SUMMARY of Operational & Installation Experience and Skills -22 Years
Experience in handling independently projects in Electrical & Mechanical works of Power Plant, STP, WTP, HT/LT Sub Stations, Industrial factories, Hotels, Commercial buildings and Residential buildings.
Career Profile
Design concept requirement and technical discussion with vendors / consultants and technical specification finalization
Review of Pre-Bid technical offers with effective value engineering and vendor’s technical clarification
Review and finalization of post tender vendors technical submission and project completion schedule.
Review and finalization of transformers calculation based on design load requirement
Finalization of required HV / LV switch gears and related electrical distribution system
Review of Cable sizing calculation and finalization of cable schedule and cable termination schedule
Technical confirmation of Electrical equipment’s, cables, lightings, earthing system and lightning protection system
Conducting technical coordination meeting / weekly progress meeting with vendors, clients and consultant
Review of shop drawing obtaining approval from client / consultant
Review of Materials technical specification / shop drawing submission and getting approval from client / consultant
Coordination with client / consultant for factory/site visit to obtain approval for Materials inspection (MIR)
Site quality inspection of installed equipment’s and getting approvals (RFI) and NCR closure.
Document management for approved Materials inspection, request for inspection and good for construction drawings
Resolving site issues and coordination of testing and commissioning
Materials reconciliation and as built drawing coordination.
Technical Exposures
Handling Sub-station(132 KV/11KV, 11KV/0.433KV, Transformers, HT and LT Switchgear panels,, PMCC/MCC consist of SF6,VCB,ACB breakers (133kv,13.8kv,11kv and 0.433kv)
Handling HT and LT power cables up tp 132 KV, control cables and termination, Electrical equipment and machineries, Lighting and Lightning arrester, Earthing, DC system with battery charger.UPS,DG set with AMF.
Handling Mechanical and Electrical works in WTP, STP up to 400 KLD capacity
Installation of factories equipment / Ventilation system / support steel structures and allied with electrical requirement
Bulk tanks and day tanks fabrication and piping installation
ELV system installation - Networking / CCTV / Access control system / Public addressable system (PA system), Fire alarm and talk back system.
Firefighting system consist of sprinkler, wed raiser, External and internal hydrant, foam spray, Fire suppression.
HVAC system consist of centralized chiller plant up to 900 TR, VFD driving, VRV and VAV controls allied with chill water piping, condenser water piping and cooling towers
Plumbing pipe lines consists of water pumping, HOT and cold water, Irrigation system and sanitary ware fittings.
Experience Exposure
April 2016 – June 2017
Worked with Sinmar Company Ltd, Saudi Arabia - Riyadh
Completed 40MW power plant project for Almarai in Al Kharj factory in Saudi Arabia.
Complete Electrical distribution HT/LT/DC and control system
Control instrumentation allied with electrical controls.
Mechanical piping, tanks, Air ventilation fan, cooling tower and support steel structures
Water piping and pumping system
May 2015 – April 2016
Worked with L&W India Pvt Ltd, Bangalore as Manager-MEP.
M/S Ascends IT Park high raised IT Towers at Pune.
oHandling the all Electrical works, STP, HVAC, plumbing, ELV systems,
oCoordination with consultant/Client for approvals.
o Sub vendor finalization, Value Engineering.
oConduction technical coordination meeting and weekly progress meeting.
oProject Execution, Maintaining records and Billing certification.
oBudget control and timely completion of project.
October 2007 – September 2009 - October 2010 – May 2015
Worked with Ascott India Pvt Ltd, Singapore group of company as Senior Engineer-MEP.
Completed SOMERSET GREENWAYS Five star rated Hotel project at Chennai. Handled Electrical works and MEP services activity.
Citadines OMR Apart Hotel at Chennai. Handling the all the MEP activities.
oElectrical distribution HT/LT system
oSTP, WTP installation
oHVAC chiller plant installation
oPlumbing, sanitary ware and Boiler installation
oELV system – PA system, CCTV, Fire alarm, Access control
oLiaise with Government Authorities TNEB.
September 2009 –September 2010
Worked with GULF CONSTRUCTION ELECTROMECHANICAL,
DOHA – QATAR as a PROJECT ENGINEER.
oHandled Electrical activities for QATAR PETROLEUM Villa projects
oQATAR FOUNDATION Educational Institute Electrical works.
March 2005 – September 2007
Worked with SINGAPORE REALTY PVT LTD (A subsidiary of Lee Kim Tah Holdings, Singapore) as Electrical Engineer. Involved integrated township at Siruseri.
oInvolved in Electrical and MEP activity for the show flat (G+3) with Office and all the temporary facilities like Worker accommodation, Block Casting Yard, Work Shop and Canteen.
oCoordinating with Singapore and Local Consultants
oFinalization of design and technical requirements
oLiaise with Government Authorities TNEB.
From February 2002 to March 2005
Worked with C.R. Narayana Rao Architects & Consultancy and S.M.Engineers and Consultancy, Chennai as Electrical Engineer.
Completed Animal Research Centre R&D for Orchid Chemicals & Pharmaceuticals Ltd, Chennai.
oInvolved in Electrical works, HVAC and IBMS system.
Involved in Electrical activities for the project SUKOI-30 Engine Defence project at (HAL) Hindustan Aeronautical Ltd, Koraput, Orissa state.
oEHV System 132KV/11 KV Switch yard,
oHT 11KV/433 V substations system for all the Industrial production plant and internal Electrical distribution system.
oCoordinating with Russian Engineers for installation of imported equipment Erection & Commissioning.
oConducting and Inspection of site works, evaluation of work progress,Checking and verification of presented bills, Coordinating with electrical contractors and client (HAL)
oDesign involvements and short out the issues depending on the site conditions
oCarrying out pre-dispatch inspections such as Transformers, HT and LT panels, DG set and AMF panel
From September 1997 to February 2002
Worked with Pentamedia Graphics Limited, Kelambakkam as Electrical Supervisor. Project extension CD RAM plant and whole campus renovation works.
oInvolved in Electrical and HVAC system for both Projects and Maintenance activities for factory plant and HQ Building, Kodambakam.
oErection, Testing & commissioning of 11 KV/433 V substations systems with 1000 KVA OLTC Transformer, 630KVA Transformer and CT operated LT Services
oDiesel Generators up to 625 KVA, UPS up to 200 KVA
oErection, Testing & commissioning of All LT Panels and DBs, Switchgears and
oAir compressors and motors. Centre plant AC Chiller upto240TR, Window AC, Split AC, Packaging Units and AHU units.
oMaintaining plant logbook and TNEB coordinating works
From July 1994 to September 1997
Worked with Greeta Musical Instruments & Exports Ltd, Chennai as Electrical Supervisor.
oOperation and Maintenance of Transformer, DG sets, Air Compressors, Steam boilers and all electrical plant equipment.
oCoordinating with CEIG Inspection.
From June 1993 to June 1994
Worked with E.I.D Parry India Ltd, Chennai as Trainee.
oPreventive maintenance of process machines and furnace monitoring of production inspection
Personal Details:
Father’s Name : K. Kalaikadan
Date of Birth : 13.05.1973
Qualification : Dip in Electrical & Electronics
Engineering
Year of Passing : April 1993
Class : First Class
Additional Qualification : C - License (Supervisory
Competency Certificate)
No. 27136-Issued on 19.07.2001
Experience : 23 Years
Declaration
I declare that this information and facts stated here in above are true and correct to the best of my knowledge and belief.
Signature of Candidate
[K.SENTHIL KUMAR]