Post Job Free

Resume

Sign in

Power Plant Engineer

Location:
Quezon City, NCR, Philippines
Posted:
August 06, 2017

Contact this candidate

Resume:

CURRICULUM VITAE

JUROB ISLES NAZARETH

Address: *** **. *.*.**** cor. Lopez Jaena st. Sumilang, Pasig City, Philippines Contact No.: 094******** E-mail address: ac1oy8@r.postjobfree.com Career Objective:

I welcome the opportunity to work for a prestigious company where previous skills and capabilities can be put to efficient use and to gain an in-depth knowledge on technical and leadership aspects. Summary of Skills:

• Have a good organizational skills and the ability to supervise a team to meet an expected output within a permitted schedule. Otherwise, can function professionally on individual tasks.

• Have a good communication skills on both Oral and Written.

• Supervision and consultancy experiences for Pulverized coal-fired power plant.

• DCS operation of Circulating fluidized bed coal-fired (CFBC) power plant

• Pre-commissioning and commissioning of Circulating fluidized bed coal-fired (CFBC) power plant

• Inspection and consultancy services for oil-fired boiler instrumentation

• PLC Programming and Hardware Configuration applied for factory automation and waste water industry using the following automation platforms:

• Micro/Win v4.0

• Simatic Manager Step7 v5.5

• CoDeSys v2.3

• SiemensTIA-Portal v12

• Supervision of installation, calibration and loop checking activities

• Review of control philosophy, P&ID, instrument diagrams, & testing procedures as per process/ site requirement

• Developing QA/QC Engineering Documents such as:

• Method Statements and/or Quality Procedures

• Inspection and Test Plan check sheets

• Job Hazards Assessment Matrix

Organizational Experience:

JACOBS PROJECTS (PHILIPPINES) INC.

Project: Pagbilao 420MW Unit 3 Pulverized Coal-fired Power Plant September 2016 to Present

Owner’s Engineer (Instrumentation and Control)

Job Description- Consultant to the owner (Pagbilao Energy Corporation) mainly for engineering, construction and commissioning activities applied for instrumentation and control discipline. Drawings and technical documents are reviewed and approved prior to the execution of the consortium (Daelim and Mitsubishi) during erection stage. Contractually, we provide guidance to the consortium in managing the work schedule without neglecting the safety and quality requirements. All the site inspections and testing are witnessed to ensure good engineering practice, operability and maintainability. Signing and approval of every activity has been a vital decision, as an OE, because we need to guide the consortium in accordance to the quality engineering practices while strictly implementing safety standard procedures in all areas of activities. Good coordination with the consortium, sub-contractors, operation and maintenance team, and engineering has been very much important to ensure proper flow of information and to help the team in building future plans. An everyday work is about creating solutions, individually or as a team, to provide a more sustainable project output.

AGON PACIFIC, INC.

Project: SM200 1X105MW CFBC Power Plant

March 2015 to April 2016

Commissioning Engineer/ DCS Operator

Job Description- Commissioning engineer participated in functional loop testing to satisfy correct installation and connection of the field instruments to the controllers, also, reviewing/ revising of logic circuits, alarm set point values and DCS graphic faceplate to ensure that all control loops will operate based on P&ID. DCS operation, using Yokogawa Centum VP CS3000, was part of the job performed during boiler refractory curing, electrical and auxiliary systems testing, plant cold/warm/hot start-up, synchronization and full load reliability testing.

As a control commissioning operator, process parameters were supervised continuously and emergency situations were handled confidently to ensure stable condition of plant operation. Have also coordinated with the field operators to establish awareness of the plant condition and maintained daily logs for future reference of owner’s engineers/ operators. More importantly, have implemented safety standard operating procedures in DCS operations and ensured equipment lock out tag out instructions during downtime and repair of each equipment.

AGON PACIFIC, INC.

Project: United Pulp and Paper Co.,

50MW Oil-fired Power Plant Project

Feb 23 to March, 2015

Instrumentation Inspector

About the Project- United Pulp and Paper Co. has shut down its 50MW oil-fired boiler for 5 years and then decided lately to evaluate the equipment condition for the next operation. Job description- Provided advisory services to the owner and inspection on existing instrumentation system on boiler and boiler auxiliary areas.

DMCI ENERGY

Project: 1X15MW Semirara CFBC Power Plant Project

September 2013 to February 2015

Instrumentation and Control Engineer (II)

Job description- Reviewed technical documents and drawing plans. These documents includes P&ID, flow diagrams, instrument loop diagram, and DCS logic circuits.

