Post Job Free

Resume

Sign in

Electrical Engineer

Location:
Jakarta, Indonesia
Salary:
18000000
Posted:
August 14, 2017

Contact this candidate

Resume:

CURRICULUM VITAE

I. Personal Data

Name : Alfadani, ST

Place & Date of Birth : Padang, October 06th, 1982 Nationality : Indonesia

Gender : Male

Marital Status : Married

Address : Jln. Panaragan Aspol No.6-7 Rt 04/04 Kelurahan Panaragan, Bogor Tengah, Kota Bogor 16125 -

Indonesia

Mobile No 1. : 081********

Mobile No 2. : 087*********

E-Mail Address : ac1tsb@r.postjobfree.com

ac1tsb@r.postjobfree.com

II. Educational Background

a. Elementary School : SD Negeri Bangka 3 Bogor - (Year 1988-1994) b. Junior High School : SLTP Negeri 3 Bogor – (Year 1994-1997) c. Senior High School : SMU Negeri 6 Bogor – (Year 1997-2000) d. Highest Level : Bachelor's Degree

Field of Study : Engineering

Major : Electrical

Faculty : Industrial Technology

Institute/University : Trisakti

Graduation Date : December 2005

Final Thesis : Measuring Instrument level of darkness color III. Computer, Hardware & Language Skill

Computer literate : Microsoft Word, Excel, Power Point, AUTOCAD, Adobe Photoshop CS2, protel, language program of C++,

WINDLDR LG PLC program, Twido Program, WinCC

flexible, Simatic 7, Calculux, Dialux, ETAP 12, EPLAN, Suite PLC program-Schneider and Internet.

Hardware Skill : Variable Speed Drive – Inverter Schneider Altivar and Siemens (Sinamics), Soft start ABB, Schneider, Star delta Contactor, Circuit Breaker, Switchgear SM6

Schneider, Transformer Step down and Step Up,

Deep sea synchronize module 7210 / 8210, PLC

Modicon, PLC S7-300, PLC S7-1200, Module I/O

digital and analog, HMI, Scalance Fiber Optic.

Language : Indonesia, English, French (passive).

IV. Training & Courses

August 2000 : Graphical Design (AUTOCAD) - Bima Computer June 2004 : Local Network Access Radio Division - PT. Telkom September 2005 : Microcontroller 8051 Training - Prasimax December 2007 : Basic PLC-LG Training

August 2008 : Coal Sampling, Preparation, Analysis and LS Certification - PT. Carsurin

February 2009 : Understanding, Documentation & Implementation Of QEMS ISO 9001 & ISO 14001 – PT. Kideco Jaya

Agung

May 2009 : Basic and Advanced PLC Training – PT. Schneider Feb 2013 : Product Knowledge Reclaim Feeder-Stamler, USA Kentucky

Jan 2013 : Metal Detector & Belt Scale Training – Thermo fisher, USA Minneapolis

Feb 2013 : Magnetic Separator Training – Dings, USA Phoenix Oct 2013 : Beam and Lamp fabrication – Philips, China Chengdu Feb 2014 : PLC WinCC Flexible and TIA Portal – Simentek V. Working Experience

1. PT. SUPRABARI MAPANINDO MINERAL

Position Title : Electrical Engineer Specialist

Position Level : Engineering

Specialization : Electrical

Direct Supervisor : Naotaka Taniguchi

Job location : Agus Salim - Jakarta, Bangkuang, Jamut, Menyango, Bintang Ninggi, Sekako - Central Kalimantan, Indonesia Industry : Coal supplier and Trading

Duration : April 12, 2010 - Present

PT. SUPRABARI MAPANINDO MINERAL (PT. SMM) and PT. MARUNDA GRAHAMINERAL (PT.MGM) is the group coal company in Central Kalimantan, Indonesia with spec premium (cocking coal) range calories 6800-8000 Cal. Area mining location PT. SMM at Sekako and facility jetty/port area at Bintang Ninggi. PT. MGM have area mining location at Menyango and facility jetty/port area at Jamut. Location of intermediate stockpile facility PT. SMM and PT. MGM at Bangkuang. In march of 2017 the share ownership of PT. SMM in the acquisition by PT. Tuah Turangga Agung is an Astra International Group.

Work Description:

A. Responsibilities

Managing & Coordinator for all electrical and instrument project

Gave advice for electrical work system, procedures, methods of installation and vendor drawing.

