From: Bipin B.Vanzara
B-*/Sangam Park,
Near Wadi Mahadev talav, Near Bhavani Kunj,
B/h. Ram Vatika,
Panigate, Vadodara-19.
:966-***-**** Email:-ac1xxi@r.postjobfree.com
To,
Sub: - An Application for the Post of WELDING Egg / Quality Control Egg.
Respected Sir,
With reference to captioned subject I submit my candidature for the Mechanical Engineer. My detailed Bio-Data along with copies of testimonials are appended for your kind and sympathetic consideration please.
I will be highly thankful to you if you will consider my application sympathetically and favour me by interview to prove myself worthy for the post.
Thanking you Sir.
Yours faithfully . (B.B.Vanzara)
BIO-DATA
NAME: - BIPIN B.VANZARA
ADDRESS: - B/7, SANGAM PARK,
NEAR WADI MAHADEV TALAV,
NEAR BHAVANI KUNJ,
PANIGATE, B/H. RAM VATIKA,
VADODARA-390019.
ac1xxi@r.postjobfree.com
DATE OF BIRTH: - 16-06-1977
HIGHT: - 5’4”
WEIGHT: - 56 Kg.
QUALIFICATION: - S.S.C. PASSED IN MARCH-1992
D.M.E. IN 1995 IN M.S. UNIVERCITY OF BARODA
PASSED.
TECHNICAL QUALIFICATION: -
CSWIP 3.1 ( WELDING INSPECTOR)
N.D.T. LEVEL – II IN ULTRASOINC TESTING (U.T)
FROM MODY INSTITUE& MP, DP,RT
EXPERIENCE: - 1) I AM WORKING AS A QA / QC ENGINEER WITH
RELIANCE INDUSTRIES FROM 18nd FEBRUARY 2016
TO STILL THIS DATE
2) I WAS WORKED AS A QA / QC ENGINEER WITH
RELIANCE INDUSTRIES FROM 2nd JANUARY 2015
TO JUNE 2015
3) I WAS WORKED AS A QA / QC ENGINEER WITH
JNV VIRA Engineering PVT LTD FROM 2nd JUNE
2014 TO 26th DECEMBER 2014 at BARODA
4) I WAS WORKED AS A QA / QC ENGINEER WITH
NASER M. BADDAH & PARTNER GENERAL TRD
CONT.WLL IN KUWAIT FROM 27TH JUNE TO
NOV 2013
5) I WAS WORKED AS A QA / QC ENGINEER WITH
RELIANCE INDUSTRIES FROM 4TH JANUARY 2013
TO MAY 2013
6) I WAS WORKED AS A QA / QC ENGINEER WITH
NASER M. BADDAH & PARTNER GENERAL TRD
CONT.WLL IN KUWAIT FROM 30TH JUNE TO 11TH
OCT 2012
PROJECT : LPG TRAIN 4 AT MINA AL AHMADI REFINARY
CLIENT : KUWAIT NATIONAL PETROLEUM COMPANY
(DAELIM)
a) Check & update the vender’s calibration procedure
b) Preparing status of each & every pipe spools, pipe
Supports which are shop fabricated & released to site.
c) Preparation & development of daily fit up reports & daily
Welding reports
d) Arrangement of NDT group as per the site requirement for
DP, RT & POSITEV MATERIAL IDENTIFICATION
e) Physical check of line in accordance with P&ID and
Isometric drawing & preparing punch list
f) Preparing of hydro test package on time
7) I WAS WORKED AS A QA / QC ENGINEER FOR SAMSUNG Engg AT OPAL PROJECT THROUGH
ZEPPELIN FROM 5TH APRIL TO 11TH JUNE 2012
a)Worked at Bharuch at Dahej site Inspection of pipe spool
Fit up, weld visual inspection, pipe line physically check
As per isometric drawing & P&ID and given punch
Point. Pressure test check & offer to third party (EIL)
9) I WAS WORKED AS A QA / QC ENGINEER WITH
ESSAR PROJECTS FROM 28TH MARCH 2011
TO 27TH MARCH 2012
a) Worked in refinery Expansion Project at JAMNAGAR
GUJARAT. Inspection of piping material by PMI test,
Fitup inspection,WPS verification& weld visual inspection,
Welder qualification test, Surveillance during welding,
PWHT monitoring, stage wise checking of welding
Process according to ITP & inspection check list, Hardness
Test of butt joint after PWHT. Witnessing pressure test &
Review of test pack documents.
