Post Job Free

Resume

Sign in

Project Engineer

Location:
Duri, Riau, Indonesia
Posted:
August 04, 2017

Contact this candidate

Resume:

Rusydi Hakim

085*-****-****

*

CURRICULUM VITAE

CONFIDENTIAL

Position Drafter Engineering

Name : Rusydi Hakim Sex : X Male Female

Place of Birth : Duri Date : 19 / 09 / 1985 Age 31 I.C. No. : 140***-****** 0086 Validated : 19 / 09 / 2017 Do you live in: Own House X

Home Address : Tribrata Hangtuah Street

Rented House

Kelurahan Babussalam No. 8i

With Parents

Others

Phone / Mobile No. :

085*-****-****

Marital Status : Marriage Religion : Moslem Race : Melayu Nationality : Indonesia Health Insurance : Inhealth No. :

100*******

717

PTKP :

Jamsostek / Askes No. : 140********

NPWP No. : 69.647.232.3-219.000 Blood : O

EDUCATION

FROM – TO (YEARS) INSTITUTION MAJOR PROVINCE

2007 2009 Polytechnic Of Andalas University Technic Civil (Bachelor Degree) West Sumatera

2004 2007 Polytechnic Of Andalas University Technic Civil (Diploma) West Sumatera 2001 2004

Senior High School Of State 2, Mandau -

Duri Science Class Riau

1998 2001

Junior High School Of State 2, Mandau -

Duri - Riau

1992 1998

Elementary School Of State 004, Mandau

- Duri - Riau

Program / Application Auto Cad 2010, 2016 Fluent Fair Poor Microstation V8i 2010, 2014 Fluent Fair Poor

Microsoft Office Fluent Fair Poor

Sketh-Up 2008, Sketch-Up 2013 Fluent Fair Poor

Sap 2000 V.14 Fluent Fair Poor

Primavera P8 Profesional R8.2 Fluent Fair Poor

Computer proficient

Rusydi Hakim

085*-****-****

2

Language English – Write Fluent Fair Poor

English – Speaking Fluent Fair Poor

Indonesia Fluent Fair Poor

Fluent Fair Poor

ATTENDED COURSES / TRAINING

Period School Name Major City Certificate

January 10, 2014 Rekind WorleyParsons Document Management RW-02, Duri Yes No February 22, 2014

T & D Development

Of RW

H2S RW-01, Duri

Yes No

Mach 09, 2014 HR RW Caoching & Concelling RW-02, Duri Yes No September 04, 2014 PT. Chevron IIF Oreantation Movie Theater, Duri Yes No October 01, 2014 HES RW IIF Living In Action

RW-01 Conference

Room

Yes No

May 25, 2013

PT. Dimensi Barumas

Perdana

Behavior Based Safety &

Working At Height

SO PT. Dimensi

Barumas Perdana

Yes No

May 10-11, 2012

PT. Dimensi Barumas

Perdana

Behavior Based Safety &

Working At Height

SO PT. Dimensi

Barumas Perdana

Yes No

December 22-25,

2011

PT. Chevron Managing Safe Work

Conference Room PT.

Rifansi

Yes No

2011 PT. Rifansi Dwi Putra

Coating System (COM-SU-

5191)

Conference Room PT.

Rifansi

Yes No

2011 PT. Rifansi Dwi Putra

Flocculant Facility About

Construction Process

(Standard ASME B31.3)

Conference Room PT.

