Post Job Free
Sign in

Power Plant Manager

Location:
Chennai, TN, India
Posted:
July 30, 2017

Contact this candidate

Resume:

RESUME

S. GANESAN

**********@*****.***

Mobile: 095********.

Career Summary:

Competent and result-driven professional putting forth over 16 + Years of experience in Power Plant-Erection, Commissioning, Operation & Maintenance.

BOILER OPERATION ENGINNER certificate holder from Government of Tamilnadu-2017.

Education:

Bachelor degree of Mechanical Engineering from Madurai Kamaraj University during the year of 1997-2001 with first class.

Present Employment:

Since July 2016 to till now working with Devki Group of Energy ltd, Nairobi, Kenya

as a Deputy Manager (O & M).

Boiler Specification :

Make : Thermax,

Type : AFBC

Steam flow : 67 TPH

Steam Pressure : 87 KSC

Steam Temperature : 515 DEG C.

Turbine Specification :

Make : M/S Triveni Engineering & Industries Ltd.,

Type : Multistage, Impulse, Nozzle Governed Bleed,Extraction

Cum Condensing.

Capacity : 15 MW

Career Path:

Total Experience: 16+ years.

S.No

COMPANY NAME

FROM

TO

POSITION

1

Vijayanagar Sugars Private Ltd,32MW (Boiler 120 TPH, HTC Turbine),Gadag Dist,Karnataka.

Nov-13

Jun-16

Manager

2

Kesar Enterprises(Sugar)Limited, 44MW (Boiler 190 TPH, HTC Turbine), Baheri, Uttar Pradesh.

Jul-11

Sep-13

Deputy Manager

3

Dalmia Cement (Bharat) Ltd, 27MW(Boiler-140TPH, HTC Turbine), Shajahanpur, U.P

Jan-07

Apr-11

Assistant Manager

4

Shyam Century Private Ltd, 13.8MW(Boiler - 54TPH, HTC Turbine), Megalaya

Jun-06

Dec-06

Shift Incharge

5

Chitra Bio Energy Ltd, 7.5MW (Boiler - 35TPH, Triveni Turbine), Pudukkottai, Tamilnadu.

Sep-05

Jun-06

Shift Incharge

6

Sterlite Copper Private Ltd, 11.2MW (Boiler - 45TPH, Alstom Turbine), Tuticorin.Tamilnadu

Apr-05

Sep-05

O&M Engg.

7

M/s Shri Renuga Textiles Pvt Ltd, 4.5MW (26.5TPH FBC Boiler, Triveni Turbine), Theni, Tamilnadu.

May-01

Mar-05

Engg-Technical

1.Manager (November2013 to June 2016)

ORGANISATION : Vijayanagar Sugar Private Limited,

Gadag District, Karnataka.

Boiler Specification:

Make : ISGEC John Thompson.,

Type : Travelling Grate Boiler,

Steam flow : 120 TPH

Steam Pressure : 109 KSC

Steam Temperature : 545 DEG C.

Turbine Specification:

Make : Hangzhou Turbine-China.

Type : Multistage Bleed, Extraction cum

Condensing.

Capacity : 32 MW.

Responsibility:

Smooth operation and Maintenance of power plant.

Preparing daily reports, MIS Report, Maintenance checklist, and Maintenance planning & Spares management.

Follow up of company targets and budget for operation & Maintenance of the plant with aim to zero breakdown and minimum inventory.

To ensure safety of workmen and equipments.

2) Deputy Manager (July 2011 to Sep2013)

ORGANISATION : Kesar Enterprises (Sugar) Limited, Baheri,

Uttar Pradesh.

Boiler Specification:

Make : ISGEC John Thompson.,

Type : Travelling Grate Boiler,

Steam flow : 190 TPH

Steam Pressure : 114 KSC

Steam Temperature : 545 DEG C.

Turbine Specification:

Make : Hangzhou Turbine-China.

Type : Multistage Bleed, Extraction cum

Condensing.

Capacity : 44 MW

Responsibility:

oProject is successfully Erected and Commissioned in my presence with company scheduled time period.

Smooth operation and Maintenance of power plant.

Preparing daily reports, MIS Report, Maintenance checklist, and Maintenance planning & Spares management.

Follow up of company targets and budget for operation & Maintenance of the plant with aim to zero breakdown and minimum inventory.

To ensure safety of workmen and equipments.

3) Asst. Manager (January 2007 to April 2011)

ORGANISATION : Dalmia Chini Mills Ltd,

Prop: Dalmia Cement (Bharat) Limited.

Unit –II, Nigohi, Shajahanpur, U.P.

Responsibility:

oProject is successfully Erected and Commissioned in my presence with company scheduled time period.

