Post Job Free

Resume

Sign in

ISO Document Controller

Location:
Pasay, NCR, Philippines
Salary:
18000 UP
Posted:
August 09, 2017

Contact this candidate

Resume:

RESUME

RONALDO A. DIAMSE

****g Interior Leveriza St. Brgy. 34, Postal Code 1306, Pasay City, Manila

Permanent email address: ac1qfr@r.postjobfree.com

Contact Mobile Number: +639********* or +632*******

Educational Background

Far East Military Academy, Quezon City Philippines

Bachelor of Science in Business Administration, March 30th,1986

Major: Business Management

Purpose

Responsible for managing company documents while also ensuring their accuracy, quality and integrity. Managing QA/QC manuals/procedures, Internationals Codes, Design, Drawing, Fabrication, Welding, Earth Works, HSE, Inspection Test, Training, Sub-Contractors, Material Procure, Non Conformance Result on site and helps the company adhere to record retention policies, safeguard information and retrieve data more efficiently and maintain various aspects of document control, including document archiving/audits, document chaser and document imaging, I usually work with documents such as engineering drawings, inspection instructions, confidentiality agreements, material specifications and mixing instructions. Organize records, develop systems and conduct audits from staff members to project inspectors to project designers.

Key Experience Summary

Majority have been expose related to the construction engineering, cone roof fabrication, Pipe Racks installation,Fire Water Tanks, Heavy Steel Structures and hook-up of onshore Oil and Gas Platforms, Copper/Cobalt Mining Construction & Facilities, LNG Plants, GTL Plant, Petrochemical Plants, Telecommunication upgrading projects, familiar with Saudi Aramco SAEP–128 security and control procedures for engineering data outside Saudi Aramco and SAEP–334 certification and submittal of all Saudi Aramco engineering (CADD) LIP Dharan, Saudi Aramco Saudi Aramco Uthmaniyah Gas Plant, Saudi Aramco Ras Tanura Oil/Gas Refinery, Saudi Aramco Shedgum Gas Plant, SIDPEC Ethylene and Petrochemical Plant in Egypt, Sabic Hadeed Steel Plant, Sharq Sabic Petrochemical Ethylene/Glycol Plant KSA, NC41 & Wafa Coastal LNG Oil & Agip Gas Treatment Plant Mellitah Libya, Ras Laffan Qatar Technip/Air Products/Oryx Gas to Liquid Plant, Messaeed Qatar Vinyl Plant, Qatar Steel Plant, JGC Dolphin Gas Project Ras Laffan Qatar, Architectural Designed/ Engineering Consultancy Projects for the Construction of 5 Star Hotels in Doha Qatar.

Computer Skills

Hardware: IBM PC, Power Macintosh, Interpro/Microstation Workstation, LDScanner 4000, OCE9800 Scanner/Plotter, HP Plotter Design Jet v5.35/Printer.

Software: Windows 2000, Windows 7, Microsoft Office 2007, TEC Japan VPMS DBase program, Saudi Aramco FilemakerPro. Database, Microstation SE ver.5, IRAS/B (for printing CADD), Autoview, ModelServer TeamMate Windows Client engineering drawings, Snamprogetti AIM Milano Intergraph Directa Database ver 3.3, Joomla.

Employment History

July. 21, 2016 - Dec.12, 16 : Group Five Projects, Democratic Republic of Congo, Africa

Job Site : SEK/SENET Kipoi Copper Mining Project

Position : QC Document Controller

Duties & Responsibilities :

Receiving, dispatching and filing of all technical and non technical documents in and out of the office.

Maintain the full flow / control of documents as per ISO standard.

Prepare monthly and weekly reports of all tasks & keeping the photographic log in date order, to support the projects planner.

Filing and log in of Material Submittals, Method of Statements, RFI's etc in a more professional way.

Speed-up documents preparation, creation to records, and information retrieval while maintaining the accuracy and traceability of each documents stage.

Resolve conflicts between departments regarding control of the quality and assure the proper flow of information through eliminating unnecessary activity, changing present forms, and adding new forms and work flow necessary for the activities.

Impressive organization of records that was became a pattern for most of the staff which also captured the attention of ISO external auditors.

Maintain the log showing the percentage chart for Non- Conformance Notification, Safety Violations, General Site Advise, and Site Instruction.

