Objective:

Acquire an Inspectors position with an established Inspection Firm.

Qualifications:

Twenty six years of experience in the Coating/ Fireproofing industrial field.

Successful in operating and owning two industrial businesses in the abrasive blasting/coating field.

Two years of Safety Management in the industrial field at Premcor Refinery

Relationship builder with a wide range of knowledge in the motivation, operation and execution of company policies as well as creating relationships with the clients through customer service.

A reputation as a highly motivated self-starter with strong problem solving skills.

RTJ Inspections.

Flow accelerated corrosion inspector.

Corrosion under insulation analyst.

Moisture barrier analyst.

Specification analyst.

Coating failure analyst.

Concrete Liner Inspections.

NCCER Certification Boilermaker.

NCCER Certified Painter.

TWIC Certified.

Insulation Installation Inspections

Corrosion Under Insulation Inspections

Fireproofing Inspection (Chartek 7 and 1709) Shell Refinery & Kiewit [Olympus] (Corpus Christi Tx)

TSA Inspections & Failure Analyst

FBE Inspections

Piling inspections

Pipeline Inspections

Tank Lining Inspections

Galvanized coating inspections

QA/QC Oil Rig Inspections

Concrete coating inspections

Huet/Water Survival Certified

Certified Bridge Inspection

Internal pipe coating inspection

Work History

Jan 2016 – July 2017 - CCI Inspections/KPI – TIC/Kiewit -GRDA expansion project (QA/Supervision Coordinator)

Review all drawings and piping packages

Perform visual inspection of all paint application activities

Perform Surface Prep profile inspections

Perform wet mil thickness inspections

Perform dry film thickness inspections

Witness paint inventory procedures and locations

Perform insulation inspections

Witness mixing procedures prior to coating applications

Issue and document all coating releases for shipping/receiving purposes

Verify all QC daily reports per specification

Coordinate sub-contractor daily work schedules

Report all activities to Client Management

Nov 2015 – Dec 2016 – Intertek Services – Denbury Project (QA Inspector)

Perform DFT inspection verifications

Perform Visual inspections

Perform Holiday detection inspections

Witness Surface prep procedure applications

Witness coating application procedures

Verify all QC documentations

Perform surface profile inspections

Jan 2015 – Nov 2015 – D&C Inspection Services – CB&I Island Park (Occidental Refinery / Markham Piping Project) (QA Lead Inspector)

Review all drawings and piping packages

Perform visual inspection of all paint application activities

Perform Surface Prep profile inspections

Perform wet mil thickness inspections

Perform dry film thickness inspections

Witness paint inventory procedures and locations

Witness mixing procedures prior to coating applications

Issue and document all coating releases for shipping procedures

Verify all QC daily reports per specification

April 2014 – Jan 2015 - Walzel Services – Lucius Offshore Paint Project OHU (QA Lead)

Review all Kiewit turnover packages

Plan and Execute manpower production in the field

Document and verify all daily progress

Update commissioning schedule paint progress weekly

Monitor all paint crews in field

Verify all daily QC reports per specification

Visual inspection of all paint activities

Perform insulation (Chartek 7) inspections

Perform Abrasive blast profile inspections

Perform Dry Film Thickness inspections

Wet film thickness verification

Witness mixing of all materials prior to application

Coating Adhesion Testing

Visual inspection of all welds in accordance with NACE grade C requirements

Final Visual paint inspection of all completed paint packages prior to document turnover

Sept. 2013 – March 2014 – CW Services – Kiewit Construction (TIC) KCP&L Project (QA Lead Inspector)

Abrasive Blast anchor profile inspection

Surface cleanliness inspection to Concrete and Tanks

Weld inspection in accordance with NACE grade C

Wet Film thickness verification

Dry Film thickness inspection

Holiday detection inspection

Witness mixing of materials prior to application

Review inspection documentation by contractor daily

Review all drawings in accordance with project

Visual inspection of Galvanized items shipped to site

Coating adhesion testing

Visual inspections of concrete coating applications

Visual inspection of coatings (Liners) applied inside all Tanks

Mar 2012 – August 2013- Cisco Inspections – Kiewit Offshore Services (QA Lead Inspector Shell Olympus Oil Rig Project)

