Randall L. Miller
Address: *** **** ****, **** ********, Missouri 64834
Phone: 417-***-****
Mobile: 417-***-****
Email: ac1z0m@r.postjobfree.com
Plant Manager ~ Operations Manager ~ Engineering Manager
Qualifications Profile
Systematic, accomplished, and seasoned professional with over 15 years of experience in plant management, facilities operations,
production lines, logistics, and project management; coupled with proven success in identifying revenue-generating and expense-saving
opportunities.
Effective at implementing innovative strategies to exceed set-forth objectives, maximize growth opportunities, and streamline
operations. Armed with first-rate management skills in leading teams to enhance processes, optimize productivity, and boost efficiency.
Equipped with articulate communication and interpersonal aptitudes, essential in establishing rapport with professionals at all levels.
Proficient with Microsoft Office Suite, Minitab, and AutoCAD.
Areas of Expertise
Equipment Preventative Maintenance Continuous Process Improvement Budget and Cost Optimization
Six Sigma Methodologies Quality Control and Assurance Site and Personnel Safety Regulatory Compliance
Relevant Experience
TAMKO Building Products Inc., Several Locations
General Manager, Lamar, MO Nov 2011–Jul 2017
Managed a total of $160M composite decking and railing of two separate manufacturing facility locations with more than 50 personnel
Oversaw environmental and personnel safety, product quality, operations, reliability, engineering, logistics, and continuous
improvement
Key Highlights:
Pioneered the successful launch of multiple Envision decking product lines and reduced production cost by 25% through implementation of
continuous process improvement and utilization of Six Sigma methodologies
Drove reliability efforts in migrating facility from 90% reactive to 90% scheduled maintenance, which minimized maintenance expenses by
35% and operational downtime and required maintenance technicians by 50%
Administered numerous continuous improvement projects, thus lessening waste by 50% and optimizing production rate by 15% in over two
years
Handled the installation of equipment to automate 30 positions, which saved over $2M in annual operating costs
Implemented cost-reduction strategies and improvement projects which generated more than $1M savings every year
Maintained and ensured safety on facilities through facilitation of training to personnel on hazard identification and mitigation,
behavioral-based safety programs, and employee-led safety teams, thereby attaining a plant record of 564 days without an Occupational
Safety and Health Administration (OSHA) recordable incident
General Manager, Columbus, KS Apr 2010–Nov 2011
Held accountability in supervising all facets of operations in Spunbond, Waterproofing, and Cements and Coatings manufacturing facility
Led a facility comprised of 35 personnel and carried out several duties, including facility operations management, engineering,
logistics, process enhancement, site safety, and product quality assurance
Key Highlights:
Developed several automated equipment for the waterproofing, and cements and coatings lines, which saved $700K in annual operating
costs
Made significant contributions in enabling the facility to be the first in the company to automate processes, allowing production lines
to operate with only two operators per shift
Assistant General Manager, Frederick, MD Feb 2009–Apr 2010
Provided leadership to all engineering, quality assurance, facility maintenance, support, and shipping operations at the largest
shingle manufacturing facility in the world
Offered direction to Shipping and Receiving Department to efficiently manage over 200 trucks per day, as well as Maintenance Department
to effectively perform preventative and predictive maintenance on all equipment
Strategically led project management activities of four engineers on environmental, safety, automation, and process improvement
projects, as well as with five laboratory technicians to ensure compliance of product with ASTM quality standards
Key Highlights:
Monitored large limestone grinding mill facility without any reported Mine Safety and Health Administration (MSHA) incident
Singlehandedly managed a $300K worth of project in completing overhaul of employee’s locker room and main plant meeting room
Plant Engineer, Frederick, MD Jan 2008–Feb 2009
Carried out all engineering and maintenance activities, while leading project management initiatives of four engineers
Assumed leadership role in managing Maintenance Department with 40 staff while guiding them in performing preventative and predictive
maintenance on all manufacturing-related equipment
Key Highlights:
Efficiently handled $5M maintenance budget through proper allocation and management of resources
Headed maintenance spare parts inventory-reduction project, thus minimizing costs of obsolete parts by $150K and reducing stock levels
Installed nuclear gauging device on shingle production line, which lessened weight variation, and diminished material costs
Assistant General Manager, Phillipsburg, KS Sep 2006–Jan 2008
Spearheaded project management operations of four engineers to support environmental, safety, automation, and process improvement
projects.
Directed the operations of the Maintenance Department, which involved supervising 38 staff on all plant activities, including
preventive and predictive maintenance of all manufacturing related equipment
Guided five laboratory technicians to guarantee alignment of product quality with ASTM standards
Supervised Shipping and Receiving Department operations to successfully complete more than 80 trucks per day and 20 rail cars
Managed trucking operations to distribute daily round trip loads to Denver, Colorado
Key Highlights:
Accomplished a $3M project in converting a shingle production line to generate metric-size shingles, which produced more sales square
per hour
Took charge of $5M asphalt yard improvement project for Spill Prevention, Control and Countermeasure (SPCC) and ensured alignment with
EPA’s oil spill prevention program
Earlier Positions Held:
TAMKO Building Products Inc., Phillipsburg, KS
Plant Engineer
USS Dwight D. Eisenhower, Norfolk, VA
Reactor Electrical Assistant
Propulsion Plant Watch Officer Division Officer
Other Experience
US Northern Command (NORTHCOM)/North American Aerospace Defense Command (NORAD), Colorado Springs, CO
Duty Director – Intelligence in Space and Missile
Education and Credentials
Master’s Degree in Engineering Management, GPA: 3.5 - Old Dominion University, Norfolk, VA
Bachelor of Science in Mechanical Engineering - Kansas State University, Manhattan, KS
Graduate Level Engineering Courses - Naval Nuclear Power School and Prototype, Orlando, FL and Charleston, SC
Relevant Coursework: Math, Thermodynamics, Chemistry, Physics, Reactor Theory, Electrical Engineering, Materials and Plant Operations,
and Design and Operations of Mechanical and Electrical Systems in a Nuclear Power Plant
Lean Six Sigma Green Belt Certified
Professional Development
Lean Six Sigma Black Belt Training Engineers in Training Examination
Activities
Assistant Scoutmaster – Local Boy Scout Troop Eagle Scout – Boy Scouts of America