b. Date of Birth : 14 SEPTEMBER 1955 ( AGE- 62 YEARS )- 100% physically fit, strong, dynamic, dedicated, hardworking and competent person to take care of the responsibility to fulfil your engineering/construction needs. Diversified experience in conceptualization/survey- soil investigation/design/preparation-finalization of tender document/short-listing bidders-open tendering/tendering/evaluation of technical & priced bids/award of job/conducting kick-off meeting/ taking up construction of civil / other infra works. Following are briefly my work domain in the last 36 years of my career in different capacities :
(i) INDIAN INSTITUTE OF MANAGEMENT KASHIPUR- 2 years 8 months Responsible for setting up new campus of Indian Institute of Management, Kashipur in a plot measuring 200 acres with following facilities : a. Architectural drawing / finalization of layout / design of foundation-building / construction / development of 1,18,500 M2 of floor area of buildings as under – i. Land development
ii. Academic building – 17500 M2 floor area in 3- floors iii. Administrative building – 4000 M2 floor area in 4- floors iv. Library building – 6000 M2 in 3- floors
v. Dining building – 4000 M2 in 2- floors
vi. Student hostels – 6- clusters each consisting of 4- nos 4-storey buildings each having floor area of 821 M2
vii. Faculty accommodation – 4 clusters, 5- buildings in each cluster, having floor area of 750 M2 with 3- floors
viii. Staff housing – 3 clusters, 5 buildings 3- storey each ix. Guest house complex – 2 storey building having 24 rooms x. Sub-station building
xi. Hvac building
xii. STP
xiii. Wtp
xiv. Pipelines for HVAC
xv. Pipelines for water supply
xvi. Sewerage system
xvii. Storm water lines
xviii. Horticulture/ gardening
xix. Roads
xx. Boundary wall & gates
xxi. IT network
xxii. Audio-visual system in class rooms
xxiii. Furniture for class rooms
xxiv. Furniture for dining hall
xxv. Equipment for dining kitchen
xxvi. Surveillance system along boundary / gates
(ii) SLR Engineering, Mumbai – for 2 years
a. In setting up real estate property for client in Thane. b. In setting up Bitumen Filling Plant in Bhiwandi
(iii) SAGA GLOBAL Consulatnts, Mumbai – for 2& 1 2 years a. In implementing following projects :
i. Construction of Oil storage terminals in Mozambique (Moputu & Beira cities) ii. Construction of Housing township for ADNOC in Ruwais, Abudhabi. iii. Construction of civil pumping stations along the cross-country pipeline route of British Petroleum in Georgia.
(iv) CUGL (Central UP Gas Limited), Kanpur- for long 6 years b. In setting up CNG / PNG infrastructure in the cities of Kanpur & Bareilly. c. Laying gas pipelines within the city and outside for intake. d. Setting up CNG stations
e. Setting up PNG network for house-hold supply of cooking gas. f. Setting up maintenance team with procurement of spares, technicians for immediate service when needed.
g. Maintaining emergency spares in stores and updating the list based on past consumption history.
h. Maintaining maintenance regular spares as per past consumption figures.
(v) Bharat Petroleum – for the long 30 years
i. in setting up infrastructure viz lpg bottling plant, oil storage depots, import terminal, jetty in JNPT Port, Mumbai, cross-country pipelines in India, ware-houses, staff housing colonies, maintenance of LPG plants/ bitumen plants/Lubricant Filling plants/equipment spares procurement, inventory control/Annual Maintenance Contract for machines/compressors etc
j. Maintenance/ upkeep/spares/fire drill etc for Fire Fighting set up incl maintaining adequate storage of water for fire fighting purpose. c. Total Experience in design/ project management/quality control/monitoring & site supervision, of setting up civil engineering infrastructure : Competent person with 36 Years of experience in project management, construction, procurement, quality control, site supervision, project monitoring, fortnightly review of progress, generating progress reports for higher management perusal, cost control and safety in civil engineering construction for setting up buildings / roads / water supply / drainage / utilities / yard lighting / landscaping / horticulture / furniture / IT backbone with server & networks / surveillance system / security house / gate / boundary wall / deep tube well / de-watering for deep excavations etc. d. Professional Qualification:
1) BE ( Civil) from JADAVPUR UNIVERSITY, KOLKATA in 1980 2) Well versed with MS Word, MS Excel, Power Point Sr
No
Name of University Date From Date To Degree obtained 1 Jadavpur University,
Kolkata
1976 1980 BCE ( Honours )
e. Key Domain Area / Responsibilities :
Planning Scheduling& Controlling Site Activities
Timely project completion with Quality control.
