Post Job Free

Resume

Sign in

Project Management Field Service

Location:
Katy, TX, 77493
Posted:
August 08, 2017

Contact this candidate

Resume:

John Michael Havlik

281-***-****

**** **** **. **** ** 77493

ac1p9k@r.postjobfree.com

Career Summary

Having a proven track record of success in many industries I bring excellent problem-solving skills and resourcefulness to any potential employer. My day to day experiences working alongside engineering, management and construction workers has allowed me to become a seasoned leader as well as having a down to earth approach to working with people. I am seeking gainful employment with a company that will continue to challenge me and allow me to grow in the related field.

Professional Experience

Commodity Speculator (4/16-Current)

Oil Trader

Task

Devise short and medium-term trades through fundamentals, mathematics and economic reports for profit

Responsibilities

Create accounts with clearing firms

Create accounts with front-end execution firms

Risk management

Use multiple strategies daily to make profitable trades

Develop new trading strategies

Test Strategies in real-time and through mathematics

Money Management

Maintain records of profits and expenses for tax purposes

Research various products and tools to assist in daily trades

Develop trading schedules based on economic events

Network with other traders

Calculate profitability of trades per individual firms

Havlik & Koch (9/14-4/16)

General Contractor – Owner

Task

Construct, patios, outdoor kitchens, pool renovations and back yard structures to the customers satisfaction

Responsibilities

Scheduling and planning

Ordering materials

Bank rolling company

Overseeing day to day operations

Creating new business

Meeting with customers

Pulling permits

Moore Control Systems (6/10-4/12)

Superintendent and Electrical Technician

Task

Oversee the construction and commissioning of projects in Oil and Gas fields.

Responsibilities

Lead daily safety meetings and ensure safety procedures are followed

Work with project management and construction management during the duration of job to ensure all materials, equipment and personnel are readily available

Complete material take-offs, order material and equipment to ensure a timely completion of the project

Fill out daily reports, time sheets, incident reports and field service tickets

Attend weekly meetings with customers and contractors to troubleshoot any problems and set schedules for start-ups and maintenance

Work with customers and engineering to set the specifications of the control systems, scaling, calibration and shutdowns

Instruct employees and coordinate daily activities

Ensure that construction of project is built per drawings, specifications and code

Work with Project management and Engineering to troubleshoot discrepancies

Retain all paperwork during the duration of the job and provide the customer with a package after completion

Research and design instillation packages when drawings were not available.

Redlined discrepancies on control system drawings

Work with plant management to integrate systems

Document meetings with customers

Input parameters on the Level, Flow, Pressure and Differential Pressure Transmitters using a Hart Communicator

Inputting parameters on Foxboro devices

Test devices using hand pumps

Perform Function Test of all devices to PLC/DCS, and Switchgear and ensure a proper response in the field

Check Alarms and Shutdowns through Function Testing

Set-up pneumatic valves

Check motor rotation and correct if necessary

Set up Field-Vue pneumatic valves

Calibrate I/P’s and test proper function

Maintain and troubleshoot Switchgear

Megging cables and documenting results

Create Loop Folders

During Commissioning ensure that all devices, valves ect. Are installed per flow direction and within proper operation ranges per line pressure

Ensure all tubing is fastened correctly to devices

Verify all devices are installed in correct location per P&ID’s

.

Havlik & Koch (5/09-5/10)

General Contractor – Owner

Task

Provide customers with construction services after catastrophic events.

Responsibilities

Door to door sales

Use Exactimate to provide customers and insurance companies with accurate estimates of damages

Meet with adjusters

File claims for customers

Bankroll jobs

Order materials

Amend estimates

Pull permits

Provide contractors

Bond and Insure jobs

Build back customers’ homes to customers specifications

Siemens (11/08-2/09)

Field Service Technician

Task

Worked with engineering to ensure the reliability of Motor Starters and Transformers by performing maintenance and repairs during shutdowns

Responsibilities

Perform Hi-POT testing on high voltage cables and document all test results

Follow all lock-out/tag-out procedures to ensure the safety of coworkers and myself

Remove, test, maintain and rebuild 480v switchgear

Install new monitoring systems in Motor Control Centers

Perform Turns Ratio Testing

Perform Digital Low Resistance Ohm testing (D.L.R.O.)

