler

Maintain weekly capacity analysis for Manufacturing, working with Program Managers to meet customer requirements while maintaining a capacity level within the company goals

Schedule all kit’s for the floor, release kits to the floor within lead-times to meet customer shipments

Generate daily Backlog Analysis, schedule and run daily Production meeting with Manufacturing and the Material groups

Work with both the Customers and Program Managers for cut in dates on all ECO’s

Oracle, maintain accuracy status between customer purchase orders and manufacturing requirements to meet shipments

Schneider Electric-Automation Business, North Andover, MA 1996-2003

Senior Manufacturing Stockroom Engineer/Supervisor 1999-2003

Manage all aspects of the material stockroom from receiving, Inspection, storing and distribution of material to the various areas on the Manufacturing floor

Maintain Cycle count process for $10 million warehouse, insuring goal of 96% accuracy is meet monthly ISO9001 area responsibilities for all procedures

Maintain WM module of SAP MRP system to insure system is clean of all errors relating to Manufacturing transactions

Senior Manufacturing Engineer/Supervisor, PCB Plant 1996-1999

Managed PWA ATE, Auto-insertion and the Manual Assembly Department

Member of the Material Review Board working with Quality Engineering



Contact this candidate