Ability to liaise with contractors and consultants Able to act on own initiative and in proactive way Good communication skills
Cash flow management
Business Development
Other Roles :
• Monitoring / Checking of materials and machinery utilization for construction activity planned / scheduled.
• Construction of road construction activities like Earthworks, sub-base course, base course, BM, PM etc in Flexible pavements, DLC, PQC in Rigid pavements of highways, runways, apron works, Bridge Foundation. Sub structure, PSC girders, Deck Slab
• Infrastructure developments like sewerage system, storm water drainage, Water line, etc. in proper mobilization as per the programme, BOQ & Technical Specifications
• Quality Control & Assurance at site.
• Co-ordination with consultant, architects, designer, contractors, sub- contractors, suppliers, labor contractors, etc
• Progress reviewing periodically with all stake holders.
• Quality assurance of construction as well as quality of materials supplied.
• Safety at site.
• Ensuring Monthly project report 1st week of following month.
• Appraising higher authorities at every stage of progress in comparison with bar-chart of progress planned vs actual including financials. f. Specialization and Expertise:-
1) Soil & foundation engineering
2) Working knowledge in computer application viz. MS Word, MS Excel, Power Point g. Professional Experience:
SR.
NO.
YEAR
ORGANISATION
POSITION
TYPE OF WORK DONE
FROM
TO
1
May 2014
31 Jan
2017
IIM KASHIPUR
Chief
Engineer
(Project)
• Planning, Budgeting &
Scheduling New Campus
of the Institute at earst-
while escort farm land.
• Appointment of Project
Management Consultant
for the project.
• Appointment of Architect-
cum- Campus Designer.
• Engagement of Contarctor.
• Soil investigation / survey
of the plot of land.
• Preparation/ approval of
Master Plan for the
project.
• Due diligence of design
of facilities as per Design
Basis Report finalized
finalized in consultation
with owner.
• Preparation of contract
document &
tendering/awarding/executio
n/contract administration/
site supervision/monitoring
/review
• Daily evening meeting
with all stake holders to
sort out any technical/
other problems affecting
progress.
• Ensuring supply of all
related materials required
as per bar-chart of daily
activities planned.
• Ensuring adequate labor
and their camp for
execution as per
schedule.
• Ensuring supply of
seasonal materials viz
bricks with advance tie-
up with brick kiln owners.
• Ensuring quality check of
materials being supplied.
• Ensuring construction
quality by proper training
to supervisors / project
engineers etc.
• Progress review with bar-
chart and analyzing delay
if any to find out reasons
for delay and action need
to be taken to over come
the short comings.
• De-watering issues to be
tackled as per procedure.
• Engagement of TPIA
services wherever
necessary.
• Installation of HVAC system
with procurement/installation
of chillars/ heat
pumps/piping/fittings/valves/pu
mps/filters etc
• Installation of solar heating
system of water to be used
for hostels / family quarters
• STP
• WTP
• SUB-STATION
The project of IIM Kashipur new
campus was divided into 2-phases.
Phase-1 costing 450 crores was under
execution under my leadership.
Following facilities was envisaged :
1) Academic Building
2) Administrative building
3) Library building
4) Dining building
5) Student hostels in 6- clusters
6) Faculty quarters in 4- clusters
7) Staff housing in 3-clusters
8) Utilities
9) Furniture for class rooms
10) Audio visual for class rooms
2
10th
March
2012
19th May
2014
SLR Engineering
Pvt Ltd
Chief
General
Manager
1. Business development.
2. Bidding for projects in civil
infrastructure sector.
3. Taking up projects.
4. Checking of design / drawings.
5. Execution, monitoring till
completion.
6. Measurement & Billing
7. Follow up for payment.
Projects handled are :
a. Setting up Housing
township in Thane,
Mumbai
b. Setting up infrastructure
for Bitumen Plant in
Bhiwandi, Maharashtra.
3
5th
August
2011
28th Feb
2012
SAGA GLOBAL
Consultant
Roles and Responsibilities
include :
1. Guiding the team in
project management.