Rifansi

Yes No

2010 PT. Tripatra Fluor

Fundamental Safety Work

Practice (FSWP)

Suzuka Hotel

Yes No

2010 PT. Tripatra Fluor HES Induction Suzuka Hotel Yes No 2009 Pusbiktek Bandung Carrier Plan Development

Polytechnic Of

Andalas University

Yes No

2006

Polytechnic Of

Andalas University

Leadership Management

Polytechnic Of

Andalas University

Yes No

2005 PT. Semen Padang

Form Execution Of Safety,

Health & Enviromental (K3) At

Construction Industrial

Polytechnic Of

Andalas University

Yes No

EXPERIENCES:

Name of Company : PT. Rekind WorleyParsons Consortium Position Held : Drafter Engineering Reason for Leaving : - Date of Employment : 29 November 2013 Date of Ended : Present Project / Client CPI Project Name ECM Project (Engineering, Construction, Management)

Job Description

&Rresponsibilities

: Prepare and Make sure data for Drawings (Field and Piping Drawings) based on standard and specification. Prepare drawing corridor improvement, wellpad, road crossing, PSM-PSI drawings, Structure, concrete & cutting plate details. Drawing are piping plan, structure plan, sections and details, cvc header, isometric & material take off or BOM (Bill Of Material). Manifold improvement, piping demolition & detail working drawings as piping woks. Prepare daily activities report, weekly progress, and time sheet. TRAINING (CERTIFICATION)

Rusydi Hakim

085*-****-****

3

Name of Company : PT. Dimensi Barumas Perdana

Position Held : Drafter Engineering Reason for Leaving : Contract Completion Date of Employment : 07 Mei 2012 Date of Ended : 13 November 2013 Project / Client CPI Project Name ECS (engineering Construction Service)

Job Description

&Rresponsibilities

: - Prepare drawing Architect

- Prepare drawing civil, such as foundation plan and detail, structure, etc.

- Prepare drawing electrical

- Prepare & make sure data for drawing (field & piping drawing). Interperts specification & Drawings for the work in change. Prepare drawing piping plan, cvc header, manifold Improvement & detail working drawing as piping works. Prepare as-built drawing, initiates field Change notices, additional work orders & back-changes notices. As-built & create design of Road crossing, & pipe line improvement at corridor.

- Prepare drawing detail air conditioner (split, standing floor & central).

- Prepare drawing clean water, water heater line, sewage & waste water.

- Survey to location with engineer.

- Discuss with engineer, project engineer, FO.

- Daily activities report, weekly progress, time sheet, & monthly report. Name of Company : PT. Rifansi Dwi Putra

Position Held : Civil Engineer Reason for Leaving : Resign Date of Employment : 20 April 2010 Date of Ended : 30 April 2012 Project / Client CPI Project Name EPC (Engineering Procurement Construction)

Job Description

&Rresponsibilities

: - Estimate material requirements of project (based on CPI standard).

- Prepare Technical from Survey tool, the data be transfer to terramodel program and will be processed with microstation program for a good result.

- Do propose design road, those are flexible & rigid pavement.

- Visit to field, ensure those job are based on CPI procedure shop drawing.

- Do propose design, and revise drawing for construction execution based on requirement Of project team.

- Do coordination with TF (consultant) & CPI (user project) for construction work progress.

- Prepare sketch drawing at field, plan drawing, for any additional job from scope project due To CPI request for RFI (Request For Information). Example : Security post at PG&T, walkway Improvement at gate 125 KM, etc.

- Prepare as-built drwaing for close out project.

Name of Company : PT. Jaya Sentrikon Indonesia (Supplier Concrete Pile & Ready Mix) Position Held : Administration & supporting

Civil laboratory

Reason for Leaving : Contract Completion

Date of Employment : February 2009 Date of Ended : April 2010 Project / Client Project Name

Job Description

&Rresponsibilities

: - To ensure the ready mix are goods till pouring concrete at field

- Make supporting letter product to customers ( specification of concrete pile, foundation, Ready mix, culvert, etc)

- Create invoice to customers

- Control ready mix car & then fuel sheet

Rusydi Hakim

085*-****-****

4

I HEREBY CONFIRM ALL THE ABOVE DETAILS TO BE TRUE AND CORRECT. Attachment :

Duri, 24 / 05 / 2017

Rusydi Hakim



Contact this candidate