Post Job Free

Resume

Sign in

Project Engineer civil

Location:
Dubai, DU, United Arab Emirates
Salary:
15000
Posted:
March 14, 2018

Contact this candidate

Resume:

PROJECT MANAGEMENT PROFESSIONAL – PROJECT ENGINEER CIVIL

Successful track record as Project engineer civil with 12+ Years EPC experience for executing prestigious projects in the field of high rise building, Infrastructure, Pipelines, Oil & Gas (bridge, road, asphalt, cross country pipeline, upstream, green & brown field) from top tier main contractors at India, Qatar, Oman & UAE with valid driving license

Executive summary

Competent, diligent and result oriented civil engineer with knowledge of oil gas standards, highway standards, building methods, modern construction technology, quality systems, health & safety norms (HSE Guidelines)

Involving flawless project delivery (FPD) activities Q captain as a discipline focal point for civil, mechanical, electrical, instrumentation works completion walk down to facilitate with DEP & PDO specification requirements

Referring American, British standards (AASHTO, ASTM, BS, FS), Asphalt manual (AIM), SHELL DEPs, GCC standards (ADM, QCS, RTA, OCS) to establish ‘Q’ areas, ‘Q’ captain for on-site flawless organization by training

Expertise in supervise project activities in diverse areas like project management, construction supervision, resource allocation (men, machine, material) by streamlining site activities for maximizing productivity

Articulate communicator, skilled at effectively collaborating with client, designer, consultant to freeze technical parameters, work scope to iron out any ambiguities and providing technical validation for jobs

Reviewing AFC drawings, Identifying critical issues related to construction stage and ensuring timely resolution of queries with Field change requests (FCR) so as to ascertain uninterrupted progress by solving site disputes

Completed many critical activities like heavy equipment installation, structural steel erection, flow lines, pipeline construction, emergency jobs, hookups with pre-commissioning & commissioning activities

Professional competencies in reviewing the technical and commercial aspects of the project, preparing proposals, budgeting, implementing cost reduction processes while ensuring quality benchmark of the project

Core competencies

EPC Infrastructure Highways Bridge Asphalt Under pass Tunnel Culverts Piling

Oil and Gas Onshore Greenfield Brownfield Upstream Wellheads Tank farms Flow line

Cross country pipeline STP, ETP, WTP Substation Pump house OHL Utility Oil Plants Industrial building Stone/concrete foundations Project management Construction management

Professional Experience

China Petroleum Engineering & Construction Corporation since Oct 16

(Project Engineer – Infrastructure, Oil & Gas)

AL Tasnim Enterprises LLC (Project Engineer – Bridge, Road & pipeline) Sep 14 to Nov 15

Yuksel Inshaat A.S (Site Engineer – Bridge, Road & pipeline) Oct 11 to Aug 14

Larsen & Toubro Limited (Site Engineer – Building & Factories) July 06 to Sep 11

Achievements

Saved 7.50 million AED by replacing fill material from engineering fill to general fill at mender asphalt road

Saved 0.53 million OMR by finding natural soil & water resource at wadi with proper approval from municipality

Successful achievement of 7.5 & 6 million safe man hours respectively in salwa & lusail road projects

Upgradation of 2.3 km highway including existing underground utilities without damage at salwa project

Achievement of 8 days cycle for slab of 13000 sq.ft by using table formwork system in high rise building project

Projects Undergone

EPC Contractor : China petroleum engineering & construction corps Client : ADCO value : 1.14 billion AED

Project Title : EPC for Mender field development project – phase 1, Mender oil field Abu Dhabi - UAE

Nature of work : Green & Brown field construction (110 oil wells, gathering station, pipeline, OHL, substation, road)

Responsibilities : Project Engineer-well heads, gathering station, RCC culverts, pipeline berm & asphalt road(24 km)

Preparing, reviewing project execution & quality plan (PEP,PQP), method statements (MS), inspection test plan (ITP), material approval sheet (MAS/MAR), construction schedule (P6 Program, S curve & histograms)

Raising technical quarries with FCR to design consultant by drafting official letters for flawless coordination with vender, consultant & subcontractors to attain the progress as per baseline program