Creating a project contract, the estimated cost/bill of quantities of the project and technical specifications of electrical and mechanical work

Prepare and Planner make a electrical system as basic design, detail design, and construction drawing;

Reviewing and giving advice the Electrical design and calculation of power distribution, HVAC, Control Panel, lighting, instrument and safety device, CCTV analog or digital, MCC, Relay panel, PLC panel, Synchronize panel 3 unit genset 1875KVA, switch gear 3,3 KV, Grounding and lightning system, transformer step up and step down, Capacitor bank, Building Power Supply, Firefighting and fire alarm, ducting system, LDS, LCP, LCS, COS Socomec ATyS3 and others.

Responsible to achieve efficiency, target & quality

Analyze inspect problem & create action plan

Verification of electrical design activities; single line, three line and multiline wiring diagram, lighting, electrical construction/building, HVAC and cable size calculations.

Supervise of Weight in Motion for truck weight scale, Electrical layout preparation; cable control layout, cable tray and ladder layout, lighting layouts, etc.

Monitoring manpower of installation power lighting, underground and air cable installation system, electric control for drive unit belt conveyor, generator set synchronization system

Make progress report and final report

B. Project Completed

Project name :IMPROVEMENT OF ELECTRICAL SYSTEM AT ISP BANGKUANG

Location : PT. MARUNDA GRAHAMINERAL –Central Kalimantan, Indonesia EPC : PT. Prambanan Dwipaka

Duration : August, 2012 – July 2014

Position : Coordinator and PIC electrical project

Project name : ADDITIONAL FUEL TANK STORAGE AT ISP BANGKUANG Location : PT. MARUNDA GRAHAMINERAL –Central Kalimantan, Indonesia EPC : PT. SIKO Engineering

Duration : August, 2012 – Sept 2015

Position : Coordinator, Engineer, PIC of electrical and instrument work

Project name : WATER TREATMENT PLANT AT ISP BANGKUANG Location : PT. MARUNDA GRAHAMINERAL –Central Kalimantan, Indonesia Contractor : PT. ESWAREKO

Duration : June 2012 – February 2013

Position : Coordinator, Engineer, PIC of electrical and instrument work

Project name : COAL MINING FACILITY PHASE 1 AT PORT AREA BINTANG NINGGI

Location : PT. SUPRABARI MAPANINDO MINERAL, Central Kalimantan. EPC : PT. WASKITA KARYA JO JAKARTA PRIMA CRANES

Duration : June, 2012 – February 2015

Position : Coordinator, Engineer, PIC of electrical and instrument work

Project name : COAL MINING FACILITY PHASE 1 AT MINING AREA SEKAKO.

Location : PT. SUPRABARI MAPANINDO MINERAL, Central Kalimantan. EPC : PT. WASKITA KARYA JO JAKARTA PRIMA CRANES

Duration : June 2012 – February 2015 (stop of contract) Position : Coordinator, Engineer, PIC of electrical and instrument work 2. PT. KIDECO JAYA AGUNG, Tbk - COAL SUPPLIER

Position Title : Electrical Engineer

Position Level : Engineering

Specialization : Electrical

Direct Supervisor : Park Yong Sin

Job Location : Batu Sopang, Batu kajang - Mine Site (East Kalimantan) Industry : Coal supplier

Duration : July 02, 2007 - 2010

KIDECO is the large of coal company in Indonesia in terms of coal production with a substantial reserve base of approximately 40 billion tones. PT KIDECO Jaya Agung (KIDECO) explores, develops and produces coal in the Paser area in East Kalimantan.

Work Description:

A. Responsibilities

Regarding the project and specification

Responsible to achieve efficiency, target & quality

Analyze daily inspect problem & create action plan

Creating a project contract, the estimated cost/bill of quantities of the project and technical specifications of electrical and mechanical work

Planner and make of drawing Electrical system; Building and construction Power Supply, Control Panel motor belt conveyor (BC drive), Feeder Breaker motor control power, Control panel with drive unit soft start for Submersible pump 54 KW, Synchronous panel for generator set 4 x 1MW and Synchronous panel for generator set 1 x 200 KW with 2 x 512 KW

Maintenance and monitoring system control of MV and LV, PLC programmable

Verification of electrical design activities; single line wiring diagram, lighting and cable size calculations