2. Carrying out design by
design experts in the
field.
3. Preparation of BoQ &
scheduling of activities.
4. Progress review
5. Corrective actions
6. Ensuring safety / QA&QC
at construction site
Project :
1.Office complex, staff
housing for ADNOC,
Abudhabi.
2. Pumping stations for BP in
Georgia.
3. Oil Storage/ distribution
terminal in Mozambique
4
Feb 2005
31st July
2011
CUGL, Kanpur
Head-Project
Roles and Responsibilities
include :
1. Planning.
2. Budgeting.
3. Scheduling
4. Appointment of PMC
5. Rolling out project
execution including
obtaining all necessary
NOCs from gov etc
Achievement :
• Set up infrastructure for
CNG facilities in the cities
of Kanpur & Bareilly.
• Laying pipelines for
transportation of gas
from Bareilly to its
industrial hob.
• Construction of CNG
stations within Kanpur
and Bareilly cities incl
approach road,
installation of heavy
compressors, dispensing
units, odorisers, metering
system etc.
• Taking up pipeline works
for connecting house
holds in Kanpur and
Bareilly.
• Reduction of Air
Pollution in Kanpur.
• Connecting gas
pipelines to IIT, Kanpur
for its canteens.
5
11 th May
1981
Feb 2005
BPCL ( in its Civil
Wing )
Procurement
Leader
&
Project
Manager
• Designing of facilities.
• Cost estimation of
project based on market
databank for rates of
works/ materials.
• Budgeting materials
requirement after
obtaining feed back from
various project wings.
• Floating tenders for
works/ procurement.
• Contract administration.
• Preparation of SOR for
materials/ repetition
jobs.
• Execution of contracts
based on
design/drawings/tech
specifications.
• Monitor/update the progress
of work as per the schedule.
• Commissioning of units
and handing over
• Listing mandatory spares
and maintenance spares.
• Listing OEM agencies for
procurement.
Achievement :
1. Construction of
staff quarters for
officers ( 5- 8 storey
buildings in Noida )
2. Construction of jetty and
approach trestle at JNPT
Port, Mumbai.
3. Construction of import
terminal at JNPT.
4. Construction of staff
quarters in Mahul refinery
complex in Mumbai.
5. Materials procurement
using SAP in Noida office.
6. Constructed approach road
to airport runway in
Kolkata.
7. Constructed cross-country
product pipelines from
Manmad to Indore in M.P.
8. Construction of storage
terminals all over the
country incl all allied civil
works.
9. Maintenance of the
facilities.
10. Operation of LPG plant in
Uran
11. Maintenance of plant
12. Conducting fire drill with
neighboring industries
13. Managing work force
14. Dealing with trade unions
Training Course And Workshop Attended:
TRAINING
SL
NO Subject Period Venue
1. Basics of Computer Education 7-
days
ACE, Kolkata
2. Basics of Project Management 5-
days
Project Management Associates, Noida
3. Seminar on Paradigm Shift in Project Management 5- days
India Habitat Centre, Delhi
4. International Seminar on Concrete Technology 3- days
Hotel Taj Palace, Delhi
5. Project Management 3-
days
Project Management Associates
6. Managerial Effectiveness 5-
days
Administrative Staff Collage of India ( ASCI), Hyderabad 7. Team Building 5-
days
HR Consultant, Bhubaneswar
8. Supply Chain Management 5-
days
MDI, Gurgaon
Professional Membership
1. Member of Institution of Engineers, India ( MIE ) 2. Chartered Engineer
h. Languages:
Language Read Write Speak Understand
English Excellent Good Good Good
Hindi Excellent Good Good Good
Marathi Excellent Good Good Good
Certification:
1. I am willing to work on the project and I shall be available for entire duration of the project assignment and I will not engage myself in any other assignment during the currency of his assignment on the project. 2. I, the undersigned, certify that to the best of my knowledge and belief, this bio- data correctly describes myself, my qualification and my experience. 3. I also confirm that I shall work in a transparent manner with integrity, honesty and goodwill, as a team leader of Project Team. 4. I shall also guide juniors to deliver as per Institute’s expectation. Signature of the Member
(Resident of Greater Noida) Place : Greater Noida
e-mail id- ************@*****.*** Date : 21.10.2017 Cell no. 967-***-****