Full responsibility of the finished project documents and archive them separately in office store in a highly professional way, as it can be easily recovered in the future.

Prepare Request for Information (RFI) check list and E-log within 24 hours prior to inspection.

Prepare Material Submittal for Approval to the Consultant.

To prepare Progress Report every week and end of the month.

To ensure that all other discipline activities that required inspection within the activity have been inspected and approved.

Maintain the full flow of drawing register as per ISO standard.

Nov. 9, 14 - July. 19, 2016 : Mallard Duck Raising/Egg Supplier/Hog Raiser

Job Site : San Miguel Bulacan, Paliwasan Philippines

Position : Farm Manager

Duties & Responsibilities :

: Planning finances and production to maintain farm progress against budget parameters;

practical activities, e.g. driving tractors, operating machinery, feeding livestock, spraying fields, etc;

Marketing the farm's products and Dispatch Controller;

Buying supplies, such as fertiliser and seeds;

Arranging the maintenance and repair of farm buildings, machinery and equipment;

Planning activities for trainee staff, mentoring and monitoring them;

Maintaining and monitoring the quality of yield, whether livestock or crops;

Maintaining a knowledge of pests and diseases and an understanding of how they spread and how to treat them.

May 19. 14 – Nov. 7, 2014 : ACF International Philippines International NGO’s, Madrid Spain

Job Site : 843 Eurovilla 4, Arnaiz St. San Lorenzo, Makati City Philippines

Position : Document Control Manager (Finance Dept.)

Duties & Responsibilities:

Responsible to ensure electronic capture, physical management of the documentation and retrieval of quality documents and records by reviewing, evaluating and processing changes accurately and in a timely manner while ensuring that they meet ACF and donors guidelines. Ensure that all the necessary original documents needed to justify contracts according to donors’ guidelines are provided. Support the mission in reducing the financial and reputational risks linked to the justification of grant contracts.

Dec. 13, 12 - Apr. 15, 2014 : Mallard Duck Raising/Egg Supplier/Hog Raiser

Job Site : San Miguel Bulacan, Paliwasan Philippines

Position : Farm Manager

Duties & Responsibilities

Planning finances and production to maintain farm progress against budget parameters;

practical activities, e.g. driving tractors, operating machinery, feeding livestock, spraying fields, etc;

marketing the farm's products;

buying supplies, such as fertiliser and seeds;

arranging the maintenance and repair of farm buildings, machinery and equipment;

planning activities for trainee staff, mentoring and monitoring them;

maintaining and monitoring the quality of yield, whether livestock or crops;

maintaining a knowledge of pests and diseases and an understanding of how they spread and how to treat them.

Sept. 28, 08 - Nov. 13, 2012 : Group Five Projects Int’l, Democratic Republic of Congo, Africa

Freeport-Mcmoran Mining Copper & Gold USA / Hatch Canada

Job Site : TFM Copper/Cobalt Mining Proj. PH II, DR Congo Africa

Ausengco Minerals Limited PTY and Anvil Mining of Australia

Job Site : Kinsevere Mining Project Stage 2, DR Congo Africa

Freeport-Mcmoran Copper & Gold Inc. USA / GRDMinproc Australia

Job Site : TFM Copper/Cobalt Mining Proj. PH I, DR Congo Africa

Position : QC Document Controller

Duties & Responsibilities :

Receiving, dispatching and filing of all technical and non technical documents in and out of the office.

Maintain the full flow / control of documents as per ISO standard.

Prepare monthly and weekly reports of all tasks & keeping the photographic log in date order, to support the projects planner.

Filing and log in of Material Submittals, Method of Statements, RFI's etc in a more professional way.

Speed-up documents preparation, creation to records, and information retrieval while maintaining the accuracy and traceability of each documents stage.

Resolve conflicts between departments regarding control of the quality and assure the proper flow of information through eliminating unnecessary activity, changing present forms, and adding new forms and work flow necessary for the activities.

Impressive organization of records that was became a pattern for most of the staff which also captured the attention of ISO external auditors.

Maintain the log showing the percentage chart for Non- Conformance Notification, Safety Violations, General Site Advise, and Site Instruction.

Full responsibility of the finished project documents and archive them separately in office store in a highly professional way, as it can be easily recovered in the future.