Electrical layout preparation; cable control layout, cable tray and ladder layout, lighting layouts, etc

Monitoring manpower of installation power lighting, underground and air cable installation system, electric control for drive unit belt conveyor, generator set synchronization system

Make progress report and final report

B. Project Completed

Project name : PASIR COAL PROJECT 5th STAGE – MINE FACILITIES Location : PT. KIDECO JAYA AGUNG, Tbk

Duration : October 09, 2008 – March, 2009

Position : Surpervisor, Inspector and PIC Electrical

Project name : WORKSHOP CONTRACTOR 5 BAY (PT. EVA NOOR) Location : PT. KIDECO JAYA AGUNG, Tbk

Duration : January 06, 2009 – April 30, 2009

Position : Surpervisor, Inspector and PIC Electrical

Project name : WORKSHOP CONTRACTOR 5 BAY (PT. RMI) Location : PT. KIDECO JAYA AGUNG, Tbk

Duration : January 05, 2009 – Present

Position : Surpervisor, Inspector and PIC Electrical

Project name : ROAD EXPANTION KEC. BATU SOPANG KAB. PASIR Location : PT. KIDECO JAYA AGUNG, Tbk

Duration : September 1, 2008 – Present

Position : Coordinator, Inspector and PIC Electrical

Project name : 3 GENERATOR SET 1000KVA AND SYNCHRONYZE PANEL

(RMC)

Location : PT. KIDECO JAYA AGUNG, Tbk

Duration : February 09, 2009 – Present

Position : Coordinator, Inspector and PIC Electrical

Project name : WORKSHOP B FOR HEAVY DUMP AND DUMP TRUCK Location : PT. KIDECO JAYA AGUNG, Tbk

Duration : July 05, 2008 – December 15, 2008

Position : Supervisor, Inspector and PIC Electrical

Project name : CONTROL PANEL SUBMERSIBLE PUMP 54 KW for DEWATERING PROJECT

Location : PT. KIDECO JAYA AGUNG, Tbk

Duration : January 7, 2008 – January 30, 2008

Position : PIC and Engineering

Project name : INSTALLATION LIGHTING TOWER & ELECTRICAL WIRING WORK (RMC)

Location : PT. KIDECO JAYA AGUNG, Tbk

Duration : March 26, 2008 – October 07, 2008

Position : Coordinator, PIC, and Inspector Electrical Engineer 2. PT. AGRIYA ANALITIKA – ELECTRICAL INSTRUMENT

Position Title : Maintenance Specialist

Position Level : Engineering

Specialization : Maintenance

Job Location : Puri Indah - Jakarta

Industry : Instrument Laboratory

Duration : December, 2005 – January 2007

PT. Agriya Analitika is a company that run business in instrument laboratory and Matrix Lims Software. The company produce HPLC Machine, Spectrophotometer, Data Logger electrical.

Work Description:

Responsibilities

Responsible to achieve efficiency, target & quality

Analyze daily inspect problem & create action plan

Monitoring manpower and instrument status

Ensuring the provision and maintenance of suitable equipments, consumable materials for supporting operational machines

Procedure and each document's of quality

To provide preventative and repair maintenance provision on all applicable equipments

Provide maintenance and courtesy visit schedule to customers

Provide maintenance and courtesy visit report

To cover maintenance and repair for Java & Sumatra area VI. Qualification

Having knowledge on electric modules, single line control drawing, PLC control drawing, electrical device, SNI, IEC (International Electro technical Commission) standard, cable size and specification, drawing of electrical installation design for building

Familiar with data sheet electrical, electrical metering, MCC panel, LDP panel, LPS panel, Relay panel, LCP Panel, VCB panel (Switch gear), ACB panel, GCB panel, Transformer Step-Up and Step-Down, Terminal Box, Soft start panel, CCR control, Synchronous panel, Distribution Panel, Sub distribution Panel, Control Cabin, HMI, Fire fighting, Fire Alarm, elecrical construction, construction method statement, etc.

Having knowledge on general engineering electrical characteristic, field engineering works, typical and applicationable.

Preparation and control as like periodic maintenance, building and construction system, checking drive unit electrical control, setting electrical device.

Strong interpersonal skill, good communication

Proactive, good logic & analytical thinking ability

Highly motivated, attitude to team work



Contact this candidate