Anchor profile inspection

Surface cleanliness inspection

Wet film thickness coating application inspection

Dry film thickness coating application inspection

Visual inspection of fireproofing application (Chartek 7)

Dry film thickness inspection to fireproofing

Review inspection documentations daily

Weld visual inspection

Approve completed items on coatings and fireproofing

Approve manpower timesheets

Witness all mixing of materials prior to application process

Witness all shipping and receiving of materials

Perform Coating Adhesion Testing

Perform TSA Bend Testing

Galvanize inspection

Perform Shell Painter test prior to employment

QA Manager over FP and Coating inspections

Oct 2011- Feb 2012 – CCI Inspections

Jindal Saw Pipe (Fusion Bond Epoxy Pipe Project)

Pipe surface anchor profile inspection

Review all API codes and ASME documentations in accordance with project

Surface cleanliness inspection

Wet film thickness coating application inspection

Dry film thickness coating application inspection

Holiday detection inspection

Abrasive Sieve test inspection

Visual inspection of Fusion Bonding application inspection

Shipping and receiving inspection

FRP visual inspection

Aug 2011 – Sept 2011 – CCI Inspections

Targa Resources.

Precision Dimension Inspection and Verification on OEM parts

Receiving Raw Material Inspection

WETMAG Inspection Verification

Visual inspection of mechanical parts

March 2011- Aug 2011 – CCI Inspections

MLK Bridge Project (Texas D.O.T. Project)

Project inspector overseeing Coating Contractor

Structural surface preparation inspection

Concrete abrasive surface preparation inspection

Coating inspection in reference to SSPC-PA-2

Piping and Structural blueprint inspection verification

Shipping/Receiving inspection verification

Anchor surface profile inspection (SP-10 surface requirements)

Wet film coating inspection

Dry film thickness inspection according to PA-2 standards

Verification of Salts surface inspection

Surface cleanliness inspection per SSPC-SP 1 and 2

Non-Destructive visual coating inspections (PH meter testing and Magnification testing)

Pull Test inspections performed per ASTM 4541

Apr 2011 – May 2011 – CCI Inspections

Key Energy Acid Frac Tanks Project

Project inspector overseeing Coating Contractor at Wichita Tank Facility

Tank surface preparation inspection

Coatings/Liner inspection

Coatings application verification

Shipping/Receiving verification

Manpower verification

Tank blueprint inspection verification

Anchor profile inspection verification ( SP-5 surface requirements )

Wet film coating inspection

Dry film coating inspection verification according to PA-2 standards

Monitor Environmentals of Tank facility

Jan 2011 – April 2011 – CCI Inspections

HESS Bullet Tanks Project

Project inspector over Coating Contractor

Bullet tank abrasive surface preparation inspection

Coatings/Liner inspection

Tank schematics/Blueprint inspection

Manpower verification

Salts verification testing

Anchor profile inspection (SP-5 requirements)

Coatings application inspection

Dry film thickness verification per PA-2 standards

Stripe coat (brush and roll) application inspection

Monitor environmentals daily

FRP abrasive blast surface inspection

FRP dft inspection

Insulation visual inspection

Aug 2010 - Oct 2010 – CCI Inspections

LNVA Project (AECOM Project)

Project inspector

QA/QC manager over Coating Contractor and sub-contractors

Salt barrier gate blueprint verification

Anchor Surface profile inspection per SP-10 requirements

Surface salts testing inspection

Surface cleanliness inspection per SP1 and 2

Coating application inspection

Wet film thickness verification

Dry film thickness verification per PA-2 standards

Environmentals monitored daily

Housekeeping inspection

Disposal of blast media verification

Oct 2009 – Aug 2010 – Supervisor –Brock Srv.