Prepare Request for Information (RFI) check list and E-log within 24 hours prior to inspection.

Prepare Material Submittal for Approval to the Consultant.

To prepare Progress Report every three days and end of the month.

To ensure that all other discipline activities that required inspection within the activity have been inspected and approved.

Maintain the full flow of drawing register as per ISO standard.

May 21, 07 – Jul. 30, 08 : HOK Canada (Design Consultant/PMC), Doha Qatar

DCC Expansion 5 Star Hotels Projects for Marriott, Shangri-la, Rotana and Merweb

Al Faisal Holding / Cansult Maunsell Canada- AECOM / Hanscomb / SNC-Lavalin

Job Site : Doha City Center Expansion Project Qatar

Position : Senior Document Cum Office Administrator

Duties & Responsibilities

Responsible to Project Director for all aspects of administrative and document control systems, a complex project consisting of 5 of 50 storey 5 star hotel towers, 2 of 8 storey podium levels and 3 levels of basement. Duties included the monitoring of incoming and outgoing documents, elements of Civil, Mechanical, Electrical, Piping, Interior Design drawings, Architectural/Structural design submittals Specifications, shop drawings and Material submittals, liaison with the Contractor and Project Managers and ensuring that HOK designed working drawings and specifications were prepared in accordance with the contract and that all sub contractors document submission on site were carried out in conformity and serves as departmental resource on activities supervised and clerical procedures; assists managers and professional staff in organizing work processes and coordinating work through the department/division; resolves intra-departmental operational problems; serves as central point within department/division to ease management/administrative communication, Acquiring Employees Visas and permit, Liason to various Qatar Local Agencies.

Feb. 04, 06 – May 20, 07 : Pipetech Middle East W.L.L., State of Qatar

Affiliates of Pipetech AS Norway

Aqua Milling® and Hydrokinetic™ industrial Pipe cleaning Technology

Job Site : Salwa Industrial City, Doha Qatar

Position : Document Controller Cum General Services

Duties : Responsible to General Manager for all aspects of document control systems, SS Pipes Sales and Marketing, Aquamilling support Field Techinician for various clients such as Technip Italy / Air products PLC / Oryx Gas to Liquid Plant, Messaeed Qatar Vinyl Plant, Qatar Steel Plant, JGC Dolphin Gas Project Ras Laffan Qatar and with an additional function as HR & general services maintainer for Company Staff Housing.

Sept. 1, 05 – Feb. 3, 06 : Air Product Chemical PLC, State of Qatar (manpowered supplied thru Pipetech ME)

Plant Project : Technip Italy / Air Product Chemical PLC / ORYX GTL - Gas to Liquid

Job Site : Air Separation Unit 10 Gas to Liquid Plant, Ras Laffan Ind.City, Qatar

Position : Senior Document Controller

Duties & Responsibilities :

: Responsible to Field Engineering for all aspects of document control systems were required to accommodate the requirements of the various archives as per ORYX GTL / Technip QA Quality Plan for Civil, Mechanical, Piping Isometrics, Piping Test Packages, Electrical and Instruments, P&ID’s and Vendor documents etc.

Oct.27, 03 – Mar. 15, 05 : Snamprogetti Libyan Branch (San Donato, Milanese Italy)

Snamprogetti/ABB Lummus Gas/Hyundai Engineering of Korea

AGIP/SNC Lavalin/ENI Gas BV Western LNG Gas Project

Job Site : NC41 & Wafa Coastal LNG Gas Treatment Plant Mellitah, Libya

Position : Document Control Supervisor

Duties

: Responsible to Field Engineering Manager for all aspects of CSR and or Documentation and the Contractors DCC development and implementation of procedures suitable for use on a project where separate document control systems were required to accommodate the requirements of the various archives, and the associated drawing numbering systems. Develop a simple excel databases required by the project for documents archiving and site query systems.

Jan.20, 02 – June 30, 03 : Snamprogetti S.A. Ltd. (San Donato, Milanese Italy)

HNE O&M (Manpower Supplier sponsor/agency)

Saudi Aramco, Ras Tanura Oil and Gas Refinery

J64 Khuff Neat Condensate Fractionation Project

Job Site : Ras Tanura, Kingdom of Saudi Arabia

Position : Document Controller

Duties

: Responsible for the technical supervision of a department of 5 staff. Responsible for the policy and procedures to receive, log, distribute, microfilm and retrieval of all project related documentation.