Smooth operation and Maintenance of power plant.

Preparing daily reports, MIS Report, Maintenance checklist, and Maintenance planning & Spares management.

Follow up of company targets and budget for operation & Maintenance of the plant with aim to zero breakdown and minimum inventory.

To ensure safety of workmen and equipments.

Boiler Specification:

Make : Cethar Vessels Ltd.,

Type : Travelling Grate Boiler,

Steam flow : 140 TPH

Steam Pressure : 87 KSC

Steam Temperature : 515 DEG C.

Turbine Specification

Make : Hangzhou Turbine-China.

Type : Multistage Bleed, Extraction cum

Condensing.

Capacity : 27MW

4) Shift Incharge (Jun-06 to Dec-06)

ORGANISATION : ENMAS O&M Services Pvt Ltd.,

Chennai.

Site at: Shyam Century Ferrous alloy ltd,

Megalaya.

Responsibility:

Operation and Maintenance of 15MW DCS Controlled (Micro version) power plant in round clock shift.

Preparing daily reports, Maintenance checklist, and Maintenance planning.

Accountable for running the plants smoothly and avoid down time of the plant from trippings & shutdown planning.

Boiler Specification

Make : Cethar Vessels Ltd.,

Type : FBC Boiler,

Steam flow : 54 TPH

Steam Pressure : 65KSC

Steam Temperature : 485 DEG C.

Turbine Specification

Make : Hangzhou Turbine-China.

Type : Multistage Extraction and Condensing.

Capacity : 15MW

5) Shift Incharge (Sep-05 to Jun06)

ORGANISATION: Chitra Bio Energy Ltd., Pudukkottai.

Responsibility:

Power Plant was successfully Erected, Commissioned in my presence.

Handling the Operation and Maintenance of 7.5MW DCS Controlled (Max version) power plant in round clock shift.

Preparing daily reports, Maintenance checklist, and Maintenance planning & Spares management.

Boiler Specification:

Make : Thermo dyne Technology Limited.,

Type : Travelling grate Boiler,

Steam flow : 35 TPH

Steam Pressure : 65KSC

Steam Temperature : 485 DEG C.

Turbine Specification

Make : M/S Triveni Engineering & Industries Ltd.,

Type : Multistage, Impulse, Nozzle Governed Bleed

Cum Condensing.

Capacity : 7.5 MW

6) O&M Engineer (Apr-05 to Sep-05)

ORGANISATION : Tyco Hofincons InfoTech & Industries

Services Pvt Ltd, Chennai.

Site at: Sterlite Copper Industries (India) Limited, Tuticorin.

Responsibility:

Turbine was successfully commissioned in my presence.

Dealt with Operation and Maintenance of 11.2MW DCS Controlled (Siemens) power plant in round clock shift.

Preparation of Daily Report, Checklist, Maintenance planning. Accountable for running the plants smoothly and avoid down time of the plant from trippings & shutdown planning.

Boiler Specification:

Make : Thermal Systems Limited.,

Type : Waste Heat Recovery Boiler,

Steam Pr,temp,flow : 65ksc,485 deg c,45 TPH.

Turbine Specification:

Make : M/S Alstom Engineering & Industries Ltd.,

Type : Multistage, Nozzle Governed Bleed cum

Condensing.

Capacity : 11.2 MW.

7) Engineer Technical (May-01 to Mar-05)

ORGANISATION : M/S Shri Renuga Textiles Power Plant

Division. Theni.

Responsibility:

Power Plant was successfully Erected and commissioned in my presence.

Operation and Maintenance of 4.5MW DCS Controlled (ABB-Freelance2000) power plant.

Boiler Specification

Make : Cethar Vessels Limited.,

Type : FBC Boiler

Steam flow : 26.5 TPH

Steam Pressure : 65 KSC

Steam Temperature : 485 DEG C.

Turbine Specification

Make : M/S Triveni Engineering & Industries Ltd.,

Type : Multistage, Impulse, Nozzle Governed Bleed

Cum Extraction and Condensing.

Capacity : 4.5 MW.

PERSONAL DETAILS:

Father’s Name : Mr. E. Sivasubramanian.

DOB : 09.05.1980.

Nationality : Indian.

Religion : Hindu.

Marital status : Single.

Languages Known : Tamil, English, and Hindi.

Passport No : P2571335

Date of issue : 07.06.2016.

Date of Exp : 06.06.2026.

Place of Issue : Bangalore.

Time Period to join : One month.

Permanent Address : No: 350 / 287 KRR Nagar 13th Street,Theni.

Theni District-625531,

Tamilnadu.

(S.GANESAN)



Contact this candidate