Change oil in transformers

Checking shut downs on transformers and incoming power feeds through C.T.s, P.T.s and other shutdown devices

Suit-up in high voltage Flash Suits and disconnect incoming feeds in M.C.C.s and Substations

Scott Electric (8/08-11/08)

Head Instrument Technician (Turn-Around)

Task

Worked with engineering and project management to complete a successful turn-around at the Three Rivers Valero Refinery also new construction. As head of the instrumentation department, I oversaw a multitude of projects, which included the installation and calibration of many transmitters, solenoids, I/p, p/I, level switches and many other devices

Responsibilities

Identify locations of devices by referring to the p&id’s

Oversee the installation of all devices

Ensure all devices were capable of operating within the parameters of its task

Research and provide documentation for individual devices, which would be a reference for future technicians

Input parameters of all devices before installation

Complete point-to-point testing procedure to determine proper installation of all devices

Test all alarms and shutdowns back to the PLC/DCS to determine functionality

Order all material to ensure a timely completion of projects

Complete permitting every morning before work could begin

Moore Control Systems (6/07-6/08)

I/E Technician

Task

Assisted engineering in the commissioning and start-up of new facilities.

Responsibilities

Input parameters on the Level, Flow, Pressure and Differential Pressure Transmitters using a Hart Communicator

Inputting parameters on Foxboro devices

Test devices using hand pumps

Perform Function Test of all devices to PLC/DCS, and Switchgear and ensure a proper response in the field

Check Alarms and Shutdowns through Function Testing

Set-up pneumatic valves

Check motor rotation and correct if necessary

Set up Field-Vue pneumatic valves

Calibrate I/P’s and test proper function

Maintain and troubleshoot Switchgear

Megging cables and documenting results

Create Loop Folders

During Commissioning ensure that all devices, valves ect. Are installed per flow direction and within proper operation ranges per line pressure

Ensure all tubing is fastened correctly to devices

Verify all devices are installed in correct location per P&ID’s

Moore Control Systems Inc. (6/06-6/07)

Electrical Superintendent

Task

Oversee the construction and completion of projects in an industrial setting

Responsibilities

Lead daily safety meetings and ensure safety procedures are followed

Work with project management and construction management during the duration of job to ensure all materials, equipment and personnel are readily available

Complete material take-offs, order material and equipment to ensure a timely completion of the project

Fill out daily reports, time sheets, incident reports and field service tickets

Attend weekly meetings with customers and contractors to troubleshoot any problems and set schedules for start-ups and maintenance

Work with customers and engineering to set the specifications of the control systems, scaling, calibration and shutdowns

Instruct employees and coordinate daily activities

Ensure that construction of project is built per drawings, specifications and code

Work with Project management and Engineering to troubleshoot discrepancies

Retain all paperwork during the duration of the job and provide the customer with a package after completion

Research and design instillation packages when drawings were not available

Redlined discrepancies on control system drawings

Work with plant management to integrate systems

Document meetings with customers

Moore Control Systems (1/05-6/06)

Industrial Electrician

Task

Worked as an Electrician in an Industrial setting throughout the states

Responsibilities

Install multi-conduit with parallel bends

Identify cables per drawings and install in conduit/cable tray

Install and pack seals

Install devices per P&ID’s

Wire multi-phase motors, solenoids, transmitters, switches, fire and gas detection equipment and additional control wiring

Cadweld and additional grounding installation

Attend Safety Meetings

Perform Material take-off

Adhere to proper safety procedure

Take instruction from management

Install buss bar in switchgear

Point to Point testing

Install incoming power feeds

Sullivan Construction (6/03-1/05)

Custom Home Construction – Trim Carpenter

Task

Install trim and cabinetry per specifications in custom homes

Responsibilities

Coordinate with General Contractor to complete homes per customers satisfaction

Moore Control Systems (6/00-6/03)

Shop Foreman/ Electrician

Task

Acted as a working foreman in the production of Fuel-trains and additional skids

Responsibilities

Ensure proper materials were used in the construction of skids and piping.

Confirm proper bolting was used during assembly

Perform hydrotesting and repair leaks

Oversee the installation of electrical conduit and wiring

Install devices per P&ID’s

Complete Material take-offs

Moore Control System (8/98-6/00)

Electrical Apprentice/Fabricator

Task

Assisted in the production of PLC cabinets

Installed lighting

Install conduit on skids, new plants and new construction in existing facilities

Install cable tray and pulling of cables

Hang Unistrut

Fabricate skids

Responsibilities

Attend Safety Meetings

Adhere to safety procedures

Wear PPE

Attend H.A.S.C.

Skills

Function Testing

Inputting Parameters

Device Calibration

High Potential Testing

Turns Ratio Testing

D.L.R.O. Testing

Troubleshooting

Insulation Resistance Testing

DC Voltage

AC Voltage

Fire and Gas Protection

MIG Welding

Fabricating

Education

Houston Community College (8/03-5/04)

Houston Community College (1/13-5/14)

Business References

Bill Havner 281-***-**** Moore Control System Inc.

Chris Riddle 832-***-**** Marathon Oil

Ed Treasure 832-***-**** L-Con.

Josh Eckel 832-***-**** Beach Grove Pools

Todd Roache 832-***-**** Moore Control Systems Inc.

Paula Eckel 281-***-**** Richards Total Backyard Solutions

Doug Sowell 281-***-**** Moore Control Systems

)



Contact this candidate