Oct.15, 01 – Jan. 15, 02 : Sharq Petrochemical Plant (Ethylene/Glycol-SABIC)

Administrative Services Department (IR section)

Job Site : Jubail, Saudi Arabia

Position : Internal Relation Cum Plant Administrator Assistant

Duties

: Maintains and supervises the preparation of monthly catering and Beach Resort functions cost, supporting procurement, requisition for payment, consumption and manpower analysis, petty cash control, prepare monthly budget for ASD equipment, transportation, materials planning and warehousing, service request order, cold work permit, food establishment improvement, new stock/daily requisition, daily sales activities, personnel attendance report and daily gas and diesel consumption report etc.

Supporting the Housekeeping Manager, motivating... operations of the Laundry department with Housekeeping Attendants and Public Area attendants as direct... and public area services, training and counselling associates in duties and policies, providing guest... assistance and satisfaction, and completing all necessary administrative duties and reports

Mar.23, 01 – Oct. 15, 01 : Saudi Iron and Steel Company (Hadeed Steel Plant-SABIC)

HNE O&M (sponsor) Plant Engineering M&SD

Job Site : Jubail, Kingdom of Saudi Arabia

Position : EDMS Technical Archive Controller

Duties

: Maintains all incoming documents for the Plant Engineering Manager and utilizing the Hadeed Engineering SABIC/SAP system for all S/I Engineers HAD 1 & HAD 2 internal inquiry. Scan/Raster image drawings using OCE 9800 machine, plot drawings using Microstation SE ver.5, update and re-entry all attributes in excel format to be converted into a batch file for the Hadeed (EDMS) Engineering and Drawing Management Systems, a designed database for engineering drawings and archiving.

Jan.05, 00 – Mar.02, 01 : Sta. Monica Therapeutic Center

Job Site : Bustos, Bulacan Philippines

Position : Document and Security Coordinator Cum Counselor

Duties

: Executes and responds to all patient care situations that requires expert knowledge to include, but not limited to life and death situations.Evaluates and modifies the plan of care based on observable responses by the patient and the attainment of patient goals duties & responsibilities include but are not limited to providing: teaching and direct patient care, staff development, patient and family teaching, consultation and research.Documents and maintains data on patient's record. Maintains a safe environment. Applies N.A. teaching/learning concepts to patient and family education. Acts as a patient advocate.Participates in quality improvement activities.

Dec.05, 98 – Dec.07, 99 : Toyo Engineering Corporation (TEC Japan)

EEI Corporation (main sponsor)

Company : SIDPEC Ethylene Plant (SEP project), SIDI Kerir Petrochemical

Job Site : El – Amerya Alexandria, Arab Republic of Egypt

Position : Document Control Supervisor

Duties

: Supervises the site central TEC engineering and documentation department for (Piping, Civil, Electrical, Instrumentation, Mechanical, Process, Structural, Telecom, Tank, Fiber Optic Route drawings, Spherical Tanks, VPMS etc.), monitors the proper flow of revision accordingly of all vendors, shipping documents, B.O.M sheets, F.R.I. E.R.I etc. Obtains drawings & interface update information (TEC head office Japan/client site office in Egypt).

Apr.20, 97 – May 05, 98 : GTE Telecommunication S.A. Ltd. (GTE Telecom USA)

Saudi Aramco Shaybah Telecom Infrastructure Project

Job Site : Shaybah Desert Oil Field (Qatar border) Saudi Arabia

Position : Senior Field Document Controller

Duties

:Develop a simple excel database drawing tracking and material information system, using a simple (Access Dbase) for all in-house drawings and Telecom materials. Ensures the system in-order, implied and controlled relevant drawing files on hand. Set-up systems and GTE procedures for site, on controlled vital Saudi Aramco Shaybah Telecom Infrastructure project field construction drawings.

Jan.05, 96 – Jan. 05, 97 : Foxboro Company (Fox U.S.A/Siebe Co. UK)

EEI Corporation (main sponsor)

Saudi Aramco Shedgum Gas Plant, BI-3126-CSR Phase 2 Proj.