10) I WAS WORKED AS A QA / QC ENGINEER WITH
RELIANCE INDUSTRIES FROM 6TH JANUARY 2011
TO 25TH MARCH 2011
a)Worked in FCCU shutdown plant. Inspection of Pre shutdown pipe spool in shop in CS & AS material.. Inspection of pipe fit up; weld visual lot wise NDE selection. PWHT monitoring, Pressure test check
11) I WAS WORKED AS A INSPECTION ENGINEER IN
SGS INDIA PVTLTD FROM MAY2010 TO NOV 2010
a)SGS is third party Inspection Company .I was Worked in
Hindustan zinc in Pantnagar Uttarakhand. Inspection of CS pipe fit up weld visual & making of visual inspection reports.
12) I WAS WORKED AS A QA / QC ENGINEER WITH
JNV VIRA Engineering PVT LTD FROM 1ST SEPT
2009 TO 30th APRIL 2010 at BARODA.
a) JNV VIRA is Subcontractor Company making of IOCL
Pipe spool of CS, P5, &P11 material. Inspection of pipe
Fit up, weld visual&RT offer to NDE agency& spool
Inspection offer to client (Punj Lloyd)
13) I WAS WORKED AS A QA / QC ENGINEER WITH
RELIANCE INDUSTRIES FROM 28TH SEPT 2006
TO JULY 2009
(a) WORKING AT JERP SITE FOR QUALITY CONTROL OF DIFFERENT KINDS OF PIPING SPOOLS WELDED BY WELDING PROCESS MADE OF CS AS DIFFERENT WELL AS SS BY FOLLOWING ASME SEC B31.3
NATURE OF WORK.
Inspection of Piping Material by PMI Test,
Fit Up & Weld Visual
Welder Qualification
Monitoring Of Welding Consumables
Storage, Handling, Backing & Holding
Lot Wise NDE Selection & PWHT Monitoring
Final Clearance & Completation of Releasing Document As Well As Maintenance of Records.
Stage wise Checking of Welding Process according To ITP & Inspection Checklists.
NDE Inspection of All Butt Welds above Ground As Well As Under Ground Pipes.
Checking Of Wrapping Coating of Piping Jobs.
Hardness test of butt joints after PWHT.
Preheating of welding joints.
14) WORKED IN MET-HEAT ENGG. PVT. LTD.
METALLURGAL & HEAT TREATMENT.
ENGINEER IN PHYSICAL DEPARTMENT FROM
1ST SEPT-1996 TO 30TH OCT’98 AS AN
ENGINEERS.
a) MET HEAT is mechanical testing lab. I was check a tensile
testing of CS,SS,AS material., bend test, nut proof load, check
Pipe flattening test, nick test. Tensile test inspected third party
Like LRIS, EIL, BVIS, TOYO, TUV Etc.
15) I WAS WORKING WITH TUBE PRODUCTS INC. (TPI)
AS-a Q.A. ENGINEER FROM NOVEMBER’98 TO
23rd SEPT-2006.
COMPANY PROFILE: - M/S Tube Products in Corporate (T.P.I.) is ISO
9001-2000 certified Company. TPI is a largest Pipe
Fittings. Manufacturer in ASIA. Specialist Manufacturer
of top line welded & Seamless, Pipe fittings Of CS, AS,
S.S. like Elbows, Tees, Reducers, Caps, Bend, Stubends,
Cladded & Non.Cladded spool etc.
Company is approved by EIL, LLOYDS, TPL, TUV,
BVIS, SGS, IBR, TOYO, DNV, PDIL, KNPC & others
International World wide third party Inspection Agencies.
NATURE OF WORK: -
A) IN COMING INSPECTION(Plates, Pipes, Forging etc.)
Inspection of raw material (Visual & dimensional).
Verification of mill test certificates against applicable
Code and code’s specifications.
Identification of raw material under third party
Inspection agency.
B) IN PROCESS INSPECTION:
To study detail requirement of client from the P.O. & Technical
Specification with a view of quality fulfill-Ment.
Carry out Inspection as indicated in quality assurance Plan (QAP) like
Set up, welding heat treatment & dimension. Follows all steps of Q.A.P.
Carrying out destructive & nondestructive tests
According to Q.A.P./P.O./Technical specification e.g.
TENSILE, IMPACT, BEND, HYDROTEST, HARDNESS, U.T., R.T., D.P.I, M.P.I, CHEMICAL, P.M.I, I.G.C.
C) FINAL INSPECTION: -
Visual & Dimensional check the products as per standard.
Witnessing Pressure tests like Pneumatic & Hydro tests.
Offering the fitting to third party inspection Agency like EIL, LRIS,
TPL, BVIS, TOYO, TUV, DNV, PDIL, IBR, KNPC, SGS etc.
Preparing all the repots of job performing collecting all the testing &
Technical reports & submitting to the relating department / person.
Documentation (Approving manufacturing Test Certificate) Inspection is carried out as per ASME Standard.
Yours faithfully,
(B.B.Vanzara)
* * * * * * *