Post Job Free
Sign in

Management Project

Location:
Bahir Dar, Amhara, Ethiopia
Salary:
as per the organization scale
Posted:
August 12, 2017

Contact this candidate

Resume:

CURRICULUM VITAE

PERSONAL INRODUCTION

Name: Habtam Achenef Mekonen

Country of Birth: Ethiopia

Sex: Male

Citizenship /Nationality: Ethiopian

Physical Cond.: Good Health

E-mail ****.****@*****.***

Mobile +251-*********

WORK HISTORY

Professional Experience till now is about 15+ years

Durations, Post(Title) & Organization

Duties and Responsibilities

Post, Title: River Basin Management, Planning, Monitoring and Evaluation Unit Coordinator

Organization: MoWIE, TBIWRD Project/World Bank Assisted Project

Duration: 12/08/2012 to date

Analysis of available water resources data

Strategic orientations for actual implementation of integrated water resource planning

A statement of the mean of implementing the plan, including implementing actors, action plan and budget requirement

Water resources planning and management for multiple beneficial uses through and with the aid of DSS (Decision Support System)

Water resource systems simulation/optimization modeling for (a) future investment planning and (b) real-time and/or near real-time operational planning

Data, information, knowledge and decision support bases and systems development and management, including remote sensing and geographic information systems

Stakeholder consultation processes development and application

Social and environmental assessment

Financial and economic analysis

Institutional development and training

Water resources assessment and monitoring (hydrology, hydrogeology, limnology, water quality, etc.)

Water use sectors assessment and management (hydropower, irrigation and agriculture including livestock, fisheries and aquaculture, tourism and recreation, water supply and wastewater disposal, environmental protection and enhancement, etc.)

undertaking (i) Inception, (ii) DSS Development, (iii) Plan Preparation and (iv) Transfer and Institutionalization

Planning, Design, development of water resource in respect to basin and sub basin context

Post, Title: Water Resource Specialist

Organization: Abay/Ethiopian Blue Nile Basin Authority

Duration:09/12/2011-11/08/2012

Formulation of sub-basin planning frameworks including objectives, criteria and scenarios based on current and future envisioned development status;

Development of sub-basin DSSs including knowledge bases and modeling tools;

Preparation of the first sub-basin plans at both individual sector level and integrated sub-basin level, incorporating corresponding strategic social and environmental assessments (SSEA), and including financial and economic analyses andconsideration of institutional management aspects

Formulation of structured stakeholder consultation processes, and application of these throughout the overall planning period;and

Institutional capacity building, covering all planning stages, processes and tasks, with particular focus on transfer and institutionalization of all planning procedures, tools and facilities for continued and sustainable periodic and routine post-projectplan update applications.

Planning, Design, development of water resource in respect to basin and sub basin context

Post, Title: Water Resource Engineer

Organization: Koga Dam & Irrigation Project/ADB Assisted

Duration: 09/09/2011-08/11/2011

Follow up a project under progress in compliance with work schedule,material, man power and others.

Evaluate and submit to the project resident engineer Daily, weekly,monthly project work progress reports

Ensure that the project activities are implemented as the projectagreements.

Monitor the overall technical implementation and resources managementof all construction of the project

Preparation of Bar bending schedules Quantity Surveys and working

Preparation of payments for checking and to give an approval.

Performs other related activities as instructed by immediate boss.

Post, Title: Unit Coordinator

Organization: Watershed, Water harvesting and irrigation development/EU EGS Project

Duration: 22/02/2011---08/09/2011

With the partners, develop a capacity building plan and facilitatetraining courses, cross visits and apprenticeships

Organizes and facilitates joint participatory monitoring programs with the woreda partners and community groups, both technical and management bodies, document lessons and provide feedback to theoffice.

Facilitating and encouraging regular review meeting and review schedules at woreda level and help the different institutions have itworking commitment

Supporting and building the capacity of the front line staffs, including DA’s and PAs and have deeper understanding of the different technical areas, participatory monitoring and evaluation, cross cutting issues and including community empowerment, programapproach and right based approach.

Resolving technical problems/and other issues that field workers and partners face with in his capacity and if not report to the field officefor support

Perform other duties as assigned by the boss.

Post, Title: Food security section v/head

Organization:Food Security,PSNP Specialist/FHI Project

Duration:15/07/2010---21/02/2011

Ensuring that the allocated resources are timely mobilized andproperly used on the site.

Supporting the development of PA level plan including the activities of agriculture, micro-financing, health, nutrition and food securityprojects as being the integral part of the overall plan at PA level.

Supporting and facilitating the woreda plan to include projects plan and thoroughly understood and be accountable for the overall implementation and monitoring and evaluation of the projects;

Making sure that community facilitators have their plans brokendown to annual, quarterly and weekly basis and same is done by the Gender and nutrition expert

Facilitating organizations and strengthening woreda level project steering committee and/or food security task force and assisting in the development of participatory monitoring and evaluation skills/knowledge.

Conducting regular review meetings with the front line staffs and development agents and record lessons and provide feedback to the participants and to the project.

Developing appropriate reporting formats together with the LDM and other relevant technical staffs

Perform other duties as assigned by the boss.

Post, Title: Trade & Industry Vice Head

Organization: Trade & Industry Office

Duration: 11/02/2009 14/07/2009

Supporting the development of PA level plan including the activities of agriculture, micro-financing, health, nutrition and food security projects as being the integral part of the overall plan at PA level

Coordinating the preparation of Woreda training curricula, organizing trainings, preparing audio visual training/learning materials in the Woreda in close collaboration with M & E officer, team members and in consultation with the PM

Checking and confirming the correctness of the reported activities.