Job Site : Shedgum, Saudi Arabia

Position : Document Controller

Duties

: Maintaining and responsible conductor to our sub-contractors DCC meetings, safety and weekly Tool Box report and Administers and set-up an office site procedures for controlling vital revision flow of construction drawings of Foxboro/Saudi Aramco Shedgum gas plant control system replacement project. Supervises and controls all Foxboro materials for Electrical, Instrument, Mechanical, Telecommunication and Fiber Optic Route cables, Foxboro Computers, Software, Hardware Equipment etc.). Interface update information between (Foxboro/Aramco USA & Canada office).

Oct.29, 94 – Oct. 29, 95 : Saudi Engineering Group Int’l (Kentz Corp. UK)

Saudi Aramco General Engineering Services & Design Consultant

Job Site : Al-Khobar, Saudi Arabia

Position : Document Controller

Duties

: Maintained to ensures the system in-ordered, implied and controlled relevant files on hand per Saudi Aramco/SEGI standard. develops system and office procedures for controlling vital clients construction designed drawings. (Piping, Civil, Electrical, Instrument, Mechanical, Telecommunication, Process, Fiber Optic Route, Offshore and Onshore facilities drawings).

Aug.24, 92 – Oct.20, 94 : GTE/CONTEL Federal Systems (GTE Telecom USA)

Saudi Aramco Telecommunication Upgrading Project Dhahran

Saudi Aramco Main Project Management Contractor

Job Site : Dammam, Saudi Arabia

Position : Senior Work Controller Cum Document Coordinator

Duties

: Responsible on a Drawing Database System Saudi Aramco provided a standard Filemaker Pro in MAC environment, to monitor the flow of CADD works and Contel/Aramco drawing revision accordingly. Coordinates all Managers and S/I Engineers to ensure awareness of the team schedules, distribution of time, works progress, critical items required to reach CADD targets.

June 03, 90 – June 03, 92 : Investment Housing Association of the Philippines (IHAP)

Insular Life Building – Main Branch

Job Site : Makati City, Philippines

Position : General Administrator

Duties

:Develops a database system in computer, on all outgoing/incoming clients, concerning “legal matter” documents. Liaison for the delivery of various clients documents, to different local government agencies in the Philippines.

Formal Training and Professional Development:

Registered and Document Control Certified - American International Society - Wilmington, DE USA 19899

Founding Member of Philippine Society of Safety Engineers - Middle East Chapter KSA.

Registered Member: SOPI (Safety Organization of the Philippines Incorporated) Middle East Chapter 1997

DOS, Dbase 3, Lotus 123 - Hands on Computer Training Center, Quezon City, Philippines

Microstation ver. 4 and IRAS 1992 - Arabscan CADD Training Center, Al-Khobar Saudi Arabia

In-House Application Apple Macintosh IISI 1992 - Saudi Aramco/Contel, L.I.P Dhahran, Saudi Arabia

In-House VPMS 1999 - SIDPEC/Toyo Corporation of Japan, El-Amerya Alexandria, Republic of Egypt

In-House Application Docman ver 2.0.021 2001 - Saudi Aramco/Snamprogetti, RT Refinery, Saudi Arabia

In-House Application SABIC SAP system 2000 - Hadeed Steel & Sharq Petrochemical Plants, Saudi Arabia

Safety and Fire Fighting System Training 1997 – GTE/Saudi Aramco, Shaybah Oil Field Telecom Facilities

ISO 9001 certified attendee, GTE Telecom 1997 – GTE/Saudi Aramco, Shaybah Oil Field, Saudi Arabia

Personal References:

Stephen L. Johnston

Site Manager

ORYX GTL Project Ras Laffan Qatar

Air Products Chemicals PLC

Hersham Place, Molesey Road

KT12 4RZ Walton-on-Thames

United Kingdom

Tel.+974-***-****

Engr. Ahmed Al-Shaik

Engineering Manager

Saudi Aramco, Ras Tanura Oil and Gas Refinery, Saudi Arabia

Paul Harrison

Contract Manager

Group Five Projects PTY

9 Country Estate Drive, Waterfall Business Estate, Jukskei View, 1662 South Africa

ac1qfr@r.postjobfree.com

Tel. +243-********* or +27-31-571-****



Contact this candidate