Participating weekly construction progress meeting with client, consultant & sub-contractor to implement resolution points; participating in quality assurance activities (audits) during FSI implementation process

Grading, site marking, excavation, blinding, waterproofing, screed and backfilling for potable water skid, multiphase flow meter, emergency generator, chemical shelter, valve boxes, pig receiver and pig launcher

Deep excavation, shuttering and reinforcement works for close drain booster pump, control room building, substation ( 230 KV) with all mechanical, electrical & instruments embedment provision

Executing all civil related works in capacitor banks, harmonic filter, nitrogen receiver, chemical injection skid, nitrogen skid facilities with cable trenches backfilling by general fill and engineering fill material

Executing GRP/HDPE Pipelines works with welding shear test, vacuum test, stress test for 3”Nitrogen line, 4” flow line, 8” transfer line, 14”export line using pipe racks, pipe sleepers, berm & side slop construction

Execution of earth work for various foundations, asphalt road embankment, OHL and pipe line berm; Casting of RCC & pipe culverts, flow line duct banks, soil stabilisation, slope protection in dune sand hills

Construction of median barrier, speed humps, curb stone, interlock fixing, installation of traffic sign boards, concrete posts and bollards, reflecting studs and road lane marking using thermoplastic paint

Laying of sub grade, aggregate base course (ABC), asphalt pavement like base course and wearing course; As-built drawings preparation with all related information for final submission to client’s record

EPC Contractor : Al Tasnim Enterprises LLC Client : Muscat municipality Project value : 14.5 million OMR

Project Title : EPC for Access asphalt roads with utilities at Al-Amerat Location : Muscat – Oman

Nature of work : Culvert, road, pipeline, rock cutting, utilities, slope protection & asphalt- 40 km

Responsibilities : Project Engineer- Bridge, culvert, Hill (mountain) roads, pipe line, slope stability & utility works

Very close coordination with municipality, vendors, designers and various government ministries for data collections, NOC procedures and approvals; establishing labour camp & site office with all facilities

Preparing project execution & quality plan (PEP,PQP), method statements (MS),inspection test plan (ITP), material approval sheet (MAS / MAR), construction schedule (P6 Program, S curve & histograms )

Negotiation and Finalising various subcontractors for some special works like rock blasting, topographic survey, existing utilities identification; preparing procurement schedule & shop drawings submittal log

Carrying out rock cutting, shotcrete, rock/soil stabilisation, mass back filling, fire hydrant, Irish crossing, (Box, slab, pipe, single & multi cells) culverts, bridges, outer RCC drain, canal earthwork and lining

Execution of pipeline work such as storm water, potable water, irrigation, land drain, sewerage system, raw water pipeline using DI,MS, BWSC, HDPE, UPVC, GRP & vitrified clay pipes with hydro pressure tests

RCC structures casting for underground intake pump house, water treatment plant, cross country pipe line ( 500 mm to 3000 mm dia) & underground tunnelling for utilities laying on multi-disciplinary projects

Laying sub grade, granular sub base(GSB),aggregate base course(ABC), asphalt base course, wearing course for rigid/flexible pavement with polymer modified bitumen; Fixing curb stone, interlocks & reflecting studs

Installation of traffic sign boards, speed humps, concrete posts/bollards, road lane marking; landscaping work (stamp concrete, raiser planter, trees, plants); As-built drawings preparation for final submission

EPC Contractor : YukSel – Midmac joint venture Location : Doha – Qatar

Project 1 : EPC for Salwa road phase ll. Doha expressway package 7 Client: Ashghal Value: 1.2 billion QAR

Project 2 : EPC for Lusail expressway primary infrastructure - CP 4 Client: Qatari Diar Value: 1.6 billion QAR

Nature of work : PSC Box girder & truss bridge, underpass, micro tunnels, elevated highways, pipelines & utilities

Responsibilities : Site engineer - Box girder/ truss bridges, under pass, pipe line, highway, utility & electrical cables

Execution of grading, excavation, earth moving, filling, compaction, soil stabilisation, ground anchors, geo textile laying, structural fill, blinding and protection screed for water proofing works

