Post Job Free
Sign in

Construction Assistant

Location:
Cibolo, TX
Posted:
July 31, 2017

Contact this candidate

Resume:

JAMES PLOTTS

**** ******* **

CONVERSE, TX *****

210-***-****

*************@*******.***

CAREER OBJECTIVE

To obtain gainful full time employment within an established company as a Superintendent in the Residential or Commercial Industry.

WORK HISTORY

Carpentry and More Solutions, LLC, Converse, Texas Feb 01, 2016 - Present

Owner

Bid on various commercial construction projects within the United States

Read and interpret blueprints and construction documents to determine project directives, order all materials needed for the projects

Work closely with Project Managers/General Contractors and facilitate working relationships with crew members to prevent problems and conflicts

Specialize in demo work, FRP, frame work, finish carpentry, drywall, stainless steel backings in kitchen area, install seating packages, sheetrock, ceilings, trim and fabricated replacement trim and moldings, build and hang custom doors and frames, installed interior finish items, including wall protection, doors and hardware, toilet accessories, cubicle curtain tracks and TV brackets, and concrete pour back, and electrical signage

Construct safety provisions, including scaffolding, gang ladders, perimeter railings, fall protection and temporary covers, follow established job site safety regulations and maintain a safe and clean work area and monitor all tools and equipment conditions and arrange for repairs when needed

J & J Worldwide Services, Austin, Texas Jun 03, 2011 - Jan 29, 2016

Maintenance Supervisor

Supervised and coordinated schedules and workers to maintain and repair electrical, plumbing, ventilation and other building systems

Responsible for evaluating problematic systems or facilities and determining what installation or repair services need to be performed

Maintained systems and equipment by completing preventive maintenance schedules, restoring, repairing, rebuilding, or replacing faulty or inoperative components and parts

American Trim Works, Pleasanton, Texas Apr 01, 2008 - May 31, 2011

Interior Trim Carpenter

Bid on various projects, read and interpreted blueprints and construction documents to determine project directives, ordered all materials at take-off for the projects

Installed trim and fabricated replacement trim and moldings, aligned and squared frames and forms for installation, framing finish out, developed proficiency in stain-grade trim work, hanging doors and drilling and setting door hardware

Correctly and safely used a variety of hand tools, saws and cutting equipment to carry out job duties

Followed established job site safety regulations and maintained a safe and clean work area

NRP Group, LLC, San Antonio, Texas Apr 09, 2007 - Mar 31, 2008

Assistant Superintendent

Reviewed plans and specs during the schematic design of pre-construction and checked framing for accuracy

Checked all plumbing fixtures, diffusers, and electrical systems were installed per plan specifications

Worked with construction administration consultants to plan field observations on schedule

Oversaw the entire building turnover process, while enhancing communication between all construction management and reported the quality of performance on site to all site construction managers

Determined the project schedule, which included the sequence of all construction activities

Reported the quality of performance on site to all site construction managers

Guided and directed third-party inspectors through project construction, commissioning and closeout

Avoided construction delays by efficiently following through with all site inspections in a timely manner

Carleton Construction, Dallas, Texas Feb 01, 2006 - Apr 02, 2007

Assistant Superintendent

Multi-family project that I oversaw the entire building turnover process, while enhancing communication between all construction management

Determined the project schedule, which included the sequence of all construction activities

Provided safety kits to all construction personnel, which complied with safety protocols for the job site

Guided and directed third-party inspectors through project construction, commissioning and closeout

Galaxy Builders, Ltd., San Antonio, Texas Feb 02, 2004 - Jan 31, 2006

Assistant Superintendent

Conducted weekly production and operations contractor meetings, which facilitated stronger communication and the ability to resolve critical issues

Performed regular job site observations to provide direction for all general contractor personnel

Conducted all critical pre-installation conferences with general contractors, subcontractors, consultants and manufacturer’s representatives

Scheduled all contractors and materials deliveries

Defined clear targets and objectives and communicated them to other team members

Monitored timelines and flagged potential issues to be addressed

Supervised the work of 30 team members, offering constructive feedback on their work performance

American Trim Works, Pleasanton, Texas Feb 01, 1990 - Jul 30, 2004

Assistant Superintendent

Competitively bid on various projects, read and interpreted blueprints and construction documents to determine project directives

Ordered all materials at take-off for the projects

Installed trim and fabricated replacement trim and moldings, aligned and squared frames and forms for installation, framing finish out, developed proficiency in stain-grade trim work, hanging doors and drilling and setting door hardware

Correctly and safely used a variety of hand tools, saws and cutting equipment to carry out job duties

Followed established job site safety regulations and maintained a safe and clean work area



Contact this candidate