Conoco Phillips - Core Project

Project and budget control

Corrosion Under Insulation inspection

QA/QC inspections of all coatings applied

Bridge inspection

FBE visual inspections

Cost projections

Union craft manpower co-ordinater

Weekly budget meeting coordinator

Anchor profile inspections per SP-5 requirements

Wet film thickness inspection

Dry film thickness verification PA-2 standards

Coating application verification

Pipe Fabrication Schematics Inspections

Shipping/Receiving Inspections

July – 2009 – Oct 2009 – QA/QC Manager/Foreman AZZ Galvanizing (Beaumont Texas)

Managed day to day activities during work shift

Performed estimated cost duties

Managed manpower in the field

Performed visual inspections to all shipping and delivery procedures

Kept daily log sheets of Caustic tank, Pickle tank and Zinc tank levels during operations

Performed DFT inspections to completed items

Maintained safety record in the field

Provided good working relationship with 3rd party inspections

2008 - June 2009 - QA/QC manager

West Coastal Industrial Services

Developed, implemented and managed the QA / QC Program keeping it

in a constant state of improvement.

Oversee inspectors and jobsite inspection reports

Visual inspection of coating applications in the field

Failure analysis inspections

Fireproofing application inspection (Chartek 7 and 1709)

2007 - 2008 - C.U.I. Project Manager (Shell Refinery Deer Park Tx.)

Basic Industries

Managed day to day activities within the refinery

Managed the field crews

Maintained safety record

Established a good working relationship with the client

Cost projections

Estimator

Accounts payable/receivable

Corrosion Under Insulation Inspection (C.U.I.)

Installation of insulation inspections

2003-2007- Quality and Production Coordinator –

C&M Coatings

Management of maintenance projects and client relations

Management of Motiva waterway bridges(blasting & coating)

Project estimating

Labor management

QA/QC Coordinator

Fireproofing application inspection (Chartek 7) Shell Refinery Deer Park Tx.

Insulation installation inspections

Mechanical pumps,motors,and generators schematics inspections

1999-2002 - Safety Technician

Premcor Refinery (Valero Pt. Arthur)

Worked in the safety department of Premcor Refinery. Managed over contractors and their adherence of all Premcor Safety practices and policies.

1991-1999 - Operations Manager

Allphaz Coatings

Managed and maintained all aspects of business including accounts payable, accounts receivable, field surveying, field management, and employee occupational hazard team.

Implemented the company’s safety handbook and its regulations to OSHA standards in the industrial field

QC field inspections with crews performing Blasting and Painting procedures in accordance with coating specifications.

1987-1991 - Journeyman Sandblaster / Painter

Steel Painters, Inc.

Worked as a blaster/painter in the abrasive blasting field.

Began going to college taking night courses in the Health and Safety management field.

Education

1987 – Diploma- West Brook Senior High School - Beaumont, TX

1987 – 1989 - Major in Computer Electronics - Lamar University

2010 TWIC Certified Exp. Nov. 2017

2011 Confined Space Certified #63-5854

2008 - NACE CIP Certified w/ Bridge Certification - NACE Headquarters – Houston Tx.

Huet/Water Survival Certified

Skills

Small equipment operator

Ability to read blueprints, Isometric drawings and P&ID’s

Fluent Spanish Speaking

Proficientt skills in the following software:

oMicrosoft Word

oMicrosoft Excel

oMicrosoft Projects

oMicrosoft Power Point

oMicrosoft Publisher

oMicrosoft Outlook

oMicrosoft Visio

oElcometer Elcomaster program

References

Carl Ray (Project Manager) Texas D.O.T. 409-***-****)

Jonelle Nixon (owner) CCI Inspections 713-***-****)

Chris Long Kiewit (Corpus Christi)

Ralston Coates Kiewit (Corpus Christi)



Contact this candidate