Boring, casting, cutting and grouting of cast in situ, continuous, barrette, shoring, friction/cohesion piles with appropriate integrity, plate load, plate bearing, lateral load, dynamic, reaction and tensile load tests

Deep excavation of access shafts by Tunnel Boring Machine(TBM) for micro-tunnelling and trencher machine for pipeline works with continuous dewatering by boreholes to maintain ground water table

Construction of RCC structures like mass raft, pile cap, pier, retaining wall, tunnel, truss column, head walls, base slab, concourse slabs using doka, peri, acrow form work systems for box girder & truss bridges

Casting of superstructure approach slab, deck slab, vehicular underpass, interchange, abutments, bearing pedestals, parapet wall, installation of pier bearing and expansion joints filling

Complete cable profile, staging erection, launching girders, dry matching, gluing of segments, piers fixing, anchorage, stressing and grouting of PSC box girder integral structures for cable stayed bridge

Execution of cross country pipeline such as storm water, potable water, foul sewer, TSE line & sewerage network using MS, DI, BWSC, HDPE, UPVC, GRP, RCC pipes with welding, hydraulic and gas pressure tests

Construction of collection manholes, access shaft, gullies, pumping station, RCC tanks, washout, ventilation, air valve chambers related to STP, ETP, WTP structures using cast in situ and precast method

Executing of underground utility ducts & trenches with cables laying for telephone, DSSS, SCADA, electrical cables (LV,MV,HV– 11 kV, 33 kV, 66 kV), Construction of fire hydrant, culverts & mass back filling

Laying of flexible and rigid pavements using sub grade, GSB,ABC, asphalt base course and wearing course; paving cycle path & foot path; fixing of median barrier, kerbstone and interlock with pedestrian crossing

Construction of speed humps, signal gantry foundation, traffic sign boards, bollards, reflecting studs, road lane marking; Execution of landscaping work (stamp concrete, raiser planter, trees, plants, grass)

EPC Contractor : Larsen & Toubro Limited Location : Chennai, Mumbai – India

Project 1 : Tata consultancy services - IT park Client : Tata consultancy Value: 360 Cr INR

Project 2 : Estancia – IT SEZ park Client : Arun excello Value: 110 Cr INR

Project 3 : Century bhavan complex (B3 + 31 Flores = 154 m ) Client : Century international Value: 180 Cr INR

Responsibilities : Construction of high rise and office complex building, IT park, substation, pump house ( EPC )

Execution of sub structure and super structure with water proofing, anti-termite, pile cap, grade slab, mass raft, retaining wall, ramp, car parking, lift & shear walls; vacuum dewatering floor VDF, screed & backfilling

Post tensioning (PT) works for slab, beams including alignment of PT cables & grouting; Erecting scaffolding works for jumping formwork, table form work and slip formwork using formwork scheme drawings

Construction of electrical substation, pump house, sewage treatment plant(STP), Hub room, AHU room, lift room; casting of pedestal, foundations for fabricated & rotating equipment with related MEP embedment

Execution of block work, plastering, screed, VDF, epoxy, floor tiles, painting, false ceiling and cladding; Maintaining ISO reports, closing NCRs, Preparing variation on measurements and sub-contractor bills

Educational & Personal details

Diploma in civil engineering : Government polytechnic college – 84 % (Anna University )

B-Tech in civil engineering : Rajasthan Vidyapeeth ( Tentative date of completion is July 2018)

Certificates : AutoCAD, IOSH-MS, H2S (Level 2 ) Computer proficiencies : MS office, SAP, Aconnex, Wrench

LinkedIn : https://in.linkedin.com/in/ramkumar-kasilingam-711bab8b Skype: ramkayramesh

Email & hangout: ac1zn2@r.postjobfree.com Mobile, whatsapp & IMO : 0091 - 957**-*****, 908**-*****

Passport no : H8250116 – Expires on 2021 GCC manual driving license issued from UAE & Oman

Address : 2/368/3, Mohanur, Namakkal, India–637015 Linguistic : English, Hindi, Tamil, Telugu, Malayalam



Contact this candidate