Swee Guan Lim
Block * Lot ** Mercury St. Perpetual Village VII Mambog V Bacoor Cavite City
Cell: 092*-*******- *************@*****.***
Summary
My extensive experience in road construction has given me the expertise in this field since I started work
In the laboratory doing design mix of raw materials then later on doing pavement works. I have handled thousands of engineers, labors, operators and mechanics involved in construction and have dealt with consultants concerning quality of aggregates, asphalt mix and cement mix as well. I am an expert in Plant and Machineries dealing with installation, maintenance and repairs of Asphalt, Batching Plants and Crusher including all heavy equipment for road and building construction.
Highlights
Installation of Linhoff & Marini Hot Mix Plants, Swing Setter Batching Plant
Operation & maintenance of 3 Stage Crusher of Metso, Sandvik and Puzzalano
Preventive maintenance of pavers, milling machine, rollers, excavators from different manufacturers
Superb management skills
ERP System knowledge
Result driven
Cost control abilities
Accomplishment
Managed the operation and maintenance of plants and equipment amounting to US $100 Million in all project
sites in India. Completed 3 road construction in India, 1 BOT project in Philippines and expressway in Malaysia and
Singapore. Trained and mentored over thousands of mechanics and operators in all projects.
Experience
General Manager
June 2014 to June 2016
Emerald Industries – New Delhi, India
Manage 5 Crushers for the supply of aggregate to 2 projects which is Dedicated Freight Corridor Cooperation of India (Tata-Aldesa) US$ 16 Million & NCC Ltd. (57 km Ganga 6 Lane Expressway) project value US$ 27 Million.
General Manager
September 2010 to March 2014
IJM Infrastructure Ltd. - Hyderabad, Andhra Pradesh
Overall management in the operation and maintenance of plants and machineries.Success in the implementation of ERP
System allows management to access all procurements, spares, repairs and location of equipments in the different
project sites.
Plant Manager
January 2008 to August 2010
UEM Construction - Kerala
Handled the operation and maintenance of Asphalt and Concrete Plants for Kerala State Transport Road and Four
Laning of various roads in Rewari Town. Project costs US $ 12 Million.
Plant Manager
April 2002 to December 2007
PATI-Bel Joint Venture - Etawah, Uttar Pradesh
Successful completion of 70 kms. National Highway from Etawah to Sikandra Uttar Pradesh, India. Project value at US $
60 Million.
Plant Manager
April 1998 to March 2002
BSC-RBM-PATI Joint Venture - Raniganj, West Bengal
Successful completion of 40 kms. National Highway 2 from Raniganj to Panagarh West Bengal, India. Project costs US
$ 6.6 Million.
Plant Manager
November 1996 to March 1998
PATI Philippines, Inc. - Paranaque, Metro Manila
Build Operate and Transfer (BOT) Project of the Philippine Government in Coastal Road, Paranaque Metro Manila,
Philippines. Managed to set up Lintec Asphalt and Svedala Crusher Plant for the said project with the value of US $ 10
Million.
Plant Superintendent
January 1991 to October 1996
PATI Sdn. Bhd. – Kuala Lumpur
LINGUISTIC
English, written (good), verbal (excellent)
Malay, written (excellent), verbal (excellent)
Hokkien written (good), verbal (excellent)
Hindi verbal (good)
Tagalog verbal (good)
EXPERIENCE/CAPABILITIES BACKGROUND
Sector: Skill: Years of Experience
Crusher Operation 12 years
Pavement Premix laying 13 years
Laboratory Testing 5 years
Electrical Industrial wiring 2 years
Current Salary :