Supervised a limited skilled and non-skilled manpower in completing I&C construction works and managing allocated resources and work schedules to meet target output on time. Such activities include cable pulling, conduit and cable tray installation, airline and impulse tubing, wiring termination, and continuity checks. Have supervised installation, calibration, configuration and loop testing of instruments such as Pressure (Emerson Rosemount pressure and DPT), Analyzers (+GF+ and HACH pH, ORP and conductivity), Flow (Electromagnetic and flow sensors like orifice plate and nozzle), Level (magnetic flap, radar, ultrasonic and float switches), as well as motorized valves, safety valves and VFDs.

Have revised and produced QA/QC documents applicable for power plant construction that focuses on process instrumentation discipline to ensure safety and quality of every implemented work. Such paper includes Method Statements, Inspection and Test plan check sheets and Job Hazards Assessment forms. I&C Commissioning Engineer

Job description- Have conducted factory acceptance tests and site acceptance tests which are vital for distributed control system architecture established in a CFBC power plant. This control system includes stand-alone control systems such as PLC and IEPC that support the operation of other subsystems. Performed functional loop and interlock testing to satisfy correct field to control connection and to ensure that all safety interlocks are working. Participated in the boiler operation and plant process supervision using GE Nexus OC6000e platform. Accomplished troubleshooting on instrumentation and misconfiguration of PLC dedicated for Emergency Turbine Trip System (ETS) that had solved few plant trip incident in the said project. All activities accountable of were implemented with safety precautionary measures to avoid any delay on activities. SIEMENS PHIL.

June to Dec 2012

Cadet/Trainee

Responsibilities:

• Worked with Industrial Automation Group

• Participated on the following projects

v Ladder programming using TIA Portal v12 (SiemensS7-1200PLC) for Maynilad Wastewater Project v Assisted in upgrading SCADA screens using WinCC platform for PMFTC, Inc., Batangas, Phil. v Conveyor instrument inspection and assisted in HMI panel installation and configuration for PMFTC, Inc., Marikina City, Phil.

TRAININGS/SEMINARSATTENDED (Certificates are available upon request)

Leadership Training; Leading the People Workshop Program Jacobs Projects (Philippines) Inc., March 8-9, 2017

Mechatronics Servicing NCII (TESDA Certification) Mechatronics Technologies Corp. May 20- June 13, 2013

Basic WinCC Flex (HMI Programming)

Siemens, Inc., November 19-23, 2012

Advanced PLC Service Maintenance Programming

Siemens, Inc., October 1-5, 2012

Basic PLC Service Maintenance Programming

Siemens, Inc., July 9-13, 2012

ACADEMICEXPERIENCE:

/Ranked 18 in the Instrumentation and Control Engineering Certification exam facilitated by Philippine Instrumentation and Control Society (PICS) last October 2013

/Programmed the S7-300 PLC for “Motion-Detected Lighting and Air-conditioning Control and Monitoring System for RTU AB401”; a project thesis about building automation which uses motion sensors and proximity switches to control the temperature, room projectors, and ceiling lights of a room.

/EDUCATION:

RIZAL TECHNOLOGICAL UNIVERSITY, Mandaluyong City

Bachelor of Science in Instrumentation and Control Engineering Dean’s List: (2008-2009 GWA=1.67 and 2009-2010 GWA=1.70)

/AFFILIATIONS:

Licensed Instrumentation and Control Engr., CICE: 0830-2013 Philippine Instrumentation and Control Society Memeber (2008-Present) RTU Supreme Student Council Scholar (2008-2013)

Mayor Bobby C. Eusebio Scholar (2003-2013)

REFERENCES:

Mr. John W. Thomas Mr. Raymundo P. Pronda

Senior Power Plant Consultant Area Manager

Jacobs Phils. Megawide Construction Corporation

Don Chino Roces, Makati City 20N Domingo St., Quezon City, Phils. Mobile: 092******** Mobile: 091********

e-mail: ac1oy8@r.postjobfree.com e-mail: ac1oy8@r.postjobfree.com

Mr. Thomas has been my mentor Mr. Pronda was my project director at Semirara plant in power plant construction management

Mr. Jimmy T. Meneses Mr. Andy Horsnell

Senior Technical Consultant Principal Project Manager AGON Pacific Phils. Jacobs Projects (Philippines) Inc. Sen. Gil Puyat St., Makati City, Phils. Makati City, Phils. Mobile: 091******** Mobile: 091********

e-mail: ac1oy8@r.postjobfree.com e-mail: ac1oy8@r.postjobfree.com

Mr. Meneses is my mentor in power plant Mr. Horsnell is my immediate manager at Pagbilao controls and instrumentation principles power plant. Declaration

I hereby declare that all above mentioned information is true to the best of my knowledge.



Contact this candidate