Post, Title: Surveyor III, Natural Resource Team leader, irrigation/water supply, soil and water Conservation expert

Organization: Environmental Protection Office

Duration: 09/06/2005 10/02/2009

Facilitates and ensures that the plan at woreda/PA/village level is prepared with full participation of the community and partners

Working closely with woreda partners in planning, implementing and monitoring and evaluation of the work activities

Ensuring that policy learning and advocacy related to women empowerment were incorporated at all levels in the planning and implementation and from woreda to PA/village level.

Conducts performance review and appraisal of the employees under his/her supervision according to the policy of the organization

Supporting and coordinating needs assessment, along with woreda partners, PA and village level community institutions, for the capacity building in relation to the work implementation strategies, methodologies, and activities

Post, Title: Water harvesting and irrigation expert

Organization: Water harvesting and irrigation Development

Duration: 27/08/2003---08/05/2005

Facilitates and ensures that the plan at woreda/PA/village level is prepared with full participation of the community and partners

Working closely with woreda partners in planning, implementing and monitoring and evaluation of the work activities

Ensuring that policy learning and advocacy related to women empowerment were incorporated at all levels in the planning and implementation and from woreda to PA/village level.

Conducts performance review and appraisal of the employees under his/her supervision according to the policy of the organization

Supporting and coordinating needs assessment, along with woreda partners, PA and village level community institutions, for the capacity building in relation to the work implementation strategies, methodologies, and activities

MAJOR AREA OF COMPITANCY

Capacity building areas on Design and Supervision of projects at integrated watershed/water resource Development &management, water resource planning, data preparation and management, coordination of water resource actors, drafting water resource polices, strategies, directives and programs.

PERSONAL QUALITIES AND PHISICAL FITNESS

Very reliable, efficient and a fast learner I prefer having clear and demanding responsibilities and I take initiative to implement if there is support for new ideas. I can perform my duties in all circumstance including in a very harsh environment like refugees and remote areas. Physically fit to and no disabilities of any type.

HOBBY

Appreciating Cultural Arts, reading different books, attending radio and TV program playing and watching Sport activities like basketball, football etc.

RESPONSIBLE PERSONES

Etatu Misgan: “Bahir Dar” Tel. +251-*********

REFERENCE

Mr. Mesfin Lakew, GIZ Bahir Dar

Mr. Belayneh, GIZ Bahir Dar

Eng. Azeb Mersha, ENTRO, Ethiopia

EDUCATION, TRAININGS, AWARD AND LICENSEs

Education

Institution

PhD candidate, in Hydrology and Water Management

Addis Ababa University, East Africa water management Excellency

MSc. In water Resource engineering (Eng. Hydrology)

Bahir Dar University, Institute of Technology, Faculty of Civil and Water Engineering

BSc. in Soil & Water Engineering and Management

Haramaya University, Institute of Technology

Diploma in General Agriculture

Jimma University

Trainings with Certificates

Principles and Concepts of Hydrological Models

Bahir Dar University

Physically Based Distributed Hydrological Modeling (SWAT)

Bahir Dar University

Ground Water Modelling using MODFLOW

Addis Ababa University

An Integrated approach to Water resource Planning (WEAP Modeling)

International Water Management Institute

Climate Change and Water Resource

Florida International University

GIS and Remote Sensing in Hydrology

Florida International University

GEO NET Cost, HVB, ILWIS

International Water Management Institute

Arc GIS, GPS and Topographic Survey/Map

Productive Safety net

Advanced SWAT

International Water Management Institute

Nile Basin Decision support System (Nile Basin DSS)

Nile Basin Initiative (NBI), Uganda

Optimizations of Water Resource using GAMs Model

Eastern Nile Basin (ENTRO), World Bank

Basin/Hydrologic Information System

France, SIAP MICRO Consultant

Water Resource Modeling, HECHMS, HecRas, Mike Hydro, Mike Basin, Ribasim

Addis Ababa University,France, SIAP MICRO Consultant

Project Cycle Management

FHI, USAID

Vulnerability Assessments

FHI, USAID

Integrated Water Resource Management

Tanzania, Moshe, Depromat

Project Management

Tanzania, Moshe, Depromat

River ware

Colorado University, USA

PSNP, PIM

Food Security Office, Combolcha

AWARD

Application of Nile DSS on water resource management and planning

Uganda, Entebbe and Kenya

LICENSES

Professional Engineer IV

Ministry of Water and Energy

Driving Licenses I & III levels

Transport Authority

Computer skill

FHI, USAID

DOCUMENTS PRODUCED

1.Multipurpose water resource Planning and Management using Nile Basin Decision Support system, Published

www.iwra.org/index.php?page=286&abstract_id=2989,

http://www.bdu.edu.et/bnwi/?q=Book-of-Abstracts-3rd-Nile-Symposium(nileis.nilebasin.org/system/files/DSS%20Booklet_web.pdf, xvwwc.ipostersessions.com/templates/iposters/gallery.aspx? preview=true)

2.Impact of Climate Change on Hydro-Meteorological Variables in Lake Tana Mean state versus Extreme.

3.Tana sub Basin Water Demand Assessments

4.Tana Sub-Basin Biodiversity Management Plan.

5.Tana Sub Basin Water Resource Assessments using SWAT Model

6.Tana Sub Basin Irrigation Development plan

7.Water Balance at Akusty and Kasry watersheds with Tottori University, Japan

8.Water Balance at plot scales with Tottori University, Japan

9.Water allocation plan of Tana Sub Basin

10.Sediment modeling report of lake Tana

11.Phosphors modeling report of lake Tana

12.Nitrogen modeling of lake Tana

13.Tana Sub basin strategic integrated water resource management plan



Contact this candidate